1. THE CHALLENGE
2. SOLUTION
3. CABLES SUPPLIED
4. VALUE ADDITION
The Challenge
Power cables to draw power from their captive power plants.
Power cables to transmit power from the captive power plant to internal substations.
Power cables to supply power from the internal substations to individual machines.
Cables to cater to the control applications in the different machines, conveyor belts and chlorine plant.
Instrumentation cables to establish efficient communication between control panels and system units.
The Lapp Solution
High current carrying cables for heavy duty power transmission.
Cables to provide protection against high level of mechanical stress.
Flexible cables for stressful operations.
Cables Supplied
Time irrespective customer support
Cable longevity ensured
Value Addition Click icon to add picture
Sample image
THANK YOU FOR YOUR ATTENTION