Schedule-B - 1Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
SCHEDULE B
(See Clause 2.1)
DEVELOPMENT OF THE PROJECT HIGHWAY
1. DEVELOPMENT OF THE PROJECT HIGHWAY
Development of the Project Highway shall include construction of the Project
Highway as described in this Schedule-B and in Schedule-C
2. FOUR-LANING
Four-Laning shall include the Four-Lane Project highway as described in
Annex-I of this Schedule-B and Annex-I of Schedule-C.
2.2 Four Laning shall be completed by the Concessionaire in conformity with the
Specification and Standards set forth in Annex-I of Schedule -D
8/6/2019 Revised Sch B 2
3/17
Schedule-B - 2Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Annex IDescription of [Four Laning]
1. Width of Carriageway
The paved carriageway width shall be 2x8.75 m wide excluding the median.
2. Project Facilities
Project facilities shall be constructed in conformity with Annex-I of Schedule-C
3. Specifications and Standards
The Project Highway shall be constructed in conformity with the Specifications and
Standards specified in Annex-I of Schedule-D.4. Other Features of four laning
Cross Sections
The Project Highway shall be widened to Four-lane dual configuration with paved
shoulder with or without Service Roads. The entire road portion shall be 4-lane and
the bridges and other structures shall also be 4-lane. The typical cross-section along
with different types of cross section required to be developed in different segments of
the project highway are indicated in Appendix BI.
Alignment Plan and Longitudinal Section
The Plan & Profile of project highway is given at Appendix BII in soft copy.
Bypasses & Realignment
There is one by pass in the project highway. The details of bypass to be provided are
as given in Appendix BIII.
Service Road
Service Roads shall be provided in lengths indicated in Appendix BIV.
Proposed Right of Way
The details of the Proposed ROW are given in Appendix BV.
8/6/2019 Revised Sch B 2
4/17
Schedule-B - 3Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
At Grade Intersection
At grade intersections shall be provided at the intersection of Service roads and all
intersecting roads at locations specified in AppendixBVI for major intersections and
in Appendix BVII for minor intersections.
Grade Separated Interchanges
The Grade Separated interchanges shall be as provided as given at
Appendix B VIII
Underpasses
Vehicular Underpass shall be provided at location given at Appendix B IX
Pedestrian/Cattle Underpass shall be provided at location given at Appendix B X.
Major Bridges
Major bridge as listed in Appendix BXI shall be provided, widened, reconstructed, or
extended.
Minor Bridges
Minor bridges as listed in Appendix BXII shall be provided, widened, reconstructed,
or extended.
Culverts
Culverts shall be provided, widened, reconstructed, or extended as listed in
Appendix B XIII
ROB / RUB
Details of ROB / RUB to be provided are given in Appendix B XIV. Following points
shall be taken care of:
i) The proposed span arrangements of the ROB is tentative and subject to change as
per availability of Railway boundaries/ requirement of the Railways.
ii) ROB shall be designed, constructed and maintained as per the requirements of
Railway authorities. The construction plans shall be prepared in consultation with the
concerned Railway authority.
8/6/2019 Revised Sch B 2
5/17
Schedule-B - 4Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
iii) The ROB shall be constructed and maintained by the concessionaire under
supervision of the Railways.
iv) All expenditure related to construction, maintenance and supervision of ROB (except
P & E charges) shall be borne by the Concessionaire.
v) During construction, the existing level crossing shall be widened to 12 meters or two
separate level crossings of 7 meters each shall be provided.
Entry / Exit Ramps and Locations
Entry / Exit Ramps for entering into or exiting from the project highway shall be
provided wherever necessary. A list is given in Appendix B XV.
4.14. Tentative Location of Slope Protection
Wherever the embankment height is more than 3.0m, Slope Protection provision has
been made. A tentative list of such locations is given in Appendix B XVI.
4.15 Utilities
Provision of accommodating utilities shall be made both over as well as underground
wherever required.
4.16 Rainwater Harvesting
As per Ministry of Environment and Forest Notification, New Delhi dated 14.01.1997
(as amended on 13.01.1998, 05.01.1999 and 06.11.2000), the construction of Rain
Water, Harvesting structure is mandatory in and around water crisis area, notified by
the Central Ground Water Board.
8/6/2019 Revised Sch B 2
6/17
Schedule-B - 5Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B ITypical Cross-Sections
Appendix B II
Plan and Profile are enclosed in digital form in CD marked as Appendix B II.
Sl. No
StretchesCross Section
TypeExisting Chainage Design Chainage
From To From To1 298.075 298.350 298.075 298.375 Type-C
2 298.350 302.910 298.225 302.975 Type-A
3 302.910 303.549 302.975 303.615 Type-C
4 303.549 303.786 303.615 303.840 Type-D
5 303.786 304.045 303.840 304.100 Type-C
6 304.045 308.440 304.100 308.500 Type-A
7 308.440 309.265 308.500 309.325 Type-C
8 309.265 311.445 309.325 311.525 Type-A
9 311.445 312.130 311.525 312.200 Type-C
10 312.130 315.450 312.200 315.450 Type-A
11 Palsana Bypass 315.450 316.775 Type-A1
12 Palsana Bypass 316.775 318.000 Type-C1
13 Palsana Bypass 318.000 318.336 Type-A1
14 Palsana Bypass 318.336 318.876 Type-C1
15 Palsana Bypass 318.876 319.456 Type-F
16 Palsana Bypass 319.456 320.875 Type-C1
17 Palsana Bypass 320.875 321.411 Type-F
18 Palsana Bypass 321.411 323.050 Type-A1
19 322.025 322.838 323.050 324.188 Type-A
20 322.838 323.738 324.188 325.088 TOLL PLAZA
21 323.738 327.213 325.088 328.661 Type-A
22 327.213 328.054 328.661 329.404 Type-F
23 328.054 328.461 329.404 329.836 Type-C
24 328.461 329.571 329.836 330.911 Type-A
25 329.571 329.701 330.911 331.036 Type-B
26 329.701 330.436 331.036 331.786 Type-A
27 330.436 332.374 331.786 333.724 Type-B
28 332.374 332.998 333.724 334.334 Type-F
29 332.998 333.683 334.334 335.011 Type-D
30 333.683 334.871 335.011 336.186 Type-B
31 334.871 335.071 336.186 336.386 Type-D
32 335.071 335.334 336.386 336.661 Type-C
33 335.334 335.886 336.661 337.211 Type-A
34 335.886 337.071 337.211 338.386 Type-C
35 337.071 338.481 338.386 339.761 Type-A
36 338.481 339.043 339.761 340.356 Type-C
37 339.043 339.397 340.356 340.719 Type-F
38 339.397 341.047 340.719 341.962 Type-A
8/6/2019 Revised Sch B 2
7/17
Schedule-B - 6Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix- B III
Details of Bypasses / Realignment
1. Bypass
Name of Bypass Existing Chainage Design Chainage Length
From To From To (Km)
Palsana By-Pass 315.450 322.025 315.450 323.050 7.600
2. Realignment
Name ofRealignment
Existing Chainage Design Chainage Length
From To From To (Km)
NO REALIGNMENT IN THE PROJECT STRETCH
Appendix B IVDetails of Service Roads
Sl.No.
ExistingChainage
Design ChainageLength(Km)
Width(m)
Side Crosssection
TypeFrom To From To
1 298.075 298.348 298.075 298.375 0.300 2x7.00 Both Type-C
2 302.900 304.050 302.975 304.100 1.125 2x7.00 Both Type-C
3 308.420 309.290 308.500 309.325 0.825 2x7.00 Both Type-C
4 311.450 312.165 311.525 312.200 0.675 2x7.00 Both Type-C
5 Palsana Bypass 316.775 318.000 1.225 2x7.00 Both Type-C1
6 Palsana Bypass 318.336 318.876 0.540 2x7.00 Both Type-C1
7Palsana Bypass
318.876 319.456 0.580 2x7.00 Both Type-F
8Palsana Bypass
319.456 320.875 1.419 2x7.00 Both Type-C1
9
Palsana Bypass320.875 321.411 0.536 2x7.00 Both Type-F
10 327.048 327.625 328.086 328.661 0.575 1x7.00 Right Type-C
11 327.625 328.000 328.661 329.036 0.375 1x7.00 Right Type-F
12 327.625 328.265 328.661 329.404 0.743 1x7.00 Left Type-F
13 328.265 328.800 329.404 329.836 0.432 1x7.00 Left Type-C
14 332.815 333.325 333.836 334.334 0.498 2x7.00 Both Type-F
15 333.325 334.010 334.334 335.011 0.677 2x7.00 Both Type-D
8/6/2019 Revised Sch B 2
8/17
Schedule-B - 7Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
16 335.188 335.363 336.186 336.361 0.175 1x7.00 Left Type-C
17 335.188 335.663 336.186 336.661 0.475 1x7.00 Right Type-D
18 336.120 337.295 337.211 338.386 1.175 1x7.00 Left Type-C
19 336.195 337.295 337.286 338.386 1.100 1x7.00 Right Type-C
20 338.785 339.535 339.761 340.511 0.750 2x7.00 Both Type-C
The total length of Service Road on both side of project highway is 23.350Km.
Appendix B VDetails of Proposed ROW
Sl.No.
Design Chainage Proposed ROW(In meters)
1 298.075 to 324.338 602 324.338 to 324.938 1503 324.938 to 341.962 60
Appendix B VI
Major Intersections
Sl. No.Existing
ChainageDesign
ChainageCategory of
RoadType of
JunctionRemarks
1 340.197 341.211Bituminous
RoadY Junction
As perprovision inmanual for
specificationand
standards for4-laning of
nationalhighways onBOT basis,the junction
warrantsprovision ofinterchange
8/6/2019 Revised Sch B 2
9/17
Schedule-B - 8Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B VII
Minor JunctionsThe carriageway width shall be 3.75 m wide excluding 2x1.0m Earthen shoulder
Sl. No.
Existing
chainage (KM) Category
Carriageway
Width (M)
Side (Left /
Right))
1 298+050 W. B. M Road 3.75 Left
2 298+300 C. C Road 3.75 Right
3 298+325 Bituminous Road 3.75 Left
4 298+600 Bituminous Road 3.75 Left
5 298+750 Earthen Road 3.75 Right
6 298+800 Bituminous Road 3.75 Left
7 299+175 C. C Road 3.75 Right
8 299+300 Earthen Road 3.75
Left9 300+710 Bituminous Road 3.75 Left
10 300+770 Earthen Road 3.75 Right
11 303+425 Bituminous Road 3.75 Left
12 303+500 C. C Road 3.75 Right
13 305+300 C. C Road 3.75 Left
14 306+600 Earthen Road 3.75 Right
15 307+150 Earthen Road 3.75 Left
16 308+650 Bituminous Road 3.75 Right
17 308+655 Earthen Road 3.75 Left
18 309+500 C. C Road 3.75 Left
19 309+750 Gravel Road 3.75 Right
20 310+800 Earthen Road 3.75 Right
21 311+500Bituminous Road
(PMGSY)3.75 Left
22 311+500Bituminous Road
(PMGSY)3.75 Right
23 313+250 Bituminous Road 3.75 Left
24 314+350 Earthen Road 3.75
Right25 314+500 Earthen Road 3.75 Left
26 316+050 Earthen Road 3.75 Left
27 316+200 Bituminous Road 3.75 Right
28 316+375 Bituminous Road 3.75 Left
8/6/2019 Revised Sch B 2
10/17
Schedule-B - 9Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Sl. No.Existing
chainage (KM)Type of Cross Road
CarriagewayWidth (M)
Side (Left /Right))
29 316+700 C. C Road 3.75 Right
30 318+200 Gravel Road 3.75 Left
31 318+200 Gravel Road 3.75 Right
32 318+650 C. C Road 3.75 Left
33 318+900 C. C Road 3.75 Right
34 319+300 C. C Road 3.75 Left
35 319+300 Earthen Road 3.75 Right
36 319+500 Bituminous Road 3.75 Left
37 319+850 Bituminous Road 3.75 Left
38 320+100 Bituminous Road 3.75 Left
39 322+850 Bituminous Road 3.75 Right
40 323+125 C. C Road 3.75 Left
41 326+600 Earthen Road 3.75 Right
42 327+200 Earthen Road 3.75 Right
43 327+850 Bituminous Road 3.75 Right
44 328+300 C. C Road 3.75 Left
45 328+600 Earthen Road 3.75 Right
46 329+400 Earthen Road 3.75 Right
47 329+450 Earthen Road 3.75
Left48 329+950 Bituminous Road 3.75 Left
49 330+200 Earthen Road 3.75 Left
50 332+900 Bituminous Road 3.75 Right
51 332+975 Bituminous Road 3.75 Left
52 333+100 Bituminous Road 3.75 Left
53 334+200 Earthen Road 3.75 Right
54 335+250 Bituminous Road 3.75 Left
55 335+650 Bituminous Road 3.75 Right
56 336+200 C. C Road 3.75 Left
57 336+260 Bituminous Road 3.75 Right
58 336+850 C. C Road 3.75 Right
59 337+200 C. C Road 3.75 Right
60 337+450. Earthen Road 3.75 Left
8/6/2019 Revised Sch B 2
11/17
Schedule-B - 10Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B VIII
Details of Proposed Grade Separated Interchanges
Sl.No.
Location
Existing
Chaina
ge
Desig
n
Chaina
ge
Name
of
Intersec
ting
Road
s
Propos
ed
Structu
ral
configuration
Propos
ed
Structure
type
Propos
ed
Span
arrangement
Totalwidth
Ofth
e
structu
re
ClearHe
ight
1At
Gokulpura
340.197 341.211
Connectivity to SikarTown &Sikar
Bikaneersection ofNH11 withnecessary
ramps
New 1x2-Lane(9.0mC/W)
R.C.CGirder& R.CPier &Abutm
entwithPile
2 x21.0m
As perManual
5.5m(Min)
Appendix B IXDetails of Proposed Vehicular Underpasses
Sl.No.
Existing
Chaina
ge
Desig
n
Chaina
ge
Name
of
Intersec
ting
Road
s
Propos
ed
Structu
ral
Configur
ation
Propos
ed
Structu
ral
Type
Propos
ed
Span
Arrangement
Totalwidth
Ofth
e
Structure
ClearHe
ight
1 Bypass 319.186
Gouty VillageRoad &
BolsingpuraVillage Road
New 4-Lane
R.C.C Slabwith R.CAbutment
1 x 10.5 2x12m5.0m(Min)
2 327.725 328.961Sishu Village
Road &Ranoli Market
New 4-Lane
R.C.C Slabwith R.CAbutment
1 x 10.5 2x12m5.0m(Min)
3 333.065 334.011
Khandala
Village Road,Surjabas
Village Road& Ginmata
Mandir
New 4-Lane
R.C.C Slabwith R.CAbutment
1 x 10.5 2x12m5.0m(Min)
8/6/2019 Revised Sch B 2
12/17
Schedule-B - 11Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B X
Details of Proposed Pedestrian / Cattle Underpasses
Sl.No.
Existing
Chain
age
Design
Chain
age
Nam
eof
Interse
cting
Roa
ds
Proposed
Struc
tural
Config
urati
on
Proposed
Struc
tural
Type
Proposed
Span
Arrangeme
nt
Totalwidth
Ofthe
Struc
ture
Cle
ar
Height
1 Bypass 321.425Ladhana
Village RoadNew 4-Lane
R.C.CBox
1 x 4.00 2x12m 4.5m
2 322.962 324.011
KrishnaPuraVillage Road &
Aekha PuraVillage Road
New 4-Lane
R.C.CBox
1 x 4.00 2x12m 4.5m
3 333.268 334.286Goriya Village
RoadNew 4-Lane
R.C.CBox
1 x 4.00 2x12m 3.0m
4 339.515 340.511
SobhasariaEngineeringCollege &
Shree ShyamGreen Cottage
Boys Hostel
New 4-Lane
R.C.CBox
1 x 4.00 2x12m 4.5m
Appendix B XI
A. Construction of New Major Bridges
Sl.No.
Nameof
Bridge
BridgeNo.
Existing
Chainage
Design
Chainage
Typeof
Crossing
Proposed
Structural
Configuration
Proposed
Structure
Type
Proposed
Span
Arrangement
Totalwidth
Ofthe
structure
1 Bridgeon RiverSowaboti
332/1
330.404 331.429 Rightanglecrossing
New 1 x2-Lane
R.C
Abutment,R.C Pier &R.C Girder
5 x 21.00 As perManual
8/6/2019 Revised Sch B 2
13/17
Schedule-B - 12Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
B. Rehabilitation / Repair / Widening of Existing Major Bridges
Sl.No.
NameofBridge
BridgeNo.
Chainage(Km)
Width(P
roposed/
Existing)
Span
Arran
gement
Type of Structure
FoundationSub
structureSuper
Structure
1
Bridge onRiver
Sowaboti(Existing)
331/1 330.404
8.3/8.325x4.200m
TTL =105.00m
No defectobserved in
visible portionof foundation
Stonemasonrywall typepier & no
defect
R.C.C SolidSlab
superstructureover tar paper
bearing. RepairR.C.C Railing &Expansion joint
Bridge onRiver
Sowaboti(Proposed)
As per
Manual
5x21.00m
TTL =105.00m
R.C.C Pile
Foundation
R.C.C walltype
Abutment& Pier
R.C.C T Beam
* The proposed span arrangement is tentative and the same shall be finalized in consultationwith Irrigation Authority & IC. Any change in span arrangement shall not be treated as changein scope of work.
** Note: Existing Major Bridge at Km 330.404 having 2-Lane carriageway configuration.Another New 2-Lane configuration Bridge adjacent to the Existing Bridge has been proposed.
Appendix B XII
A. Construction of new Minor Bridges
Sl.No.
Nameof
Bridge
BridgeNo.
Existing
Chainage
Design
Chainage
Typeof
Crossing
Proposed
Structural
Configuration
Proposed
Structure
Type
Proposed
Span
Arrangement
Totalwidth
Ofthe
Structure
1
Bridge onWater
LoggedArea
310/1 309.627 309.680
Right
anglecrossing
New 1 x2-Lane
R.C.CSolid Slab& Open
Foundation3 x 7.00
As perManual
2
Bridge onWater
LoggedArea
338/1 335.709 336.721Rightangle
crossing
New 1 x2
R.C.CSolid Slab& Open
Foundation
3 x 7.00As perManual
3
Bridge onWater
LoggedArea
340/1 338.224 339.226
Rightangle
crossing
New 1 x2
R.C.CSolid Slab& Open
Foundation
3 x 7.00As perManual
8/6/2019 Revised Sch B 2
14/17
Schedule-B - 13Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
B. Rehabilitation / Repair / Widening of Existing Minor Bridges
Sl.No.
NameofBridge
BridgeNo.
Chainage(Km)
Width(P
roposed/
Existing)
Span
Arran
gement
Type of Structure
FoundationSub
structureSuper
Structure
1
(Existing)
310/1 309.627
8.3/8.33x6.90m
TTL =20.700m
No defectobserved in
visible portionof foundation
Stonemasonrywall typepier & no
defect
R.C.C SolidSlab
superstructureover tar paper
bearing. RepairR.C.C Railing &Expansion joint
(Proposed)
As per
Manual
3x7.00m
TTL =21.00m
R.C.C Open
Foundation
R.C.C walltype
Abutment& Pier
R.C.C Solid
Slab
2
(Existing)
336/1 335.709
8.3/8.33x6.90m
TTL =20.700m
No defectobserved in
visible portionof foundation
Stonemasonrywall typepier & no
defect
R.C.C SolidSlab
superstructureover tar paper
bearing. RepairR.C.C Railing &Expansion joint
(Proposed)As perManual
3x7.00mTTL =
21.00m
R.C.C OpenFoundation
R.C.C walltype
Abutment& Pier
R.C.C SolidSlab
3
(Existing)
339/1 338.224
8.4/8.43x6.90m
TTL =20.700m
No defectobserved in
visible portionof foundation
Stonemasonrywall typepier & no
defect
R.C.C SolidSlab
superstructureover tar paper
bearing. RepairR.C.C Railing &Expansion joint
(Proposed)As perManual
3x7.00mTTL =
21.00m
R.C.C OpenFoundation
R.C.C walltype
Abutment& Pier
R.C.C SolidSlab
** Note: Existing Minor Bridges at Km 309.627, Km 335.709 & Km 338.224 having 2-Lanecarriageway configuration. Another New 2-Lane configuration Bridges adjacent to the ExistingBridges has been proposed.
8/6/2019 Revised Sch B 2
15/17
Schedule-B - 14Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B XIIIImprovement proposal for culverts
A. Reconstruction / Widening Scheme for Culverts
Sl.No.
Existing
CDNo.
Existing
Chainage
Design
Chainage
Type of
Structure
Recommenda
tion
Span
Arrangement
Proposed
Total
Width(m)
Existing
Proposed
Existing
(m)
Proposed
(m)
1 300/1 299.046 299.046 Pipe Pipe Reconstruction 2x900 2x1200 4-Lane
2 325/1 324.634 325.681 Slab Slab Widening 1 x 2.0 1 x 2.0 4-Lane3 325/2 324.862 325.908 Slab Slab Widening 1 x 1.729 1 x 2.0 4-Lane4 326/1 325.986 327.030 Slab Slab Widening 1 x 1.85 1 x 2.0 4-Lane5 327/1 326.189 327.230 Slab Slab Widening 1 x 2.0 1 x 2.0 4-Lane
6 331/1 330.875 331.901 Slab Slab Widening 1 x 2.43 1 x 2.5 4-Lane7 332/1 331.158 332.181 Slab Slab Widening 1 x 2.418 1 x 2.5 4-Lane
8 334/1 333.740 334.759 Slab Slab Widening 1 x 3.840 1 x 4.0 28.50
9 335/1 334.546 335.557 Slab Slab Widening 1 x 3.917 1 x 4.0 4-Lane
10 335/2 334.854 335.864 Slab Slab Widening 1 x 3.968 1 x 4.0 4-Lane
11 338/1 337.277 338.284 Slab Slab Reconstruction 1 x 5.517 1 x 6.0 42.00
B. Proposed New Culverts
Sl. No. Existing
Chainage
Design
Chainage
Proposed
Structure
Proposed
Sizearrangement
Proposed
Total width(m)
1 300.540 300.600 Slab 1 x 2.0 4-Lane2 302.558 302.625 Slab 1 x 2.0 4-Lane3 303.190 303.295 Slab 1 x 2.0 4-Lane4 304.040 304.100 Slab 1 x 2.0 42.005 304.807 304.870 Slab 1 x 2.0 4-Lane6 305.093 305.150 Slab 1 x 2.0 4-Lane7 305.465 305.545 Slab 1 x 2.0 4-Lane8 306.045 306.100 Slab 1 x 2.0 4-Lane9 306.465 306.510 Slab 1 x 2.0 4-Lane10 306.890 306.950 Slab 1 x 2.0 4-Lane
11 307.720 307.775 Slab 1 x 2.0 4-Lane12 308.444 308.525 Slab 1 x 2.0 42.0013 311.200 311.200 Slab 1 x 2.0 4-Lane14 311.813 311.847 Slab 1 x 2.0 4-Lane15 312.300 312.325 Slab 1 x 2.0 4-Lane17 313.330 313.350 Slab 1 x 2.0 4-Lane18 By-Pass 315.608 Slab 1 x 2.0 4-Lane19 By-Pass 315.822 Slab 1 x 2.0 4-Lane20 By-Pass 316.186 Slab 1 x 2.0 4-Lane
8/6/2019 Revised Sch B 2
16/17
Schedule-B - 15Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
21 By-Pass 316.674 Slab 1 x 2.0 4-Lane22 By-Pass 316.931 Slab 1 x 2.0 42.0023 By-Pass 317.211 Slab 1 x 2.0 42.0024 By-Pass 317.637 Slab 1 x 2.0 42.0025 By-Pass 318.736 Slab 1 x 2.0 42.0026 By-Pass 319.461 Slab 1 x 2.0 42.00
27 By-Pass 320.236 Slab 1 x 2.0 42.0028 330.045 331.072 Slab 1 x 2.0 4-Lane29 332.116 333.136 Slab 1 x 2.0 4-Lane30 337.845 338.848 Slab 1 x 2.0 4-Lane31 340.336 341.250 Slab 1 x 2.0 4-Lane32 340.872 341.786 Slab 1 x 2.0 28.50
Details of Culvert for Interchange
CulvertA
-
341.786 (ForMain Road),342.183 (for
Ramp A)
Slab 1 x 2.0 28.50
CulvertB - 342.725 (forRamp B) Slab 1 x 2.0 9.50
CulvertC
-341.825 (forLeft & Rightside Road
Slab 1 x 2.0 4-Lane
CulvertD
-
343.000 (forRamp B),
342.100 (forLeft & Rightside Road
Slab 1 x 2.0 28.50
Appendix B XIV
Details of Proposed ROB / RUB
S.No.
Lo
cation
ROB/RUB
Existing
Chainage/Design
Chainage
Nameof
Crossing
Existing
Structure
Proposed
Structural
Configuration
Proposed
Structuretype
Proposed
span
ar
rangement
To
talwidthof
Th
estructure
NO ROBS / RUBS IN THE PROJECT STRETCH
8/6/2019 Revised Sch B 2
17/17
Schedule-B - 16Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project
Appendix B XV
Entry / Exit Ramps and locations
NO ENTRY & EXIT RAMPS IN THE PROJECT STRETCH
Appendix B XVI
Tentative Location of Slope Protection
Sl. No. LocationDesign Chainage Length
(m)From To
1Near Palsana Village at Palsana By-
Passes 319.900 320.000 100
2Near Palsana Village at Palsana By-
Passes320.300 320.500 200
3 Near Sisio Village 324.200 324.500 300
4 Near Trilokpura Village 331.500 332.100 600
5 Near Malkeda Village 340.900 341.100 100