Download - Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Transcript
Page 1: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Fact Sheets

Page 2: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating and attractive. We specialise in the design of buildings for education, leisure and buildings specifically for use by people with disabilities.

We aim to give an excellent service to our clients and to achieve results of which we can all be proud. Professional teamwork is essential and we believe this embraces the client and contractors, as well as the designers.

We are based in a large open plan studio in North London and the practice consists of two partners and three Associates who oversee a staff of twelve architects, architectural assistants and technicians, two administrative staff, one consultant and two part time staff. The growth and composition of the practice has been carefully maintained to ensure that every project receives the highest standard of design and service with prompt attention to every detail. BHP Architects established an office in Dublin in 2006 and is currently engaged on two major school projects in Ireland. We are passionate about design, but we also believe in good management of the process, from concept to completion and beyond. At the heart of our practice philosophy is a commitment to working closely with our client, the end users and stakeholders, at every stage of the project. This close working relationship provides a real understanding of the needs and aspirations and ensures that every aspect of the project is carefully considered to provide a building which is functional, accessible, aesthetically pleasing, environmentally conscious, user friendly and uplifting to the spirit. For every scheme a carefully selected professional team is formed around a partner who personally implements concept development and maintains daily management of all stages of the project through to completion. Teams are structured to meet all client deadlines, with rigorous production information and cost control systems, which ensures absolute respect for the design, budget and procurement, throughout every stage of the design and construction period. We meet these requirements by assigning adequate numbers of suitably trained personnel for the design, management, performance and verification activities.

The Practice

Design Philosophy

Practice Management

Page 3: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

We operate Quality Management systems equivalent to the standards set by ISO 9001, for the administration and control of all projects carried out by the practice. Our quality management systems control all aspects of the programme, including design, budget and maintenance. A series of office manuals detail the procedures for office and project administration, design and document co-ordination, quality control, project management, contract administration, health and safety duties, equal opportunities, etc. These manuals are available on request.

Our quality systems are both project specific and applied to the day to day

operation of the practice. Internal staff audits occur throughout the year covering all aspects of work procedures (administration, project files, drawing/ CAD procedures, correspondence, etc).

We believe that effective communications are essential to the success of all projects. We place great importance on communication with clients, users and stakeholders, the provision of clear, accurate and concise reports, drawings and documentation, including 3D visualisation, animations and models. Consultation gives us vital information to inform the building design and we involve all stakeholders in a variety of different ways from workshops to open days. We also understand the vulnerabilities and sensitivities that certain user groups have and tailor the consultation to suit their needs in order to achieve effective feedback.

Sustainable thinking is completely integrated with design, construction technology and methods, components and choice of materials, therefore it must be considered from the outset of any project and influences the decisions we make. Sustainability, consultation and process management are key components to our approach when designing buildings and we believe that all three are interdependent key components in adding value to any project. The challenge is to design buildings and spaces that balance high quality, durability and value, with the equally important environmental, social and economic aspects of sustainability.

Our own impact on the environment has been assessed and we now have an Environmental Management System which accords with ISO 14001.

Quality Management

Communication

Sustainability

Page 4: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Our policy is to comply with Health, Safety and Welfare at Work legislation and

provide and maintain safe and healthy working conditions, equipment and systems of work for our employees and provide information, training and supervision needed for this purpose. We also accept our responsibility for the health and safety of other people who may be affected by our activities. BHP Architects also recognise that occupational health, safety and welfare are of paramount importance in the management of its business and seek to create and maintain a safe and healthy working environment. All employees receive regular training in their responsibilities and to keep them up to date with current and forth-coming regulations and legislation. Training is repeated at regular intervals and whenever changing legislation or working methods require. The office library contains a wide selection of publications recommended by both RIBA and the HSE. The office management procedures include the requirement for health and safety to be considered at every stage of the design process. Employees required to visit building sites are provided with training, as appropriate and necessary for the fulfilment of their duties and the requisite equipment and clothing to carry them out. All employees visiting a building site are required to comply with the requirements of this policy, in particular the provision and use of protective equipment and clothing, including the requirement to wear a safety helmet, protective footwear and ‘high viz’ clothing at all times. BHP Architects shares the knowledge gained on projects across the organisation by way of our ‘cross team’ setup, by regular office meetings and seminars and by encouraging staff to participate in Continuing Professional Development (CPD). We recognise the importance of further education and training and are committed to Continuing Professional Development (CPD) for the partners and all project staff. The partners encourage all staff to participate in seminars and lectures to update their professional knowledge. We are on the RIBA’s CPD mailing list and maintain an extensive and regularly updated technical library, to ensure that it is fully acquainted with forthcoming requirements in connection with all aspects of the building process. All employees are encouraged to maintain and advance their competence and are required to undertake a minimum of 35 hrs CPD per annum, in line with RIBA guidelines. Personal Development Plans are prepared by all professionally qualified members of staff, who are encouraged to discuss these with other colleagues both informally and at in-house seminars on new technologies.

Professional Development

Health & Safety

Page 5: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The new performing arts centre at Coloma Convents Girls' School in Croydon has a large multi-purpose auditorium with retractable seating and acoustic wall panelling, which enables productions of music, drama and dance to be presented in a variety of formats. The domed portico provides a focus for the entrance to the new centre. Location Coloma Convent Girls’ School Upper Shirley Road, Croydon CR9 5AS Client Coloma Convent Girls’ School Client Project Manager Mrs Maureen Katalawela Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Slender Winter Partnership Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Hilife Construction Co Ltd Building Floor Area 650sqm Construction Cost £1,461,486.00 Tender Date December 2009 Contract Period 46 Weeks Completion Date February 2011

Coloma Performing Arts Centre

Page 6: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Remove temporary buildings and provide a new single storey extension accommodating three classbases, toilets, stores and a protected external play area. Location Danbury Park Primary School Well Lane Chelmsford Essex CM3 4AB Client Essex County Council Client Project Manager Sue Frost Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design WSP Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Ashe Construction Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Chris Elliston H&S: Jean Harford Building Floor Area 327sqm Construction Cost £987,982.00 Tender Date May 2008 Contract Period 35 Weeks Completion Date April 2009

Danbury Park Primary School

Page 7: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new two storey post-primary school, amalgamating three existing schools for 650 pupils in the age range 11 -18 years. The new accommodation includes; classrooms, specialist technology rooms, art, science, offices etc. Location Mountrath Community School Limerick Road Mountrath Co Laois Ireland Client Minister for Education & Science Client Team Liaison - Ann O'Neill Senior Architect - Frank Lewis Admin Officer - Eddie Quinn Procurement Management BHP Architects Building Design BHP Architects Structural Design Nicholas O'Dwyer Consulting Engineers Services Design BDP Dublin Landscape Design BHP Architects Health & Safety Consultant Irish Project Supervisors Cost Management Brendan Merry & Partners Construction JSL Group Ltd Building Floor Area 6201sqm Construction Cost €8,873,533.90 Tender Date January 2008 Contract Period 64 Weeks Completion Date September 2009

Mountrath Community School

Page 8: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey primary school for 210 pupils, in the age range of 5 to 11 years old, with the capability to expand to 330 then 420, pupil places. Location Queen Boudica Primary School Cowper Crescent Colchester CO4 5XT Client Essex County Council Client Project Manager Alan Waters Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design Wynne-Williams Associates Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Wilmott Dixon ECC Quality Inspection Team Building: Malcolm Gooch Mechanical: Alan Barham Electrical: Chris Elliston H&S: Jean Harford Building Floor Area 1492sqm - phase 1 Construction Cost £4,900,085.29 - phase 1 Tender Date April 2008 Contract Period 47 Weeks Completion Date August 2009

Queen Boudica Primary School

Page 9: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The new school is a single storey timber frame structure, with timber cladding and a concrete flat roof, used as a ‘heat sink’ and as an acoustic barrier to the City Airport flight path. The new building contains 16 classrooms, 2 halls, resources areas, offices, two Nursery classrooms and four Children’s Centre classrooms. Location Discovery Primary School Battery Road London SE28 0JN Client Greenwich Council Client Project Manager Maryam Sheikholeslami Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design Bell Fischer Associates Health & Safety Consultant Calford Seadon Cost Management Jeff Picket Associates Construction Morgan Ashurst Building Floor Area 2736sqm - School 410sqm - Children's Centre Construction Cost £8,500,000.00 Tender Date October 2006 Contract Period 52 Weeks Completion Date July 2008

Discovery Primary School

Page 10: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached building accommodating; four classbases, one resource room, toilets, and external play areas. Location Eversley Primary School Crest Avenue Pitsea Essex SS13 2EF Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Gee Construction Ltd ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 420sqm Construction Cost £823,000 Tender Date December 2006 Contract Period 42 Weeks Completion Date January 2008

Eversley Primary School

Page 11: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A single storey new model special school for pupils with a wide variety of profound and multiple disabilities, in the age range of 3 to 25 years old. Location Pioneer School Ghyllgrove Basildon SS14 2LA Client Essex County Council Client Project Manager Paul Critchley Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design Wynne-Williams Associates Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction ISG Jackson Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 3747sqm - phase 1 Construction Cost Main Building: £9,021,000.00 Tender Date December 2006 Contract Period 69 Weeks Completion Date December 2008

Pioneer Special School - Phase 1

Page 12: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached building accommodating; new nursery unit, toilets, circulation and protected external play area. Location Anchor Lane Canewdon Rochford Essex SS4 3PA Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Rose Builders Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 102sqm Construction Cost £354,122.00 Tender Date December 2006 Contract Period 24 Weeks Completion Date September 2007

Canewdon Primary School

Page 13: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey independent building accommodating two Reception classbases, toilets, circulation, cloaks area and protected external play area. Location Elsenham CE Primary School, High Street Elsenham Bishop’s Stortford CM33 6DD Client Essex County Council Client Project Manager Don Parker Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design Wynne-Williams Associates Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Haynes & Smith Ltd ECC Quality Inspection Team Building: Paul Cowan Mechanical: David Morton Electrical: Chris Elliston H&S: Jean Harford Building Floor Area 280sqm Construction Cost Main Building: £539,284.35 Tender Date June 2006 Contract Period 32 Weeks Completion Date April 2007

Elsenham CE Primary School

Page 14: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A New Sports Centre funded by BLF at Eltham Green School, provides a four court sports hall, ancillary changing rooms and also houses a number of smaller rooms and community spaces and provides replacement hard play area. The external areas provide access to all parts of the building for disabled users. Location Eltham Green School Middle Park Avenue Eltham London SE9 5EQ Client Greenwich Council Client Project Manager Maryam Sheikholeslami Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant Calford Seadon Cost Management Jeff Picket Associates Construction Gee Construction Ltd Building Floor Area 1100sqm Construction Cost £1,636,228.00 Tender Date October 2005 Contract Period 48 Weeks Completion Date January 2007

Eltham Green Sports Centre

Page 15: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey steel framed building, accommodating; eight learning spaces, ICT rooms, seminar room, reception, toilets and a coffee lounge. Location Essex Adult Learning College Spinks Lane Witham Essex CM1 1EP Client Essex County Council Client Project Manager Laura Smith Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design Wynne-Williams Associates Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Ashe Construction Ltd ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 850sqm Construction Cost £1,803,278.00 Tender Date September 2005 Contract Period 42 Weeks Completion Date January 2007

Essex Adult Learning College

Page 16: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new independent building, accommodating three classbases, toilets, circulation, cloaks area and plant room. Location Creswick Avenue Rayleigh Essex SS6 9HG Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Fredrick J French Ltd ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 250sqm Construction Cost Enabling Works: £137,656.00 Main Building: £598,498.00 Tender Date October 2006 Contract Period 44 Weeks Completion Date October 2007

Glebe Junior School

Page 17: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new independent building, accommodating three classbases, one resource room, toilets, circulation, cloaks area and plant room. Location Jotman's Hall Primary School High Road Benfleet Essex SS7 3RG Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction A W Hardy & Co Ltd ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 306sqm Construction Cost £634,912.00 Tender Date October 2006 Contract Period 32 Weeks Completion Date August 2007

Jotman's Hall Primary School

Page 18: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached building accommodating; three classbases, toilets, and plant room, with a covered link to the existing school. Location Newlands Spring Primary School Dickens Place Newland Springs Essex CM1 4UU Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Barter Hill Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Beardwell Construction Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 250sqm Construction Cost £516,127.00 Tender Date April 2006 Contract Period 36 Weeks Completion Date April 2007

Newlands Spring Primary School

Page 19: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Demolition of two reloctable classrooms and a new permanent two classbase extension linked to the existing circulation by an enclosed corridor. Location Oakland's Infant School Vicarage Road Chelmsford Essex CM2 9PH Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Barter Hill Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Haynes & Smith ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 206sqm Construction Cost £463,993.00 Tender Date May 2006 Contract Period 30 Weeks Completion Date Mar 2007

Oakland's Primary School

Page 20: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Demolition of one reloctable classroom and an independent new permanent two classbase extension with staffroom, medical room, toilets and stores. Location Roydon Primary School Epping Road Essex CM19 5HN Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Barter Hill Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Enterprise McGinley ECC Quality Inspection Team Building: Paul Cowan Mechanical: Alan Barham Electrical: Chris Elliston H&S: Jean Harford Building Floor Area 246sqm Construction Cost £657,094.00 Tender Date August 2006 Contract Period 32 Weeks Completion Date July 2007

Roydon Primary School

Page 21: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached extension accommodating two classbases, group room, hygiene room and toilets with a covered link to the existing school. Location William Martin Infant School Tawneys Road Harlow Essex CM18 6PW Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Barter Hill Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Haynes & Smith ECC Quality Inspection Team Building: Paul Cowan Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 202sqm Construction Cost £481,993.00 Tender Date June 2006 Contract Period 32 Weeks Completion Date June 2007

William Martin Infant School

Page 22: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached extension accommodating two classbases, stores, with a covered link to the existing school and a 'climbing wall'. Location Winter Gardens School Hilton Road Canvey Island Essex SS8 9QA Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Robin Chandna Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Indecon Building Services Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 135sqm Construction Cost £339,242.00 Tender Date October 2006 Contract Period 30 Weeks Completion Date August 2007

Winter Gardens Junior School

Page 23: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached building accommodating; twelve changing rooms, officials changing, toilets, showers and a 3G all-weather sports pitch. Location Witham Sports Pavilion Spinks Lane Witham Essex CM1 1EP Client Braintree District Council Client Project Manager Laura Smith Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Jackson Building Services ECC Quality Inspection Team Building: Richard Over Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 560sqm Construction Cost £1,760,528 (includes A-W Pitch) Tender Date March 2006 Contract Period 46 Weeks Completion Date June 2007

Sports Pavilion and A-W Pitch

Page 24: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached extension accommodating one classbase, ICT room, toilets and plant room, with an enclosed link to the existing school. Location John Ray Junior School Notley Road Braintree Essex CM7 1HL Client Essex County Council Client Project Manager Don Parker Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction A W Hardy Ltd ECC Quality Inspection Team Building: Malcolm Gooch Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 212sqm Construction Cost £459,068.00 Tender Date November 2005 Contract Period 28 Weeks Completion Date September 2006

John Ray Junior School

Page 25: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new sports centre at Latymer School funded by the DES and parent appeal, with; a four court sports hall, changing rooms, toilets, plant rooms, staff room, three sports science classrooms, kitchen, dining room, and a fully fitted fitness suite. Location The Latymer School Haselbury Road London N9 9TN Client The Latymer Foundation Client Project Manager School - Harry Richardson Foundation - Ray Tuthill Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Ashe Construction Ltd Building Floor Area 1400sqm Construction Cost £2,569,731.94 Tender Date October 2004 Contract Period 48 Weeks Completion Date January 2006

Latymer Sports Centre

Page 26: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached building accommodating two new classbases, food technology, hygiene room, toilets, circulation and plant areas. Location Newport Primary School Frambury Lane Newport Essex CB11 3PU Client Essex County Council Client Project Manager Matt Cawley Procurement Management BHP Architects Building Design BHP Architects Structural Design Barter Hill Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Kier Eastern ECC Quality Inspection Team Building: Paul Cowan Mechanical: Alan Barham Electrical: Mick Wooley H&S: Jean Harford Building Floor Area 202sqm Construction Cost £422,932.00 Tender Date July 2005 Contract Period 30 Weeks Completion Date March 2006

Newport Primary School

Page 27: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The former Eaglesfield School was remodelled to provide a new post 16 Centre for 1000 pupils, with spaces for lifelong learning including, classrooms, hair and beauty, catering, construction, ICT, special needs, science, library, design studios, offices, seminar rooms and Cyber Café. The works were carried out in four phases from 2002 - 2006. Location Shooters Hill Campus Red Lion lane London SE18 4LD Client Greenwich Council Client Project Manager Peter Sherlock Procurement Management BHP Architects Building Design BHP Architects Structural Design London Borough of Greenwich Services Design REL & Southpark Landscape Design BHP Architects Health & Safety Consultant Kennedy Haywards Cost Management James Nisbet & Partners Construction Lakehouse Contracts Ltd Building Floor Area 7200sqm Construction Cost £6.5million in four phases Tender Date June 2001 Contract Period 4 years - 4 phases Completion Date July 2006

Shooters Hill Post 16 Campus

Page 28: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The new Design & Technology Centre at Coloma Convent Girls' School in Croydon has a curved concave metal roof with solar shading and cedar wall cladding. The new building accommodates; a spacious main entrance, IT Resource, Multi-Materials, Electronics, preparation rooms, Textiles, Seminar Room, Staff Room, Office and Toilets. Location Coloma Convent Girls’ School Upper Shirley Road, Croydon CR9 5AS Client Coloma Convent Girls’ School Client Project Manager Mrs M Martin Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Ltd Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Albert Soden Ltd Building Floor Area 1050sqm Construction Cost £1,284,026:00 Tender Date October 2004 Contract Period 38 Weeks Completion Date September 2005

Coloma Design & Technology Centre

Page 29: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description New modular pre-fabricated buildings providing classbases and halls at four Primary Schools in Essex. Location Ardleigh Primary School James Hornsby Primary School Dr Walker Primary School Whitmore Primary School Client Essex County Council Client Project Manager Don Parker Paul Critchley Procurement Management BHP Architects Building Design BHP Architects Structural Design Conisbee & Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Framework CDM ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Wooley Construction Cost £450,000.00 - Ardleigh £343,000.00 - Dr Walker £640,000.00 - James Hornsby £689,092.00 - Whitmore Tender Date November 2004 Contract Period 20-28 Weeks Completion Date August 2005

Essex modular pre-fabricated school buildings programme

Page 30: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new independent building, accommodating six classbases, library, hygiene suite, toilets, cloaks area and small hall, with a covered link to existing school. Location Notley Green Primary School Blickling Road Great Notley Essex CM7 8ZJ Client Essex County Council Client Project Manager Paul Critchley Procurement Management BHP Architects Building Design BHP Architects Structural Design Hindley Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Rose Builders Ltd ECC Quality Inspection Team Building: Malcolm Gooch Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 650sqm Construction Cost £1,346,036.37 Tender Date August 2004 Contract Period 46 Weeks Completion Date August 2005

Notley Green Primary School

Page 31: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The redevelopment of Sunshine House School for the RNIB provides teaching and residential accommodation for 30 visually impaired children between the ages of two and eight. The scheme retains the existing main house which, together with new extensions, provides additional teaching and catering facilities and a hydrotherapy pool. Location Sunshine House School

33 Dene Road Northwood Middlesex HA6 2DD

Client RNIB Client Project Manager Mr Neville Lawson Procurement Management Gardiner and Theobald Ltd Building Design BHP Architects Structural Design K A Marshall and Partners Services Design Silcock Dawson and Partners Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Bryen and Langley Limited Building Floor Area 1875sqm Construction Cost £2,542,004.00 Tender Date October 2002 Contract Period 60 Weeks Completion Date August 2004

Sunshine House School

Page 32: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new single storey detached extension accommodating ten classbases, small hall, staff room, and hygiene room, with enclosed links to the existing school and a landscaped tiered courtyard. Location Church Langley Primary School Church Langley Way Harlow Essex CM17 9PH Client Essex County Council Client Project Manager Paul Critchley Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction Farrans Construction Ltd ECC Quality Inspection Team Building: Alan Jacobs Mechanical: Alan Barham Electrical: Frank Harwood Building Floor Area 1153sqm Construction Cost £1,312,000.00 Tender Date July 2002 Contract Period 46 Weeks Completion Date August 2003

Church Langley Primary School

Page 33: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Two new single storey detached extensions accommodating; eight new classbases, toilets, coat areas, plant rooms and circulation areas, including links to the existing School. Location Millhouse Primary School Tavistock Road Laindon Basildon SS15 5QF Client Essex County Council Client Project Manager Ken Coles Procurement Management BHP Architects Building Design BHP Architects Structural Design Hindley Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction A W Hardy Ltd ECC Quality Inspection Team Building: Paul Cowan Mechanical: Alan Barham Electrical: Frank Harwood Building Floor Area 760sqm Construction Cost £1,139,152.00 Tender Date July 2002 Contract Period 46 Weeks Completion Date August 2003

Millhouse Infant and Junior Schools

Page 34: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new independent teaching block attached to the existing school building by a glazed 'flying' bridge link. The new building is a two storey steel frame structure, with terracotta cladding panels and contains eight classrooms, ICT Suite, resource rooms, offices, plant room, lift and circulation. Location Woolwich Polytechnic School Hutchins Road Thamesmead London SE28 8AT Client Greenwich Council Client Project Manager Peter Sherlock Procurement Management BHP Architects Building Design BHP Architects Structural Design Hindley & Associates Services Design Integrated Building Services Landscape Design BHP Architects Health & Safety Consultant Kennedy Haywards Cost Management James Nisbet & Partners Construction Roper Construction Ltd Building Floor Area 986sqm Construction Cost £1,391,591.00 Tender Date January 2002 Contract Period 45 Weeks Completion Date January 2003

Woolwich Polytechnic School

Page 35: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The single storey building has an exposed structural steel frame, with a curved metal deck roof and fully glazed external walls. It accommodates a range of flexible learning and local community spaces and has been designed to be capable of expansion without disruption, to provide a library and fitness centre. Location Abbey Wood CLC Eynsham Drive Abbey Wood London SE2 9AL Client Greenwich Council Client Project Manager Peter Sherlock Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Integrated Building Services Landscape Design Bell Fischer Associates Health & Safety Consultant Kennedy Haywards Cost Management James Nisbet & Partners Construction Bryen & Langley Ltd Building Floor Area 520sqm Construction Cost £830,000.00 Tender Date June 2001 Contract Period 30 Weeks Completion Date April 2002

Abbeywood City Learning Centre

Page 36: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description The new building provides sports and dining facilities for Hinchley Wood School, the adjacent Primary School and the local community. It includes a 3 court sports hall, fitness suite, dance studio, cafeteria and kitchen. The crisp and colourful cladding encloses a high quality interior, providing a robust environment for school and community users. Location Hinchley Wood School Claygate Lane Esher Surrey KT10 0AQ Client Hinchley Wood School Client Project Manager Mr William Simmonds Procurement Management BHP Architects Building Design BHP Architects Structural Design Price & Myers Services Design Engineering Services Partnership Landscape Design BHP Architects Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction D J Trimming Ltd Building Floor Area 1500sqm Construction Cost £1,264,899.00 Tender Date June 2001 Contract Period 38 Weeks Completion Date July 2002

Hinchley Wood School Sports Centre

Page 37: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Replace temporary buildings with a new permanent two storey extension, including; six classrooms, two special needs classrooms, community facilities, Art studio, cloaks, toilets offices, etc., an 'eco unit' and a single storey extension for the main school reception. Works are due to start on site July 2011, for completion by August 2012. Location Churchfield Primary School Latymer Road London N9 9PL Client London Borough of Enfield Client Project Manager Niranjali Amarasinghe Procurement Management BHP Architects Building Design BHP Architects Structural Design Conisbee Ltd Services Design Pinnacle-ESP Landscape Design London Wildlife Trust Health & Safety Consultant Frankhams Cost Management Potter Raper Partnership Construction Not yet appointed Building Floor Area 1270sqm Construction Budget TBC Tender Date May 2011 Contract Period 50 Weeks Completion Date August 2012

Churchfield Primary School

Page 38: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A school expansion from 420 pupil places to 630 pupil places including new single storey extensions with; three reception classrooms, four classrooms, community facilities, new school reception area, cloaks, toilets offices, etc., Works are due to start on site July 2011, for completion by August 2012. Location Merryhills Primary School Bincote Road Enfield EN2 7RE Client London Borough of Enfield Client Project Manager Niranjali Amarasinghe Procurement Management BHP Architects Building Design BHP Architects Structural Design London Borough of Enfield Services Design London Borough of Enfield Landscape Design BHP Architects Health & Safety Consultant Frankhams Cost Management Potter Raper Partnership Construction Not yet appointed Building Floor Area 1000sqm - New Build 400sqm - Remodelling Construction Budget TBC Tender Date May 2011 Contract Period 50 Weeks Completion Date August 2012

Merryhills Primary School

Page 39: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description Primary school expansion project providing a new three storey extension with 8 classrooms and ancillary accommodation, internal remodelling of the existing school building, plus a new sports centre. Work is due to start on site June 2011. Location St Brigid's National School Beechpark Lawn Castleknock Dublin 15 Client St Brigid's National School Fingal County Council Client Team School - Mary Maher Fingal - Janet Ivers Procurement Management BHP Architects Building Design BHP Architects Structural Design Moylan Services Design Clarke Associates Landscape Design BHP Architects Health & Safety Consultant Integrated Risk Solutions Cost Management Bruce Shaw Partnership Construction Burns Construction Ltd Building Floor Area 1479sqm - New school building 1127sqm - Sports Centre Construction Cost €3,989,025.00 Tender Date June 2011 Contract Period 63 Weeks Completion Date September 2012

St Brigid's National School -Dublin

Page 40: Project Fact Sheets - BHP Architects PDF pages... · BHP Architects is a design-led practice which was formed in 1980. We create modern buildings that are intelligible, stimulating

Project Description A new primary school for 300 pupils near Stansted Airport, due to start on site July 2011, with; ten classrooms, hall, community spaces, toilets, offices, etc. Location Reeve Road Foresthall Park Stansted Mountfitchet CM24 8TT Client Essex County Council Client Project Manager Rebecca Cole Procurement Management Mace Group Ltd Building Design BHP Architects Structural Design Price & Myers Services Design JSH Ltd Landscape Design Wynne-Williams Associates Health & Safety Consultant BHP Architects Cost Management Jeff Picket Associates Construction May Gurney Ltd ECC Quality Inspection Team Building: Peter Corbett Mechanical: Alan Barham Electrical: Mick Woolley H&S: Jean Harford Building Floor Area 1683sqm Construction Budget £4,145,000.00 Tender Date March 2011 Contract Period 52 Weeks Completion Date July 2012

Stansted St Mary's Primary School