Relay ControlProgramming Basics
Offsets and Differentials, 2 Setpoints
HeatSetpointOffset
DifferentialOutput turns OFF
Output turns ON
Offset
Differential Output turns OFF
Output turns ON
CoolSetpoint
"COOLING" or"HIGH ALARM"
"HEATING" or"LOW ALARM"
Offsets and Differentials, 1 Setpoint
Offset
DifferentialOutput turns OFF
Output turns ON
Setpoint
Offset
Differential Output turns OFF
Output turns ON"COOLING" or"HIGH ALARM"
Deadband
"HEATING" or"LOW ALARM"
Deadband
Proportional ControlProgramming Basics
Direct Acting - Output 12mA @ Setpoint
Reverse Acting - Output 12mA @ Setpoint
Direct Acting - Output 4 or 20mA @ Setpoint
Cooling Heating
Reverse Acting - Output 4 or 20mA @ Setpoint
Cooling Heating
Controller Programming
2100 Series Controller Programming
• Menu-by-Menu Examples– Follow Along Onscreen– Some Slides Printed in Handout– Product Manuals in Reference Section
• Sub-Systems in Ubiquity Manual Sect. 12
• www.tcsbasys.com
• www.ubiquitysystems.net
Programming Basics
• Factory Defaults Preprogrammed• MUST Change Address – Default is 000
2100 Default is 10X (SL2108 => 108)
• NO LCD on Device – Must Use:– Revelation Professional 2.4– Ubiquity on Standalone QD2040– Ubiquity on Internet
– Ubiquity Mobile ****available for downloadavailable for download****
Programming Options
PC Based Software -- Revelation Professional
• Menu Driven Programming• Use for Network Setup & Testing, Commissioning,
& Load Balancing• “Read” Before Making Changes• “Write” Before Going to NEXT Menu• “Write” vs. “Write Half / Write Page”• “Load All” & “Save All” Options
*** NOT SUPPORTED AS OF JAN 2009 ***
PC Based Software -- Insight
Similar to Revelation Professional…
• Tab Driven Interface
• Uses Same Datasheets as Ubiquity
• Use for Network Setup & Testing, Commissioning, & Load Balancing
• Shows Current Values (no “read” required)
• “Write Page” Before Going to New Tab
*** NEW SOLUTION AS OF JAN 2009 ***
Internet Style Software – Ubiquity
• Similar to Revelation Professional
• Single Page for all Programming Info
• Shows Current Values (no “read”)
• Writes all Values on “Submit”
• “Read Controller” Option if Needed
• Same for Internet Based Site and Standalone QD2040
QD2040 Multi-Function Site Comm. Center
• Stand-Alone/Dial-In, Dial-Out, or Ethernet
• Configuring the Controller Network
• Controller Addressing
• Setup Web Page
• Veris Meter (ModBus) Support
• XML Support
• Several Models Available– REG & –MAX
Where to Get Help or Answers
• Instructions Sent with Product
• TCS Basys Controls Catalog
• Ubiquity Manual
• Training & Reference Manual
• www.tcsbasys.com
• www.ubiquitysystems.net
• Call TCS Directly – 800-288-9383
2100 Series Controllers
SL2105 - Five Channel Lighting Module
• Independent, 365-Day Scheduling for ALL 5 Channels
• Digital & Analog Light Sensor Inputs• Analog Current or kW Input• 5 Relay Outputs• 2 “Demand Limit” Outputs• Astronomical Clock
SL2108 - Eight Channel Lighting Module
• Independent, 365-Day Scheduling for ALL 8 Channels
• Digital & Analog Light Sensor Inputs• Analog Current or kW Input• 8 Relay Outputs• 2 “Demand Limit” Outputs• Astronomical Clock
SL2105 & SL2108 Applications
• Indoor or Security Lighting
• Outdoor or Landscape Lights
• Parking Lot Lights and Signs
• Daylight Harvesting
• Lighting Load Shedding
• Power Monitoring
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
Screenshots or Live View…
Skip to Next Controller
…
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SL2108 – eight channel lighting controller
SZ2141 - Refrigeration Controller
• Control 1 Cooler with Defrost & 2 Freezers with Defrost and Fan
• 6 RTD Inputs (-40 to 160°F)
• 5 Analog Inputs (4 to 20mA)
• 6 Digital Inputs
• 8 Relay Control Outputs
• 1 Relay Alarm Output
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
Screenshots or Live View…
Skip to Next Controller
…
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2141 - Refrigeration Controller
SZ2144 – Large Refrigeration Monitor
• 3 RTD (-40 to 160°F) or Thermistor (-20 to 120°F) Inputs
• 3 RTD Inputs (20 to 220°F)
• 2 Analog Inputs (4 to 20mA) • 3 Analog Inputs (0 to 5V)
• 8 Digital Inputs• 1 Relay Output (local alarm)
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
Screenshots or Live View…
Skip to Next Controller
…
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2144 – Large Refrigeration Monitor
SZ2165 - Boiler Controller
• Control 4 Boilers with Chiller Support
• Automatic Rotation of Boilers & Pumps
• 365-Day Scheduling
• 6 RTD & 5 Digital Inputs
• 1 Analog Input (4 to 20mA) • 2 Analog Outputs (4 to 20mA)
• 9 Relay Outputs
SZ2165 Application
One or Two Boilers with Reset
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
Screenshots or Live View…
Skip to Next Controller
…
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2165 - Boiler Controller
SZ2166 - Chiller Controller
• Stage 4 Chillers with Boiler Support
• Automatic Rotation of Chillers & Pumps
• 365-Day Scheduling
• 6 RTD Inputs
• 5 Digital Inputs • 2 Analog Outputs (4 to 20mA)
• 9 Relay Outputs
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
Screenshots or Live View…
Skip to Next Controller
…
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2166 - Chiller Controller
SZ2161 - Heat Pump Water Loop Controller
• Control 4 Boilers & a Water Tower
• Automatic Rotation of Boilers & Pumps
• 365-Day Scheduling
• 6 RTD Inputs
• 5 Digital Inputs
• 12 Relay Outputs• 2 Analog Outputs (4 to 20mA)
SZ2161 Application
Cooling Tower
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
Screenshots or Live View…
Skip to Next Controller
…
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
SZ2161 - Heat Pump Water Loop Controller
HVAC Sub-Systems – Loop Control Setup Guide
1. Click “Create Loop System” button 2. Select sub-system definition (Loop Controls)3. Enter a descriptive name for sub-system4. Select master & secondary master
controllers from drop-downs (only appropriate, available controllers will be shown)
5. Select fallback flow switch & related control point from drop-downs
6. Select the desired master controller schedule from drop-down
7. Click the “Submit” button
HVAC Sub-Systems – Loop Control
HVAC Sub-Systems – Loop Control
HVAC Sub-Systems – Loop Control
SZ2181 - Air Handling Unit Controller
• Enthalpy Based Economizer Option
• 365-Day Scheduling
• 6 RTD & 5 Digital Inputs• 4 Analog Inputs (4 to 20mA)
• 3 Analog Outputs (4 to 20mA)
• 2 Heat & 2 Cool Stages
• 2 Selectable Heat and/or Cool Stages
SZ2182 – Advanced AHU Controller
• Enthalpy Based Economizer Option
• 365-Day Scheduling
• 6 RTD & 5 Digital Inputs• 4 Analog Inputs (4 to 20mA)
• 4 Analog Outputs (4 to 20mA)
• 2 Heat & 2 Cool Stages
• 2 Selectable Heat and/or Cool Stages
SZ2182 Applications
• Dehumidification
• Face & Bypass Damper Control
• Static Pressure Control
• Heat Pump with Economizer Control
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
Screenshots or Live View…
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
SZ2181 - Air Handling Unit Controller
HVAC Sub-Systems – VAV System Setup Guide
1. Click “Create VAV System” button 2. Click “Add Sub-system” button3. Click “Controllers” to expand table of
options4. Click “Controller Selection” to expand table5. Select controllers to include in sub-system
(only allowable controllers are selectable in this list)
6. Click “Controller Detail” to expand table7. Select units for Discharge Air Temp. Sharing8. Click “System Parameters” to expand table9. Enter a descriptive name for sub-system
HVAC Sub-Systems – VAV System Setup Guide
10.Select master/main controller from drop-down (only appropriate, available controllers will be shown)
11. Set other “System Parameter” options:1. Occupied Mode Operation2. Unoccupied Mode Operation3. VAV System Type (pressure independent for this example)
4. Duct Static Pressure Controller5. Backup Discharge Air Sensor6. Warm Up Mode Operation7. Morning Warm Up Termination Time/Temp & Options8. Secondary Boiler & Chiller Master Controllers
12.Click “Submit” button
HVAC Sub-Systems – VAV System
HVAC Sub-Systems – VAV System
HVAC Sub-Systems – CZS System Setup Guide
1. Click “Create Superzone System” button 2. Click “Add Sub-system” button3. Click “Controllers” to expand table of
options4. Click “Controller Selection” to expand table5. Select controllers to include in sub-system
(only allowable controllers are selectable in this list)
6. Click “Controller Detail” to expand table7. Select units for Discharge Air Temp Sharing
& for Voting functions8. Click “System Parameters” to expand table
HVAC Sub-Systems – CZS System Setup Guide
9. Enter a descriptive name for sub-system10.Select master/main controller from drop-
down (only appropriate, available controllers will be shown)
11. Set other “System Parameter” options:1. Occupied Mode Operation2. Cool Priority Mode Operation3. Heat Priority Mode Operation4. Voting Mode Operation5. Unoccupied Mode Operation6. Backup Discharge Air Sensor7. Bypass Damper Controller8. Minimum Demand
HVAC Sub-Systems – CZS System Setup Guide
11. Set other “System Parameter” options: (cont’d)
9. Tie Break Controller10.Priority Zone Controller11.Majority Maximum Run Time12.Minority Maximum Run Time13.Enable Hot Deck/Cold Deck14.Secondary Boiler and Chiller Master Controllers15.Hot Deck/Cold Deck Unoccupied Options
12.Click “Demand Proportioning” to expand table & set desired options
13.Click “Submit” button
HVAC Sub-Systems – Superzone™ System
HVAC Sub-Systems – Superzone™ System
HVAC Sub-Systems – Superzone™ System
Where to Get Help or Answers
• Instructions Sent with Product
• TCS Basys Controls Catalog
• Ubiquity Manual
• Training & Reference Manual
• www.tcsbasys.com
• www.ubiquitysystems.net
• Call TCS Directly – 800-288-9383
S l s n S rS ta e a d a e ing
Top Related