ACKNOWLEDGEMENT
I take this opportunity to express my profound gratitude and deep regards to my guide Professor Dr.
C. R. Venugopal for his exemplary guidance, monitoring and constant encouragement throughout the
course of this project. The blessing, help and guidance given by him time to time shall carry me a
long way in the journey of life on which I am about to embark.
I am also thankful to him for his great patience, constructive criticism & useful suggestion apart from
invaluable guidance.
A formal statement of acknowledgement will hardly do justice. It is a matter of expressing our deep
gratitude and obligations to all those who helped us in completion of our project.
Department of Electronics and Communication Enginnering,SJCE Mysore-570006 Page i
Railway Reservation System
ABSTRACT
As I am beginner and have no practical experience in the field of software development and
moreover the RAILWAY system is very wide. So, we limit the scope of our project by
computerizing the following fields of the RAILWAY system:
The Project is about Railway Reservation system. It has two users, Administrator and User of the
PRS (Passenger Reservation System) . Administrator have functions like
1. Add New User
2. Display all user Details
3. Add new train
4. Display all trains
5. Scheduled trains
6. Display Schedule
7. Logout
User have functions like
1. Show profile
2. Edit profile details
3. Display schedule based on train
4 .Display schedule based on source and destination
5. Display schedule based on date
6. Display all trains schedule
7. Check berth availability
8. Book tickets
9. Cancel ticket
10. Exit
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page ii
Railway Reservation System
Table of Contents
ACKNOWLEDGEMENT………………………………………………. i
ABSTRACT..................................................................................................... ii
Chapter 1 Introduction
1.1. General Introduction......................................................................................................... 1
1.2. Product Definition…………………………………………………………………… 1
1.3. Problem Definition………………………………………………………………… 1
1.4. Functionality to be provided………………………………………………………. 2
1.5. Processing environment – Hardware and Software…………………………… 2
1.6. Solution Strategy…………………………………………………………….. 2
1.6.1. Classic Life Cycle Model……………………………………………… 2
1.7. Overview of java ……………………………………………………. 3
Chapter 2 Design
2.1. Algorithm………………………………………………………………… 5
2.2. Flowchart................................................................ 6
Chapter 3 Testing
3.1. Tested Result.................................................................................. 7
Chapter 4 Feasibility Analysis
4.1. Economical Feasibility …………………………………………….. 9
4.2. Technical Feaasibility……………………………………………… 9
4.3. Operational Feasibility……………………………………………….. 10
Chapter 5
Advantages of Railway Reservation System…………………… 11
Chapter 6
Future Scope of the Project……………………………………. 12
Department of Electronics and Communication Enginnering,SJCE Mysore-570006 Page iii
Railway Reservation System
Chapter 7
Conclusions ……………………………………………………………… 13
References…………………………………………………………………… 13
List of Figures
Figure 1
The pictorial representation of SDLC…………………….. 2
Figure 2
Phases of System Development Life Cycle……………………. 3
Figure 3
Two ways of using Java…………………………………………….. 4
Figure 4
Railway Reservation System flow chart……………………………. 6
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page iv
Railway Reservation System
CHAPTER 1
Introduction
1.1 General Introduction
This project introduces railway reservation system . It explains how reservation is being done in
Indian Railways. The step by step procedure is explained . This project is developed in JAVA
language . Almost all the packages have been used in this project. Proper comments have been given
at desired locations to make the project user friendly. Various exceptions and classes are used to
make a complete use of this language. This project is well versed with the programming . Railway
reservation can easily be accompanied with the help of this.
1.2 Product Definition
We have come to final conclusion after analyzing the existing system of the “Solitaire Software”. We
came to know that it is very difficult for the person to maintain records manually, same in the case
with the person that done the reservation, so in order to provide the person with such a system that
helps him easy in maintaining the records of the passenger, we are going with this project.
1.3 Problem Definition
Data redundancy and inconsistency.
Difference in accessing data.
Data isolation.
Security problem
Communication gap
Updating problem
User friendly
Help user in viewing his data and privileges.
Help the administrator to handle all the changes.
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 1
Railway Reservation System
1.4 Functionality to be provided
Maintenance of train information.
Maintenance of passenger information.
Maintenance of fares of sold tickets.
Maintenance of the reports.
1.5 Processing Environment – Hardware and Software
Operating system is a platform on which the specified application will be used. Once it has
been complete, the software we are about to make, will execute on both client machine and
server machine.
Configuration
O/S –Windows XP, Windows 7 Service pack-2, etc
RAM – Min. 128 MB
Eclipse IDE (Integrated Development Environment)
1.6 Solution Strategy
1.6.1 Classic Life Cycle Model
This is a sequential approach to software development.It begins with analysis and progresses through
design, coding, testing & maintenance.The pictorial representation of SDLC is shown below.
Figure 1
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 2
Railway Reservation System
Figure 2
Phases of System Development Life cycle is shown above.
1.7 Overview of Java
Java is a general-purpose, object-oriented language
We can develop two types of JAVA programs
Stand-alone applications
Web applets
Stand-alone applications are programs written in Java to carry out certain tasks on a local
computer
Executing a stand-alone Java program involves two steps
Compiling source code into bytecode using javac compiler
Executing a bytecode program using java interpreter
Applets are small Java programs developed for internet applications
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 3
Railway Reservation System
An applet located on a remote computer can bedownloaded via internet and executed on a
local computer using java-enabled browser.
Applets are embedded in a HTML document and run inside a Web page, creating and running
applets are more complex than creating an application.
Stand-alone programs can read and write files and perform certain operations that applets
cannot do. An applet can only run within a browser.
Figure 3
CHAPTER 2
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 4
Railway Reservation System
Design
This process translates the requirement into a representation that can be accessed before putting into
actual code, design include the following activities:
1. Algorithm
2. Logical Design Flow Charts
3. Physical Design
4. Database Design
2.1 Algorithm
Under Admin class, 7 different functionalities has been achieved
1. Add new User
a) Read the file called “user.txt” using BufferedReader and write the same file using
FileWriter
b) Enter user id, user name, password, age, gender, address and print it
2. Display user details
a) Read the file “user.txt” using BufferedReader
b) Fill the user.txt with the above mentioned user details such as user id, user name etc
separated by $ symbol and print it
3. Add new train
a) Read the file called “train.txt” using BufferedReader and write the same file using
FileWriter
b) Enter train no, train departure time in hours and minutes, arrival time in hours and
minutes, SL seats, AC seats, SL fare, AC fare and print it
4. Display all trains
a) Read the file called “train.txt” using BufferedReader
b) Fill the train.txt with the above mentioned train features such as train no, SL seats etc
separated by $ symbol and print it
5. Scheduled trains
a) Write the file called “schedule.txt” into the “train.txt” file by using FileWriter, where
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 5
Railway Reservation System
“train.txt” is read using BufferedReader
b) Enter the date, month, year, SL seats available, AC seats available separated by $
symbol and print that all trains are scheduled as per the date
6. Display schedule
a) Read the file called “schedule.txt” using BufferedReader and display the schedule by
entering trip no, train id, schedule date, SL seats, AC seats which will be read
2.2 Flowchart
Flowchart is drawn for “user” class to demonstrate how user make use of “admin” class details to
book the ticket and cancel the ticket.
railway reservation system flow chart
Figure 4
CHAPTER 3
Testing
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 6
Railway Reservation System
Testing is the major control measure used during software development. Its basic function is to
detect errors in the software. During requirement analysis and design, the output is a document that is
usually textual and no executable. After the coding phase, computer programs are available that can
be executed for testing purpose. This implies that testing not only, has to uncover errors introduced
during coding, but also errors introduced during previous phase. Thus the goal of testing is to
uncover the requirements, design and coding errors in the programs. So after testing, the outputs of
my project are as follows:
3.1 Tested Result
1.Administrator2.User2
1.Show profile2.Edit profile details3.Display schedule based on train4.Display schedule based on source and destination5.Display schedule based on date6.Display all trains schedule7.Check berth availability 8.Book tickets9.Cancel ticket10.exit8Enter user id2Enter user nameningappaEnter passwordp130109Enter trip number8Enter no of tickets2Enter type of classacEnter passanger1detailsName:ninguAge:24gender:MEnter passanger2detailsName:anantAge:23gender:M
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 7
Railway Reservation System
|----------------------------------------------------------------------------|| Railway Reservation System || Version 1.o developed by ANANT ||----------------------------------------------------------------------------||Ticket NO/PNR No:1386-8-2-2-ac-R ||----------------------------------------------------------------------------||Booked by Date and Time:31-12-2013|Booked by userId:2 ||----------------------------------------------------------------------------||Train No:1386|Train Name:krishna Express|Trip No:8 ||----------------------------------------------------------------------------||Source Station:adilabad|Destination Station:tirupathi ||----------------------------------------------------------------------------||Travel Date and Time:31/12/2013,6:5 ||----------------------------------------------------------------------------||Passanger Details ||----------------------------------------------------------------------------||S.NO |Name |Age |Gender |Class |Seat No|R/wr|Fare ||----------------------------------------------------------------------------||1 |ningu |24 |M |ac |1|R |1000| ||2 |anant |23 |M |ac |1|R |1000| ||----------------------------------------------------------------------------|| Total charges|2000 ||----------------------------------------------------------------------------|
Maintenance is done after the software has been installed at the user sight. As error bound to occur,
so changes has to be done to meet the user needs.
CHAPTER 4
Feasibility Analysis
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 8
Railway Reservation System
Depending on the results of the initial investigation, the survey is expanded to a more detailed
feasibility study. A feasibility study is a test of a system proposal. According to its workability,
impact on the organization, ability to meet user’s needs and effective use of the resources. Main task
done during the feasibility study are:-
1. Evaluation of existing system and procedures. I went through various codes written in
C and C++ to gather information about the software system. They are using and
evaluating those system and the procedures invoked in it during the period of
feasibility study.
2. Analysis of alternative systems:- after studying the various systems I derived various
alternatives through which I develop my project and evaluated the alternative. The
most appropriate is selected.
4.1 Economic Feasibility
The only tangible benefit provided by the proposed system is that the paper work is Reduced to the
minimum and hence the reduction in code incurred on Feasibility and its usage in reservation. The
system provide many benefits that can’t be measured in terms of Money for e.g. user’s friendliness,
more over, user response being more efficient.
4.2 Technical Feasibility
The proposed system is technically feasible as it can be developed easily with the help of available
technology. The proposed system requires MS office 97 or 2000 with Eclipse IDE & Eclipse has a
back-end tool storing a database. The database can be easily interconnected using Eclipse IDE.
4.3 Operational Feasibility
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 9
Railway Reservation System
Automation make our life easy. The proposed system is highly user friendly and is much easily able
to interact with the system. Therefore the users will readily accept the system as data entry and
making queries can be easily done.
CHAPTER 5
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 10
Railway Reservation System
Advantages of Railway Reservation System
Now one can easily plan the journey comfortably as the process is efficient and fast with being easy
to access. Reservations can be made through the Indian railways site or at the ample reservation
centers all over the country. Also now there are authorized agencies which provide reservation
facility on behalf of India railways and without waiting in long line one can easily book a ticket. The
booking is done through an Eticket issue which have a PNR number of which one has to take a print
and just have to show at the station.
It not only provide reservation but cancellation can also be done through this system at ease and one
can use a credit card to complete the process.
This being a big step in terms of improvement in the railway system it is widely accepted across the
country.
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 11
Railway Reservation System
CHAPTER 6
Future Scope of the Project
This project will be able to implement in future after making some changes and modifications as i
made my project at a very low level. So the modifications that can be done in this project are:
Tatkal ticket booking
With the help of this project we are not able to calculate number of reserved and unreserved
seats, so we have to make a project to calculate numbers of seats
We cannot book one sleeper and one ac different tickets,which can be modified in future
SMS receiving in the mobile after the ticket is booked
Booked History
Refund of money after cancelling the ticket during general type of reservation
Internet banking and credit card facility
CHAPTER 7
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 12
Railway Reservation System
Conclusions
Train record is achieved i.e. the schedule of various trains and no of trains
Passengers details can be stored which ease user to make reservation
Secured code is achieved by giving unique password and user name to administrator
User details can be modified by the user and user can change the password
Display schedule based on source and destination as well based on date and train
We can book unlimited number of tickets through this code
References
Head First Java by Kathy Sierra & Bert Bates. Your Brain on Java- A Learner’s Guide 2nd
Edition – Covers Java 5.0
www.wikipedia.com
www.scribd.com
Department of Electronics and Communication Enginnering, SJCE Mysore-570006 Page 13
Top Related