2/16/2016
Project Management Plan Presentation “Developing the project team”
- Agatha Maia - Anusha
Nandagopalandagopal. - Eduardo Ikezaki - Mikhail Sopin - Olga Dubovyk
1
Table of Contents Introduction ............................................................................................................................................................................................. 2
Scope Statement ...................................................................................................................................................................................... 2
STAKEHOLDERS IDENTIFICATION ................................................................................................................................................ 4 WBS ........................................................................................................................................................................................................ 5
WBS dictionary ....................................................................................................................................................................................... 6
SCHEDULE+COST ............................................................................................................................................................................. 12
HR MANAGEMENT PLAN ................................................................................................................................................................ 13 Project Organization Chart ................................................................................................................................................................... 13
Process of Developing Team Work ...................................................................................................................................................... 14
RASCI Matrix ....................................................................................................................................................................................... 15
Work Performance Report .................................................................................................................................................................... 16
Staffing Management ............................................................................................................................................................................ 16
STAFF RESOURCE CALENDAR ...................................................................................................................................................... 17 COMMUNICATION MATRIX ........................................................................................................................................................... 18 QUALITY MANAGEMENT PLAN ................................................................................................................................................... 18 Quality Requirements: .......................................................................................................................................................................... 18
Quality Assurance: ................................................................................................................................................................................ 19
Quality Control: .................................................................................................................................................................................... 20
PROCESS IMPROVEMENT PLAN ................................................................................................................................................... 21 Process Boundaries ............................................................................................................................................................................... 21
Process Configuration ........................................................................................................................................................................... 21
Target for Improved Performance ........................................................................................................................................................ 22
Quality Control Measurement ............................................................................................................................................................... 22
RISK REGISTER ................................................................................................................................................................................. 23
CHANGE CONTROL .......................................................................................................................................................................... 24
2
Introduction PURPOSE: The objective of the project consists in develop and delivery a presentation about Developing the project team, this assignment is part of the 2084 – Project Leadership course and represents 40% of our final grade. As some outcomes of this presentation it is expect to improve our business English skills and communication, increase our confidence as a project manager and also improve the team work among the team members. The knowledge acquired on this course it would be useful in our professional and personal life.
Scope Statement Project ID EPM-2084 Date 10/02/16
Project Name Project Presentation “Developing the project team”
Project Objectives
Business Objective: - Delivering knowledge about team motivation - Getting an A+ grade for the assignment
Cost, Schedule and Quality Objectives - Schedule Target – 40 hours - Cost Target - $5.000 dollars’ budget - Quality Target – format documents in APA style, following the rubric for exceptional evaluation.
Product Scope Definition
Characteristics of Product: - Power point presentation - Hard and soft copy - Developing the project team content - Delivery of the presentation
Project Requirements
Requirements: - The presentation must be delivered in 30 minutes - The power point file must have 27 slides on max - The background of the slides must be lightly colored and the font must be dark color - The body of the document must demonstrate outstanding use of English - The presentation must have no more than 40% of text - The presentation must have 60% of images or diagrams - The sources and references of the information must be contained in the presentation - Each member of the team must be prepared to present their topic in 6 minutes on max - Each member must be aware of the entire content of the presentation - Format documents in APA style, following the rubric for exceptional evaluation.
3
Project Boundaries
IN SCOPE: - Research about developing the project team - Process of presentation - Hard and soft copy - Design in APA format - Content of the presentation
OUT OF SCOPE: - Word document hard and soft copy - Colored hard copy of the presentation - Handle outs
Project Deliverables - Project management Plan - Power point presentation - Delivery of the presentation
Product Acceptance Criteria - The duration of the entire presentation should be no more than 30 minutes - The presentation must meet the exceptional criteria from the rubric
Project Constraints - The presentation must be delivered in February 20, 2016 - The hard copy must be handed to the professor in February 20, 2016 - The soft copy must be sent before the presentation being delivered - The content of the presentation must be about Developing the team project - The list of the references must be listed on the presentation
Project Assumptions - Each member of the group should present your content in 6 minutes - The questions should be asked in the end of the presentation - Each subject of the topic should be presented at least with 4 slides
Initial Project Organization Key Stakeholders: - Project team - Bob Xourafas (Professor) - Audience - College administration
Project Team - Agatha Maia - Anusha Nandagopalandagopal. - Eduardo Ikezaki - Mikhail Sopin - Olga Dubovyk
4
Schedule Milestones - Project management plan – February 13, 2016 - Data research – February 17, 2016 - Design and test – February 19, 2016 - Delivery the presentation – February 20, 2016
Approval Requirements - The unit chosen must be approved by the team and the professor - The templates for the project management plan must be approved by the professor
STAKEHOLDERS IDENTIFICATION
ID Name Role Functional Area What is Important to this Stakeholder?
Supportive? [Yes/No]
Approach
01 Bob Xourafas Supporting and Evaluation
Professor
Having the hard copy during the important; All the members must participate; Ensuring the content of the presentation.
[Yes]
Face to face questions asked; Handing of f the hard copy; Email the soft copy;
02 Project Team Developing Management Plans and Presentation
Students and Presenters
Getting excellent marks; Meeting the Rubrics criteria; Self improvement; Improvement of Team Work skills;
[Yes]
Meeting at class; Brainstorming; Informal Meeting; Drop box;
03 Audience Accepting Presentation and asking questions
Students and Listeners Using of appropriated language; Clear communication of the content; Presentation slides must be legible;
[No] Lecture - delivery of the presentation and answering questions
04 College Administration
Providing environment and facilities
College
Keeping the room clean; Aligning the material to the academic standards;
[Yes] Email; Face to face; Moodle;
5
WBS
6
WBS dictionary 1.1. Planning
Work Holder Anusha Nandagopal Revision Date Process/Project Project Presentation “Developing the project team” 2016-02-13
Work Package # Name 1.1. Planning
Work Package Short Description Preparation all necessary project management documents
Work Package Deliverables Approved project management plans.
Work Package Requirements Detailed plan should include all necessary documents for the project realization
Work Package In Scope Scope Statement; Schedule; Resource estimation; Quality rubric; HR Processes; Communication matrix; Risk register; Stakeholder register
Work Package Out of Scope Change management plan; Configuration management plan; Cost management plan; Process improvement plan
Work Package Work to be done 1.Collect requirements; 2. Product scope definition; 3. Milestones definition; 4. Develop WBS 5. Develop WBS dictionary; 6. Define and sequence Activities 7. Resource estimate; 8. Cost estimates 9. Risk register 10. Define quality requirements; 11. Creating RACI; 12. Team building activities Work Package costs: basis & details
of cost estimates; total costs 1344 CAD (labor, material, costs)
Work Package Schedule Start date Finish Date Duration, hours
02.10.16 02.13.16 27,5
Work Package Leader and Team Mikhail Sopin Olga Dubovyk
Work Package Release approved by: Olga Dubovyk
Conditions & tests for WP acceptance
Approved by Olga Dubovyk
7
1.2. Presentation
Work Holder Eduardo Ikezaki Revision Date Process/Project Project Presentation “Developing the project team” 2016-02-13
Work Package # Name 1.2. Presentation
Work Package Short Description Make a research and Design for presentation and print it
Work Package Deliverables Power Point presentation soft and hard copy
Work Package Requirements -- The power point file must have 27 slides on max
- The background of the slides must be lightly colored and the font must be dark color
- The body of the document must demonstrate outstanding use of English
- The presentation must have no more than 40% of text
- The presentation must have 60% of images or diagrams
- The sources and references of the information must be contained in the presentation
- Format documents in APA style, following the rubric for exceptional evaluation.
Work Package In Scope - Research about developing the project team
- Hard and soft copy
- Delivering in APA format
- Content of the presentation
Work Package Out of Scope - Word document hard and soft copy - Colored hard copy of the presentation
Work Package Work to be done 1.Define topics 2. Collect and filter content 3. Finalize and approve content 4. Create .ppt slide 5. Arrange slides 4. Put
precis info into slides 5. Print hard copy 6. Send soft copy
Work Package costs: basis & details of cost estimates; total costs
1 758 CAD (labor, material, costs)
Work Package Schedule Start date Finish Date Duration, hours
02.13.16 02.22.16 60.5
Risk Management Risk ID Risk Name and
Description Related to
Task Overall
risk Strategy Risk response plan
2 Attendance of teammates
Design 2.00% Mitigate Team mate should be ready to accomplish the work of absent person
8
6 Lack of presentation originality
Research 6.00% Avoid -Using different resource types -Instructor's help
7 Lack of content Research 8.75% Avoid -Using different resource types -Instructor's help
Work Package Leader and Team Mikhail Sopin Olga Dubovyk Agatha Maia Anusha Nandagopal Eduardo Ikezaki
Work Package Release approved by: Mikhail Sopin
Conditions & tests for WP acceptance Approved by Mikhail Sopin
1.3. Test
Work Holder Agatha Maia
Revision Date
Process/Project Project Presentation “Developing the project team” 2016-02-13
Work Package # Name 1.3. Test
Work Package Short Description Test for presentation content and delivery process
Work Package Deliverables Accomplished tests
Work Package Requirements - The power point file must have 27 slides on max
- The presentation must be delivered in 30 minutes
- The background of the slides must be lightly colored and the font must be dark color
- The body of the document must demonstrate outstanding use of English
- The presentation must have no more than 40% of text
- The presentation must have 60% of images or diagrams
- The sources and references of the information must be contained in the presentation
- Format documents in APA style, following the rubric for exceptional evaluation.
9
Work Package In Scope - Process of presentation
- Design in APA format
- Content of the presentation
Work Package Out of Scope -Participants question -Plagiarisms test
Work Package Work to be done 1. Checking content; 2. Mock presentation 3. Survey from teammate 4. Process Improvement
Work Package costs: basis & details of cost estimates; total costs
314 CAD (labor)
Work Package Schedule Start date Finish Date Duration, hours
02.19.16 02.20.16 2
Risk Management Risk ID
Risk Name and
Description
Related to Task
Overall risk Strategy Risk response plan
3 Attendance of teammates
Test 6.00% Mitigate Team mate should be ready to accomplish the work of absent person
Work Package Leader and Team Mikhail Sopin Olga Dubovyk Agatha Maia Anusha Nandagopal Eduardo Ikezaki
Work Package Release approved by: Mikhail Sopin
Conditions & tests for WP acceptance Approved by Mikhail Sopin
10
1.4. Presentation delivery
Work Holder Olga Dubovyk Revision Date
Process/Project Project Presentation “Developing the project team”
2016-02-13
Work Package # Name 1.4. Presentation delivery
Work Package Short Description Process of presentation delivery to Bob and class
Work Package Deliverables Done assignments
Work Package Requirements - The presentation must be delivered in 30 minutes
- Each member of the team must be prepared to present their topic in 6 minutes on max
- Each member must be aware of the entire content of the presentation
Work Package In Scope - Process of presentation
- Hard copy
Work Package Out of Scope - Word document hard and soft copy - Colored hard copy of the presentation - Handle outs
Work Package Work to be done 1.Creating individual notes 2. Acquaintance with whole content by each team member 3. Delivery presentation 4. Answer the questions
Work Package costs: basis & details of cost estimates; total costs
250 CAD (labor)
Work Package Schedule Start date Finish Date Duration, hours
02.20.16 02.20.16 3
Risk Management Risk ID Risk Name
and Description
Related to Task Overall
risk Strategy Risk response plan
11
4 Attendance of teammates
Presentation delivery
10.00% Mitigate Team mate should be ready to accomplish the work of absent person
8 Lack of
preparation Presentation
delivery 24.00% Avoid Trial presentation
10
Team member do
not understand
whole content
Presentation delivery
2.00% Avoid Trial presentation
14 Broken
projector Presentation
delivery 5.00% Research Check technical condition before presentation
15 Out of service printer
Presentation delivery 5.00% Mitigate Print materials day before
Work Package Leader and Team Mikhail Sopin Olga Dubovyk Agatha Maia Anusha Nandagopal Eduardo Ikezaki
Work Package Release approved by: Mikhail Sopin
Conditions & tests for WP acceptance Approved by Mikhail Sopin
12
SCHEDULE+COST WBS Task Name Duration Start Finish Resource Names Cost 1 Developing project team 84.5 hrs Wed 16-02-10 Mon 16-02-22
$ 3,666.00
1.1 Planning 27.5 hrs Wed 16-02-10 Sat 16-02-13
$ 1,344.00 1.1.1 Scope statement 4 hrs Wed 16-02-10 Thu 16-02-11 Olga,Michail,Agatha,Eduardo,Anusha,Food[$ 15.00] $ 515.00 1.1.2 Schedule 2 hrs Fri 16-02-12 Fri 16-02-12 Michail[50%],Olga[50%] $ 50.00 1.1.3 Resource estimation 1 hr Fri 16-02-12 Fri 16-02-12 Olga[50%],Michail[50%] $ 25.00
1.1.4 Quality rubric 3 hrs Fri 16-02-12 Fri 16-02-12 Agatha[50%],Eduardo[50%],Anusha[50%],Olga[50%],Michail[50%]
$ 187.50
1.1.5 HR Processes 2 hrs Fri 16-02-12 Fri 16-02-12 Agatha[50%],Eduardo[50%],Anusha[50%] $ 75.00 1.1.6 Communication matrix 2 hrs Sat 16-02-13 Sat 16-02-13 Agatha,Anusha,Eduardo $ 150.00
1.1.7 Risk register 2 hrs Sat 16-02-13 Sat 16-02-13 Agatha,Anusha,Eduardo,Michail,Olga,Food[$ 30.00],Transportation[8]
$ 304.00
1.1.8 Stakeholder register 1 hr Fri 16-02-12 Fri 16-02-12 Anusha[50%],Agatha[50%],Eduardo[50%] $ 37.50 1.1.9 Approve PMP 0 hrs Sat 16-02-13 Sat 16-02-13
$ 0.00
1.2 Presentation 60.5 hrs Sat 16-02-13 Mon 16-02-22
$ 1,758.00 1.2.1 Research 38.5 hrs Sat 16-02-13 Thu 16-02-18
$ 1,155.00
1.2.1.1 Topics definition 1 hr Sat 16-02-13 Sat 16-02-13 Olga,Eduardo,Michail,Agatha,Anusha $ 125.00 1.2.1.2 Data collection 5 hrs Wed 16-02-17 Wed 16-02-17 Olga,Eduardo,Michail,Agatha,Anusha,Food[$ 30.00] $ 655.00 1.2.1.3 Content filtering 2 hrs Thu 16-02-18 Thu 16-02-18 Olga,Michail,Eduardo,Anusha,Agatha $ 250.00 1.2.1.4 Finalizing 1 hr Thu 16-02-18 Thu 16-02-18 Olga,Eduardo,Anusha,Agatha,Michail $ 125.00 1.2.1.5 Approve content 0 hrs Thu 16-02-18 Thu 16-02-18
$ 0.00
1.2.2 Design 3.5 hrs Fri 16-02-19 Fri 16-02-19 Food[$ 40.00],Transportation[8] $ 564.00 1.2.2.1 PPT design 2 hrs Fri 16-02-19 Fri 16-02-19 Olga,Michail,Agatha,Anusha,Eduardo $ 250.00 1.2.2.2 Precis 1 hr Fri 16-02-19 Fri 16-02-19 Olga,Michail,Agatha,Anusha,Eduardo $ 125.00 1.2.2.3 Arrange slides 1 hr Fri 16-02-19 Fri 16-02-19 Olga,Michail,Agatha,Anusha,Eduardo $ 125.00 1.2.2.4 Send soft copy 0 hrs Fri 16-02-19 Fri 16-02-19
$ 0.00
1.2.3 Printed copy 2 hrs Sat 16-02-20 Mon 16-02-22
$ 39.00 1.2.3.1 USB transferring 1 hr Sat 16-02-20 Sat 16-02-20 Michail[50%] $ 12.50 1.2.3.2 Printing 1 hr Mon 16-02-22 Mon 16-02-22 Printer[15],Michail $ 26.50 1.2.3.3 Hard copy 0 hrs Mon 16-02-22 Mon 16-02-22
$ 0.00
1.3 Test 2 hrs Fri 16-02-19 Sat 16-02-20
$ 314.00
1.3.1 Presentation`s content test
1 hr Fri 16-02-19 Fri 16-02-19 Agatha,Anusha,Olga,Michail,Eduardo $ 125.00
1.3.2 Presentation`s delivery test
1 hr Sat 16-02-20 Sat 16-02-20 Agatha,Anusha,Olga,Michail,Eduardo,Food[$ 40.00],Transportation[8]
$ 189.00
1.3.3 Accomplished test 0 hrs Sat 16-02-20 Sat 16-02-20
$ 0.00 1.4 Presentation delivery 3 hrs Sat 16-02-20 Sat 16-02-20 $ 250.00 1.4.1 Notes 1 hr Sat 16-02-20 Sat 16-02-20
$ 0.00
1.4.2 Presentation delivery 2 hrs Sat 16-02-20 Sat 16-02-20 Agatha, Anusha, Olga, Michail,Eduardo $ 250.00
13
HR MANAGEMENT PLAN
Project Organization Chart This section provides a graphic display of the project tasks and team members. The purpose of this is to illustrate the responsibilities of team members as they relate to the project tasks. It should be noted that the level of detail may vary depending on project complexity.
14
Process of Developing Team Work In order to develop the Team, the members and Leader assigned must attempt to informal meetings and the Final Survey to
evaluate personal and Team Work skills. The survey is going to result in an Improvement Plan as a Team and as Individual. The assessment mentioned must follow the table below:
Assessment Tool Description Purpose Frequency Detail
Informal Meeting Informal Meeting with all of the members out of the class room environment
Integrate Team Members , Build team trust, Clarify mind,
As needed Suggested 30 min a day
Suggested: - Coffee House; - Lunch; - Co fraternization
Survey Copyright iWise2 eBusiness Ltd 2011
Survey to evaluate the performance of the team work and individual skills
Evaluate the performance of the Team Work and Individual
Once Before the presentation
- The team must answer the Survey individually
- The Leader is responsible for score the Survey;
- The results must be presented same day;
- The Survey must be ministered one day before the Presentation
Improvement Plan A response plan to improve skills based on the results collected in the survey
Improve Team Work and Team Member for next Projects
Once After survey
- The Imp. Plan must be presented the same day the Survey is ministered;
- The Imp. Plan must content – Which behavior The Team Member is going to Keep and which he/she is going to avoid.
The survey is developed around number of key themes and building blocks that support team effectiveness. It acts as a
checklist and base assessment for team effectiveness and provides a platform for further discussion. The themes approached are: Goals and objectives; Leadership; Process and Control; Recognition and Reward; Relationship; Development; The Improvement Plan should content the behavior that the Team Member must either keep or avoid based on the themes
evaluated in the Survey.
15
RASCI Matrix The objective of the RASCI matrix is to identify the roles and responsibilities on each activity on the project
Step Tasks Mikhail (Leader)
Olga (Team Member)
Agatha (Team Member)
Anusha (Team Member)
Eduardo (Team Member)
Bob Xourafas (Stakeholder)
1.1.1 Scope Statement R,A C C C C S 1.1.2 Schedule R,A C,I C,I C,I C,I 1.1.3 Resource Estimation R,A C C C C I 1.1.4 Quality Rubric R,A I I I I S 1.1.5 RASCI Matrix A C C C R 1.1.6 Communication Matrix A C,I R C,I C,I I 1.1.7 Risk Register R,A C,I C,I C,I C,I 1.1.8 Stakeholder Register A C,I C,I R C,I 1.2.1 Research R,A C,I C,I C,I C,I 1.2.1.1 Topic definition R,A C,I C,I C,I C,I I 1.2.1.2 Data Collection R,A C,I C,I C,I C,I I 1.2.1.3 Content filtering R,A C,I C,I C,I C,I 1.2.1.4 Finalizing R,A C,I C,I C,I C,I 1.2.2 Design R,A C,I C,I C,I C,I 1.2.2.1 PPT Design R,A C,I C,I C,I C,I 1.2.2.2 Precis R,A C,I C,I C,I C,I 1.2.2.3 Arrange slides R,A C,I C,I C,I C,I 1.2.3 Printed copy A C,I R C,I C,I 1.2.3.1 USB transferring A C,I R C,I C,I 1.2.3.2 Printing A C,I R C,I C,I 1.3.1 Presentation content test R,A C,I C,I C,I C,I 1.3.2 Presentation delivery test R,A C,I C,I C,I C,I 1.4.1 Notes R,A C,I C,I C,I C,I
R Responsible A Accountable S Support C Consulted I Informed
16
Work Performance Report The Project requires two types of Work Report: Formal Work Report and Informal Work Report. Both Work Performance
Reports must follow the instruction below:
Type Description Approach Purpose Frequency Content
Formal Work Report
Printed report that’s shows the evaluation of the work done.
- Formal Report - according to the contents described.
Evaluate work done; Identify changes needed; Analyzing Performance;
Once Before the Presentation
Project Schedule Comparative – Time and Activities X Performance Data; Knowledge area score; Integration Score; Team Work Score; Improvement Plan;
Informal Work Report
Daily feedback and sharing work done.
- Mobile App (What’s app)
- Face to face; - Drop Box; - Email;
Monitor and Control work done
Daily, as it goes.
Tasks completed; Template shared; Work done reviewed; Resource shared;
The Project Managers and Project Team are responsible for developing and following up an Improvement Plan, in case of low track.
Staffing Management This section contains information on several areas including: when and how human resource requirements will be acquired, the timeline for when resources are needed and may be released, training for any resources with identified gaps in skills required, how performance reviews will be performed, and the rewards and recognition system to be used.
Role Responsibility Staffs Required
Acquiring Method
Training Needed
Performance Review Recognition/Reward
Project Manager - Mikhail
Leading Team, Plan Project, Monitor and control Presentation Delivery
1 Available No
• Rating Scale • Observation • Confidential
Records
• Upon Successful Completion of Project
Project Team – Olga, Agatha, Eduardo, Anusha
Plan Project Research content, Design presentation, Print hardcopy, Assure quality, Review Deliverables, Test 1, Test 2, Presentation delivery
4 Available Yes
• Observation • Status Reports • Presentation
• Upon milestone completions
17
STAFF RESOURCE CALENDAR
Stakeholder - Bob
Overall review of presentation Evaluation Support Comments Questions
1 Available No
• Observation • Reports • Ranking • Evaluation • Questions
• Upon successful completion of presentation
College Admin
Facilities Amenities
4 Available No
• Observation • Equipment
Count • Report
• Upon support and completion of presentation
Audience
Listening Comments Questions 5
Available on demand
No
• Comments • Questions
• Upon completion of presentation
Staff Acquiring date Duration (Weeks –
Wed, Fri, Sat)
Full Time(FT)/Part
Time(PT) Rate (CAD) Rate unit
Project Manager - Mikhail
10/02/2016 2 FT 25 Hour
Project Team – Olga, Agatha, Eduardo, Anusha
10/02/2016 2 FT 25 Hour
Stakeholder - Bob 10/02/2016 2 FT 85 Hour
College Admin 10/02/2016 2 FT 55 Hour
Audience
20/10/2015 1 FT 68 Hour
18
COMMUNICATION MATRIX
QUALITY MANAGEMENT PLAN INTRODUCTION: The Quality Management Plan is an important part of any project planning. The purpose of it is document how quality will be managed throughout the project. It includes all the processes and procedures to ensure quality planning, assurance and control.
Quality Requirements:
Area Process requirement Product requirement
Presentation Criteria • Must be able to articulate the
RUBRICS standards • Should follow APA format
• Should be unambiguous, precise and should abide RUBRICS standards. • Ordering of the slides should be cohesive
Presentation Research Criteria
• Research on content should be relative to the selected topic
• Use the materials/references that meet the quality standards
• Avoid re-designing
• Topic name and logo must be predominant on starting slide
Participants Roles Description Purpose Medium Frequency Responsible person
Bob Xourafas Supporting and Evaluation
Clarify the presentation content
Keep the project on track Face to face
As needed in class Project team
Hard copy Evaluate the presentation Printed copy Face to face
Once Agatha Maia
Soft copy Evaluation and posting on lessons learned
Email Once Mikhail Sopin
Presentation Delivery
Evaluate the project Face to Face Power point slides
Once Project team
Project Team Developing Management Plans and Presentation
Team Work Development of the Project Meeting face to face Mobile application
As needed in class Project Team
Team relationships
Team building Informal meeting
As needed Project Team
Project Files Sharing the project work Drop box As needed in class Project Team
Audience Accepting Presentation and asking questions
Presentation Delivery
Listen and provide feedback of the presentation
Face to Face Power point slides
Once Project team
College Administration
Providing environment and facilities
Feedback Grievance
Ensure clean environment and facilities;
Face to face Email As needed Anusha
19
Presentation Design Criteria
• Follow the same layout for all the slides.
• Make the slides interactive with appropriate images, graphs or texts
• Have a light background with dark text.
• Add reference at the bottom of the slides
• Must include reference at the bottom of the slides. • Add table or figure numbers for all images added. • Check for the Design standards
Presentation Print Out Criteria • Print the hard copies – 4 slides in
a page. • Check for the page orientation while printing.
Presentation Delivery • Combine slides and arrange
coherently
• Deliver presentation clearly and in 30 minutes.
• Check for flow of presentation
Quality Assurance:
Process Action Acceptable Process Standards Process Phase Assessment Interval
Presentation Criteria
QA testing for this needs test RUBRICS which includes
• Exceptional
• Standard
• Average
Requirements gathering Phase
On request
Presentation Research Criteria
• RUBRICS standard for Presentation is APA format
• Hard copy must be printed out in colour or as requested
• RUBRICS numbering standard which is Exceptional
• RUBRICS standard for evaluation
Execution Phase Once at initial design is confirmed
Presentation Design Criteria
• Presentation slides should have light background and dark fonts
• Should have images, graphs, charts, text, numbering,
Design Phase On Request
20
references as per APA format
Presentation Print Out Criteria
• Presentation should be printed out in A4 size sheets
• Can be a black and white or colored copy as requested
Execution Phase On Request
Quality Control:
Product Physical/Performance Standards Quality Assessment Activities Assessment Intervals
Presentation Criteria
• presentation testing
• grammatical error free
• Should be re-useable Functional testing
Immediately after changes were made On request
Presentation Research Criteria
• Check for RUBRICS requirements
• Check the content association with the topic to be presented
QA testing After gathering content
Presentation Design Criteria
• Authentication: identifying and verifying user’s identity who can update slides
• Presentation slides should consist of light background and dark fonts
• Check for appropriate images, graphs, charts, texts, numbering, references as per APA format
• Session maintenance
QA Testing Frequently or On demand
Presentation Print Out Criteria
• Printer network working
efficiency
• Checking and analyzing the paper quality
Quality and monitoring Just before the presentation starts and On demand
21
PROCESS IMPROVEMENT PLAN
Process Boundaries
Process Start End Inputs Outputs Stakeholder
Project Management Plan
Process starts developing the Scope Statement.
After reviewing all the Management Plans and documents done.
Templates from previous semester; online templates.
Documents and Plans to guide the Project execution.
Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga
Research Start after the team decide the topics that are going to be presented.
Ends once the group understand they have enough content.
Online source, books and shared experience.
Content to design and delivery of the presentation; Note.
Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga
Design Starts after finalizing the research.
Process is complete once the slides are done and reviewed.
Research. Slides for the presentation. Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga
Printed Copy Process starts after slides are ready.
It is completed when the document is printed.
Soft copy. Hard copy. Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga;Bob Xourafas;
Test Process starts after slides are ready.
It is completed after the deliverables are reviewed.
Presentation delivery and slides.
Feedback from the team and Improvement Plan.
Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga
Presentation Delivery
In February, 20th after all team members are ready.
It ends after the audience and Bob ask questions.
Slides and notes. Excellent grades and knowledge shared.
Project Team: Agatha, Anusha, Eduardo, Mikhail and Olga;Bob Xourafas;Audience;
Process Configuration
Management
Plan and
Documents
Research
Printed Copy
Presentation
Delivery
Design
Test
Topics are
assigned to
the Team
Members.
Judgement;
Changes
and Imp.
Well Done!
Fail
Presentation
Delivery
Printed Copy
22
Target for Improved Performance
The deliverables that are going to be tested are the Power Point slides presentations and the Presentation Delivery. The targets for the Improvement Performance are the content in the Table Quality Assurance.
The deliverables are going to be analyzed and compared to the targets, the team members are going to judge whether they have to be improved or not. All the improvements must be corrected right the way.
After the improvements the Project is ready to be deliverable. The team understands that new tests are not necessaries since the project is a small one.
The improvements must be content in the table Quality Control Measurement to be used as lesson learned for next Projects.
Quality Control Measurement
Deliverable Item Measure
d
Acceptable (yes/ not)
Recommendation Owner
Presentation Delivery
Content
Presentation Delivery
Time
Presentation Delivery
Accuracy
Power Point Slides
Content
Power Point Slides
Design
23
RISK REGISTER Risk ID
Risk Name and Description Risk Owner Related
to Task
Probability
%
Impact %
Overall risk Strategy Risk response Risk response
plan Status
Human Aspects
1 Attendance of teammates
Mikhail Sopin
Research
10%
20% 2,00% Mitigate Careful time management
Team mate should be ready to accomplish the work of absent person
Active
2 Attendance of teammates
Design 20% 2,00% Mitigate Careful time management
Team mate should be ready to accomplish the work of absent person
Active
3 Attendance of teammates
Test 60% 6,00% Mitigate Careful time management
Team mate should be ready to accomplish the work of absent person
Active
4 Attendance of teammates
Presentation
delivery 100% 10,00% Mitigate
Careful time management
Team mate should be ready to accomplish the work of absent person
Active
5 Absence of Instructor Project team
Presentation delivery
5% 100% 5,00% Accept - - Active
Data
6 Lack of presentation
originality Olga Dubovyk Research 20% 30% 6,00% Avoid Deep research
-Using different resource types -Instructor's help
Active
7 Lack of content Anusha
Nandagopalandagopal
Research 25% 35% 8,75% Avoid Deep research -Using different resource types -Instructor's help
8 Lack of preparation Olga Dubovyk
Presentation delivery
30% 80% 24,00% Avoid Excellent preparation
Trial presentation Active
9 Lot of content Agatha Maia Design 5% 20% 1,00% Accept - - Active
10 Team member do not
understand whole content
Anusha Nandagopalandagopal
Presentation delivery
5% 40% 2,00% Avoid Excellent preparation
Trial presentation Active
11 Internet out of service Project Team Research 2% 50% 1,00% Accept - - Active
24
12 APA standard
mismatch Eduardo Ikezaki Design 20% 5% 1,00% Accept - - Active
13 Out of timing Project Team Presentation
delivery 15% 5% 0,75% Accept - - Active
Technical
14 Broken projector Mikhail Sopin Presentation
delivery 5% 100% 5,00% Research Check
Check technical condition before presentation
Active
15 Out of service printer Eduardo Ikezaki Presentation
delivery 5% 100% 5,00% Mitigate Fallback
Print materials day before
Active
16 Broken usb Agatha Maia Presentation
delivery 1% 10% 0,10% Accept - - Active
CHANGE CONTROL The lifecycle of the Project is only 2 weeks. It is considered a short term Project, since that the team has decided that the
Project Team is also the Change Board and the Changes Request document is not necessary. The changes during the lifecycle project must follow the instructions bellow:
1. The changes requested must be discussed by the team at the time the change shows necessary; 2. The changes requested must be delivered as a feedback using face to face, email or mobile app as approach; 3. The changes requested will be discussed by the team and the decision will be taken by the majority; 4. The decision will be taken based on the Project Goals; 5. The changes requested will be either Accepted or Rejected; 6. All the Changes Requested must be content in the Change Log, according to the table Change Log;
Change Log
The changes suggested during the projected must be content in the Changes Log, according to the table below.
ID By Change Description Decision Taken Due Time Status