Goal
Reduce the vulnerabilities of coastal communities and cities in Tamil Nadu and Andhra Pradesh, India, to climate change and strengthen capacities of local authorities and the population on climate change adaptation (CCA), climate change mitigation (CCM) and disaster risk reduction (DRR).
Dokumentation Ergebnisse 29./30 August 2006 / Folie 4
Folie 4
Key results and achievements in WP 1 (Year 2)
Dokumentation Ergebnisse 29./30 August 2006 / Folie 5
Folie 5
• Introduce the project • Formal consent through MoU
• Formation of a City Task Force & Stakeholder Group
• Engaging stakeholders
Developing a detailed city profile and collation of data which would support further processes
• To identify the most vulnerable areas of the city• To carry out a community needs and vulnerability assessment in these areas.• Engaging stakeholders in the process
Urban Approach – Integration of CCA & CCM
Dokumentation Ergebnisse 29./30 August 2006 / Folie 6
Folie 6
Integration into development plans accelerated
Key results include: Rs. 1.57 crores allocated by AP government for expanding AdaptCap schemes and concepts in Vizag district
District disaster management plans in Vizag and Thiruvallur under review with NIDM, to integrate CCA and DRR
16 Crores sanctioned in AP by the AP Community based tanks programme by the irrigation dept.
District officials appointed in Nellore to monitor the pilots and look at developing a climate change integrated plan at the district level
Multiple approaches for mainstreaming adaptation
Dokumentation Ergebnisse 29./30 August 2006 / Folie 7
Folie 7
New approaches to CCA, CCM and DRR
City task force formed with key officials from Town Panchayat including Chairperson & RDO, CBOs, DRR experts and NGOs
MoU signed for project implementation
V&NA replicated in 18 wards, V&NA for entire Town Panchayat being discussed
Chairperson plans to present results to Chief Minister, TN
Attempts for integration with plans of different government flagship programmes
Example of Ponneri: Integration at the city level
Mr. Kandasami, Revenue Division Officer and Ms. DhanLaxmi Mohansundaram, Chairperson, Ponneri Town Panchayat, presiding the SLD workshop
Dokumentation Ergebnisse 29./30 August 2006 / Folie 8
Folie 8
New approaches to CCA, CCM and DRR
The DC, Vizag, DC, Thiruvallur and Relief Commissioners AP and TN nominated nodal officers for supporting the development of VDMPs and DDMPs
DDMPs Thiruvallur are being reviewed for preparing a multi-hazard plan
Training planned for 6 District officers by NIDM on CCA and DRR integration
VDMPs being prepared for 6 communities in AP and TN on GoI template
Technical paper on mainstreaming CCA and DRR is submitted to UNISDR
Integration of CCA & DRR with NIDM, GoI
CCA and DRR integration Meeting convened by the District Collector, Thiruvallur
Meeting with District Collector, Vizag
Dokumentation Ergebnisse 29./30 August 2006 / Folie 9
Folie 9
New approaches to CCA, CCM and DRR
Chapter on community based adaptation approaches including LAMGs shared with nodal agency EPTRI, for the SAPCC, AP
Inputs for SAPCC-TN prepared and discussions for integration of CCA and DRR approaches undertaken with Department of Environment, Tamil Nadu
Meetings conducted with SPC, TN to look at integration at the State level
Proposal submitted to NABARD for funding under the Adaptation Fund Board
Integration in State Action Plans on Climate Change
Meeting with Dr. Radhakrishnan, Officer on Special Duty– Relief and Disaster, TN with NIDM and SPO, UNDP
Dokumentation Ergebnisse 29./30 August 2006 / Folie 10
Folie 10
Key results and achievements in WP 2 (Year 2)
Dokumentation Ergebnisse 29./30 August 2006 / Folie 11
Folie 11
Community
Selected pilot measures being implemented
Status
Nellore District (AP)Sri Ramapuram and Ramudupalli Palem
Construction of storage shed for fishing equipment at seashore (with fish drying racks)
Completed
Repair road/bridges causeway over the nearby Buckingham Canal
Completed
Poovula Doruvu SMC activities (irrigation / sprinklers) in the existing vegetable /floriculture lands around the village
Completed
Prakasam District (AP)
Dasaraju Palli Water treatment: filtration and pumping by solar; pond renovation / pipelines to pond
?
Motumala Renovation of irrigation tank, channelization of flood water to irrigation tank
?
Vengamukka Palem
Drinking water: upgradating of existing RO plant with photovoltaic panels
?
Visakhapatnam District (AP)Chepala Dibbada Palem and Chukkavani Palem
Improvement of piped water scheme Funded by AP Govt. Completed ?
Govupeta Individual toilets and sanitation scheme; efficient "Chulas" (cooking stoves)
Completed
Andhra Pradesh: Pilot projects in rural communities
Dokumentation Ergebnisse 29./30 August 2006 / Folie 12
Folie 12
Tamil Nadu: Pilot projects in rural communities
CommunitySelected pilot measures being implemented
Status
Nagapattinam District (TN)
Kumarakudi River bund strengthening (and installation of a shutter)
Completed
Perumalpettai Coastal bund construction Completed
Pillai colony Regulation of piped drinking water supply / water management
Completed
Cuddalore District (TN)
Chinnakaramedu Digging rain water storage unit with irrigation channel, fencing and plantation
Completed
Kaduvetti Road side channel bund construction Completed Nadupalayam Strengthening backwater river bund CompletedThiruvallur District (TN)Kadapakkam Pond renovation and bund and shutter construction Completed Thangal Perumpulam
Renovation of drainage channel Completed
Thirumalai Nagar Installation of solar street lights Completed
Dokumentation Ergebnisse 29./30 August 2006 / Folie 13
Folie 13
Pilot examples in AP & TN
Dokumentation Ergebnisse 29./30 August 2006 / Folie 14
Folie 14
Key results and achievements in WP 3 (Year 2)
Dokumentation Ergebnisse 29./30 August 2006 / Folie 15
Folie 15
Awareness raising and capacity building
– Training material developed
– Training calendar established
– Initial ToTs for local NGOs and first training round carried out in the villages as part of the V&NA and pilot framing in 2011
– ToT on Urban Climate Change conducted
– 5 Shared Learning Dialogues prepared and realised in cities
– 36 trainings on CCA, CCM, DRR and pilot projects conducted at community
– 2 ToTs and 8 training workshops conducted on Operations & Maintenance
Activities carried out
CCA and DRR integration Meeting convened by the District Collector,
Thiruvallur
Dokumentation Ergebnisse 29./30 August 2006 / Folie 16
Folie 16
Local adaptation and mitigation guides (LAMG) Local adaptation and mitigation guides (LAMGs) developed for all 18 rural communities in AP/TN as living documents
Rural LAMGs: Part 1 in 2011, part 2 in 2012 done for 18 villages
City LAMGs: Initial version updated in 2012
Dokumentation Ergebnisse 29./30 August 2006 / Folie 17
Folie 17
Ongoing assistance for integration into planning schemes
Dokumentation Ergebnisse 29./30 August 2006 / Folie 18
Folie 18
Key results and achievements in WP 4 (Year 2)
Dokumentation Ergebnisse 29./30 August 2006 / Folie 19
Folie 19
Pilot-Visibility: Local Adaptation Projects Websitewww.adaptcap.in/projects
Dokumentation Ergebnisse 29./30 August 2006 / Folie 20
Folie 20
International exchange and dialogue through articles and conference participation
Project Awarded with Global recognition at Solution Search
Article on adaptation financing included in online libraries
Article on climate change impact chains in the water sector submitted to journals
Appearance of AdaptCap in SEA Change and German Coastal Newsletter and several online platforms
Participation and presentations at conferences, including Second Asia-Pacific Climate Change Adaptation Forum (Thailand)
Dokumentation Ergebnisse 29./30 August 2006 / Folie 24
Folie 24
Some next steps O&M trainings for each pilot project and development of O&M plans
(integration of these plans into part 2 of the LAMG)
Data collection for the M&E framework (overall + pilots)
Replication process documentation for pilot projects
Completion of planning integration and assistance strategy (e.g., NIDM)
Completion and documentation of local capacity building workshops
Completion of SLDs in Cities
6 Assistance Strategies
Accelerate regional networking
Continue visibility activities (articles, conference participation, updates of Local Adaptation Projects website, best practice booklet)
Upscaling activities with Climate Coalition Core Group