Rion-Antirion Bridge Project
LOCATION:
Rion-Antirion Strait, USA
SUBMITTING FIRM:
GEFYRA S.A.
FIDIC MEMBER:
HELLASCO - Hellenic
Association of Consulting
Firms
Top Related
RION-ANTIRION BRIDGE: DESIGN AND FULL-SCALE TESTING OF … · action of the design earthquake, fuse restrainers will fail and leave the dampers free to dissipate the earthquake-induced
RION-ANTIRION BRIDGE: DESIGN AND FULL-SCALE … · 13th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2174 RION-ANTIRION BRIDGE: DESIGN
DESIGN AND CONSTRUCTION OF THE RION ANTIRION …seismic hazard analysis has defined the governing event as a 7.0 surface wave magnitude earthquake originating on the Psathopyrgos fault
Alain Pecker -- Rion Antirion (Presentation)
library.tee.grlibrary.tee.gr/digital/m2401_2500/m2423/m2423_papanikolas.pdf · THE STAY-CABLE SYSTEM OF RION-ANTIRION BRIDGE Panayiotis Papanikolas, Ph.D. Structural Engineer Egnatia
RION - ANTIRIONthost-iabse-elearning.org/video3/Rion Antirion Bridge_Handouts.pdf · 30-may-09 2 sand and gravel clay weak alluviums : 65 m. rion antirion silt g] 1.2 g design spectrum
Design and Construction of the Rion Antirion Bridge ... · philosophy in the seismic foundation design, (Pecker, 1998). Fig. 1: Location of the bridge In the following we will focus
Adjustment of the Rion-Antirion Cable-Stayed Bridge: An ... · adopted for cable-stayed bridges made up of a composite steel and concrete deck.