7/30/2019 Project 2- Integration 2012
1/2
SCHOOL OF ARCHITECTURE, BUILDING & DESIGNModern Architecture Studies in Southeast Asia (MASSA) Research Unit
Bachelor of Science (Honours) (Architecture)
BUILDING SCIENCE 2 [ARC 3413]Credit hours: 3Prerequisite: BUILDING SCIENCE 1 [ARC 2412]__________________________________________________________________________________Project 2 : Integration with Design Studio 5Submission date: Week 13 (6/12/2012)Marks : 20% of final Marks
Introduction
This project aims to integrate students' understanding of the principles of lighting and acoustics in the
context their final design project of studio 5. It encompasses advanced daylighting systems and theintegration of electrical lighting, strategies for noise management and room acoustics (where necessary).
Objectives
The objectives of this project are as follows:
To be able to show understanding of lighting and acoustics principles in their final design.
To be able to solve design problems in relation to sustainability issues (natural lighting, site
analysis).
To be able to design spaces incorporating lighting and acoustics (when necessary).
Learning Outcomes
Produce site analysis which document, interpret and analyze the site context in relation to lighting
and acoustics. Identify and analyze functional needs through case studies to inform of lighting and acoustics.
Tasks
Each student is required to incorporate 1A2 for Lighting Integrated Design and 1A2 for Acoustics IntegratedDesign boards and submit in a clear folder (front/back). Within your building design, you are required toidentify 2 spaces which require artificial lighting and day-lighting and for your acoustic you are required toidentify 2 spaces to integrate your external noises and internal noises. Integration must be solution basedand you are advised to incorporate visuals, diagrams and renderings using Ecotect or any otherenvironmental design analysis tools in your presentation board(s). Calculations to resolve your designintegrations solutions must be attached in A4 and submitted together.
Submission RequirementSubmit a CAREFULLY ORGANISED board(s) individually. You may use the design presentation boardformat.
Assessment criteria
To achieve higher marks, a student will, in addition to the pass requirements
Do your research and case studies for the chosen topic to be incorporated in your design.
1
7/30/2019 Project 2- Integration 2012
2/2
Discuss in depth the chosen topic for the integration.
Building Science 2 Marking CriteriaProject 2-Integration 20%
TOTAL MARKS (100%)
DEDUCT PENALTY ( days)
FINAL MARKS (100%)
FINAL MARKS (20%)
Excellent Good Evident Inadequate Poor
LightingCond
itions
Theme/ Ambiance
DaylightPsali / switching / night
Light contour -ecotect
Artificial
Lumen method calculations
No of fixtures / lamps / details
Reflectance: materials/ color
Fixing layout / reflected ceiling
Simulation daylight/combine/night
Acoustic
condit
ions
Site analysis-Indoor & Outdoor
Traffic noise
Buffering
Critical Spaces
Calculation RT / STC
Total
2
Top Related