RESIDENTIAL | COMMERCIAL/INDUSTRIAL | MUNICIPALITY
Waterline Renewal Technologies (WRT) is a leading provider of engineered products used in the trenchless rehabilitation of wastewater/stormwater infrastructure for municipal, commercial, industrial and residential applications and provides a unique portfolio of products and services through its brands AP/M Permaform, ConShield Technologies, LMK Technologies, Moray, and Perma-Liner Industries. We provide trenchless rehabilitation of degraded infrastructure through differentiated products, technologies and services. WRT’s pioneering approach to trenchless rehabilitation is changing how municipal, commercial, industrial and residential sectors repair their water and wastewater infrastructure.
UNDERGROUND SOLUTIONS YOU CAN RELY ON,
BRANDS YOU CAN TRUST
Address: 1415 W. 22nd St., Tower Floor, Oak Brook, IL 60523Phone: 847.457.1810 | Email: info@waterlinerenewaltechnologies.comwaterlinerenewaltechnologies.com
PRODUCTS & TECHNOLOGIESCONNECTION LINERS A one piece main-to-lateral CIPP connection liner that ensures a watertight system
LATERAL LINERS CIPP liners for lateral pipes composed of felt tubes impregnated with resin
ADDITIVES Liquid additives that prevent bacterial corrosion of concrete in highly corrosive sewer environments
SEALS Molded engineered hydrophilic gasket systems that provide verifiable non-leaking seals placed in strategic locations
MAINLINE LINERS CIPP liners for mainlines composed of felt tubes impregnated with resin
INSTALLATION EQUIPMENT Deep portfolio of equipment designed to effectively and efficiently rehabilitate sewer laterals, mainlines, maholes, and pipes
TRAILERS Fully equipped turn-key trailers configured in-house to meet the needs of installation crews in municipal and residential CIPP and spray-on coating applications
LININGS Cementitious spray-on coatings for manholes, sanitary sewers, WWTPs, and stormwater pipes
RESIDENTIAL | COMMERCIAL/INDUSTRIAL | MUNICIPALITY
PERMA-LATERAL LINING SYSTEM VS.DIG AND REPLACE METHOD
UNDERGROUND SOLUTIONS YOU CAN RELY ON,
BRANDS YOU CAN TRUST
Address: 1415 W. 22nd St., Tower Floor, Oak Brook, IL 60523Phone: 847.457.1810 | Email: info@waterlinerenewaltechnologies.comwaterlinerenewaltechnologies.com
PROJECT:4” House Lateral
LENGTH:60 Feet
PIPE TYPE:Clay
DESCRIPTION: Lateral is infiltrated with roots and water. The lateral has several blockages each year due to root problems. The roots have caused the pipe to crack and possibly collapse. The pipe exits the home under a driveway and sidewalk. The pipe connects to the main under the center of the street. The pipe depth is 4’ deep at the outside wall of the house and continues to a depth of 15 feet at the main sewer line connection. The sewer lateral pipe is next to a water and gas line. The driveway is concrete as well as the sidewalk. The street is blacktop.
HERE IS THE COST DIFFERENCE:
Project Materials, Labor & Equip. Cost Approx. $1,923.20 $3,355.00Average Customer Pays $4,500.00 to $7,000.00 $4,500.00 to $7,000.00Average Profit 55% to 75% Profit 30% to 40%Days on Site less than 1 day 3 days plusHomeowner satisfaction 100% always a return visit neededSpecializeda System Trenchless Technology Everyone can dig - competitiveInstallation of Product Always the same Always Different
DESCRIPTION PERMA-LATERAL DIG AND REPLACEBack Hoe and Operator $00.00 2 days @ $450.00
Laborers 3 @ $40.00 per hour / 4 hours 2 @$40.00 per hour / 2 days
Pipe Disposal $00.00 $100.00
Concrete sawing $00.00 $50.00 per hour / 3 hoursa
Blacktop sawing $00.00 $50.00 per hour / 2 hours
Blacktop and Concrete Disposal $00.00 $100.00
New PVC Pipe Materials to Install $00.00 $150.00
Concrete Materials $00.00 $75.00
Blacktop Materials $00.00 $200.00 plus base and compaction
Shoring for hole $00.00 $300.00
Lining Material@ $15.72 Per Ft $943.20 $00.00
CIPP Pipelining Equipment $500.00 $00.00
Installs per day up to 5 laterals a day 1 every two days
Inconvenience Minimal 2 days
Lateral out of service 3 hours 2 days (est)
Other Utility Service Damage None Possibly water and gas line damage
Street Reconstruction None City may not want street patched
Concrete Driveway and Sidewalk None The patch in concrete will not match old concrete
Customer Satisfaction 100% Driveway Mis-Color, Landscape Damage
Days Onsite less than 1 day 2 days plus any corrections to driveway & landscape
Street Road Detour None City Requires Proper Signage / Expense / Liability
Liability Minimal Road, Gas Line, Water Main, Major Liability