PT. DAHLIA BIRU
BUSINESS ADDRESS : JL PANGLIMA SUDIRMAN 55, SURABAYA 60271, EAST JAVA, INDONESIA
TELEPHONE : +62 31 5481 666, +62 31 7001 7652
FAX : +62 31 5481 555
EMAIL : [email protected]
COAL MINING
PT DAHLIA BIRU, established in 1990 owns a coal mining
lease located within the administrative jurisdiction of
South Barito Regency in Central Kalimantan Province.
PT. DAHLIA BIRU currently holds an exploitation permit as
well as a coal hauling and selling permit.
Vision Statement
To be a world class coal mining company .
Mission Statement
To provide most economical fuel for power generation namely steam coal
for the domestic and international market by deploying most efficient
and best mining practices by utilizing latest technologies available in the
industry.
Values
The JORC resources of PT. Dahlia Biru approximately 108 million tonnes
of coal.
The optimized reserves of the Dahlia Biru’s coal project at
approximately 85.6 million tonnes with the average stripping ratio of
3.07.
Growth Strategy
PT. DAHLIA BIRU continually seek new resources for sustainable growth
and its affiliated company owns a coal mining lease of 5,000 Ha.
Coal quality :
1. Total Moisture : 62% (ar)
2. Inherent Moisture : 14% (adb)
3. Ash : 6% (adb)
4. Volatile Matter : 44% (adb)
5. Fixed Carbon : 36% (adb)
6. Total Sulphur : 0.2% (adb)
7. GCV : 5270 kcal/kg (adb)
JORC Code Coal Resources from surface down to elevation – 50m on explored 1,105 Ha
area :
Coal Reserves :
85,600,000 Tonnes
Units Measured Indicated Inferred Subtotal
Tonnage Million tonnes 57.3 50.7 48 108
WIRTGEN 2200 SM Surface Miner
PRODUCTIVITY:
- Per Hour : 500 tonnes
- Per Day : 20 hours X 500 MT = 10,000 tonnes
- Per Year : 340 days X 10,000 MT = 3,400,000 tonnes
Note: Per Hour = 384.6 MT X 1.3 = 500 tonnes
Surface Miners 2200 SM
The Wirtgen 2200 SM is the “all-rounder”
for soft and medium hard rock. The cut
material is either loaded to the front via a
large conveyor system consisting of primary
and discharge conveyor or is windrowed
behind the machine. With an operating
weight of almost 53 short tons, the Surface
Miner 2200 SM can achieve a cutting depth
of 11 inches over a total width of 7.2 feet
in soft to medium hard rock
Mercedes Benz (Actros 4054 S/33)
Specification :
Engine Power : 395 kW (537 HP)
Wheelbase : 3300 mm
Gross Vehicle Combination : 200 ton
PRODUCTIVITY (8 Units):
Hauling distance : 26 Km
Average speed loaded : 30 Km/hr
Average speed return : 40 Km/hr
Average speed : 35 Km/hr
Total cycle time : 1.49 hr
Loading & unloading time : 1 hr
Total cycle time : 2.49 hr
Operating hours per day : 20 hr
Cycles per day : 8.05 days
Average to : 8 trips
Productivity per days:
8 trips X (91 MT X 2 Tandems) X 8 Units = 11,648 MT
Location : Tamparak village, Dusun Utara
sub district, Barito Selatan
Regency, Central Kalimantan
Province.
Area of concession : 5,000 Ha
Hauling road (Mines to jetty) :
Distance : ± 26 Km
Width : 40 m
Stockpile and jetty area: ± 40 Ha
The coal will be trasported via Barito river
towards Taboneo Anchorage, distance
380 Km (205 nautical miles)
Keputusan Bupati Barito Selatan No. 527 Tahun 2009 tentang PersetujuanKuasa Pertambangan Eksploitasi menjadi Izin Usaha Pertambangan OperasiProduksi kepada PT. Dahlia Biru (Production Operation Permit) for 19years.
Keputusan Bupati Barito Selatan No. 316 Tahun 2011 tentang PemberianPerpanjangan Izin Lokasi kepada PT. Dahlia Biru untuk Lokasi TerminalKhusus Batubara, Sarana Penunjang dan Infrastruktur Tambang besertaJalan Tambang Batubara (Location, Hauling Road and Stockpile Permit).
Izin Prinsip MenHut No. S.491/Menhut-VII/2012 Tanggal: 18 Oktober 2012Persetujuan Prinsip Penggunaan Kawasan Hutan untuk Kegiatan OperasiProduksi Batubara dan Sarana Penunjangnya Pada Kawasan Hutan ProduksiTetap dan Kawasan Hutan yang dapat dikonversi a/n PT. Dahlia Biru diKab. Barito Selatan Prop. Kalimantan Tengah.
ORGANIZATIONAL STRUCTURE
GENERAL MEETING OF SHAREHOLDERS
BOARD OF COMMISIONERS
Alim Markus (President Commissioner)Iuneke Anggraini (Commissioner)
Henry J GunawanPRESIDENT DIRECTOR
David GunawanDIRECTOR 2
Bambang Raya SaputraDIRECTOR 1
Agus S TjiptowardojoDIRECTOR 3
SHAREHOLDERS
PT. Permata Sumber Investindo
PT. Permata Murni
PT. Bintang Harapan Desa
Alim Markus
PT. DAHLIA BIRU
15 %
65 %
10 %
10 %
To date some 1,105 Ha at the south eastern portion of this lease had been the
subject of exploration activities involving outcrop mapping, borehole drilling,
quality sampling. Data collected was validated, encoded for computer-aided
design and processing, and correlated to come up with a seam geometry and
quality model. The volume and quality of the data are found to be sufficient
to allow a resources estimation compliant with the requirements of the JORC
Code and the Australian Guidelines for Reporting and estimating Inventory
Coal, Coal Resources and Coal Reserves.
PT. DAHLIA BIRU has completed land acquisition for stockpile and jetty
measuring 40 Ha and 98 Ha for hauling road.