BIKERALEIGH PLAN | UPDATE
PRIORITIZATION AND TEN-YEAR PLAN 4-1
This chapter features a brief summary of the prioritization process and the selection of priority projects to focus on over a ten year time frame. These projects are mostly Separated Bikeways and Neighborhood Bikeways that, along with the Capital Area Greenway System, form the All Ages and Abilities network. They are selected based on their prioritization ranking, their ability to connect key destinations and complement existing and programmed facilities, their ability to be built within existing curbs, as well input from the public, city staff, and the project Steering Committee.
Maps at the end of this chapter articulate a vision of what bicycle infrastructure is likely to become in the City of Raleigh within the next decade. In addition to the priority projects recommended by this plan, the maps include existing on-street bicycle facilities, bicycle facilities to be provided by currently programmed street projects, the existing network of greenway trails, and the anticipated next phase of greenway trail construction. These also show priorities from the 2016 update that are not able to fit between existing curbs and need additional resources.
PRIORITIZATION PROCESSThe recommended long-term network described in Chapter 3 was divided into segments and each segment was then ranked by six weighted criteria. The prioritization matrix found in Appendix C provides full results of this exercise.
Prioritization and Ten-Year PlanBikeRaleigh Plan
Vision: “Raleigh is a
place where people of
all ages and abilities
bicycle comfortably
and safely for
transportation, fitness,
and enjoyment. The
BikeRaleigh network
is integrated into the
transportation system
to connect people to
where they live, work,
play, and learn.”
PRIORITIZATION CRITERIA AND WEIGHTING
PARK AND GREENWAY ACCESS (6)
POPULATION SERVED (4)
LEVEL OF REPORTED BIKE CRASHES (4)
AREAS CURRENTLY WITH LOW BICYCLE FACILITY SERVICE (3)
ACCESS TO DESTINATIONS (3)
NEED AND EQUITY (2)
*Criteria weights are in parenthesis, with higher numbers representing higher weights.
BIKERALEIGH PLAN | UPDATE
4-2 PRIORITIZATION AND TEN-YEAR PLAN
Projects in the Ten Year Priority Plan were selected from high-ranking projects by city staff, consultants, and Steering Committee members. Many of these projects implement portions of the recently adopted Downtown Plan or will support the planned bike share system. Some projects implement portions of other plans nearing completion, including the Six Forks Corridor Study, the Southern Gateway Corridor Study, and the Cameron Village - Hillsborough Street Small Area Plans. Some projects also serve newly-acquired Dix park.
There are projects that earn high scores in the prioritization matrix, but for which there is no clear implementation path in the five to ten year time frame. In these cases, this plan recommends that the result be used to inform greenway trail prioritization. The goal is to prioritize greenway trails and off-street connectors serving areas where on-street facilities are not feasible.
The projects in the Ten Year Priority Plan will require significant planning, design, and community involvement in order to fully implement. The BikeRaleigh Plan Update is a big-picture, city-wide plan which cannot precisely determine project alternatives or scope. In some cases, the street alignments or project endpoints are likely to change through the implementation process.
Prioritization Matrix Results
Committee/City Staff/Consultant Input
Ten Year Priority Plan
Detailed Feasibility and Scoping
Neighborhood Involvement
Detailed Design
Construction
Evaluation
BikeR
aleigh
Plan U
pd
ateF
uture Steps fo
r E
ach Pro
ject
Additional details are in Chapter 8 on Future Steps for each project.
Project list above is in no particular priority order.
Table 4.1: Ten year priority list (Greenways)GREENWAY From To Miles
1.77G1 CRABTREE GREENWAY LINDSAY DR DURALAEIGH
1.04G2 LASSITER MILL GAP NORTHAMPTON CURRENT PAVED CRABTREE GREENWAY
0.29G3 ROSENGARTEN TRAIL S SAUNDERS CABARRUS
0.12G4 WALNUT CREEK GREENWAY CENTENNIAL CAMPUS GREENWAY CONNECTION
TRAILWOOD
0.79G5 TRENTON ROAD SIDEPATH REEDY CREEK TRAIL AT UMSTEAD EAST ENTRANCE
I-40 BRIDGE
0.39STRUCTURE 106 REROUTE CAPTIAL CRABTREE GREENWAY
4.4Total
Table 4.1: Ten year priority list (Greenways)GREENWAY From To Miles
1.77G1 CRABTREE GREENWAY LINDSAY DR DURALAEIGH
1.04G2 LASSITER MILL GAP NORTHAMPTON CURRENT PAVED CRABTREE GREENWAY
0.29G3 ROSENGARTEN TRAIL S SAUNDERS CABARRUS
0.12G4 WALNUT CREEK GREENWAY CENTENNIAL CAMPUS GREENWAY CONNECTION
TRAILWOOD
0.79G5 TRENTON ROAD SIDEPATH REEDY CREEK TRAIL AT UMSTEAD EAST ENTRANCE
I-40 BRIDGE
0.39STRUCTURE 106 REROUTE CAPTIAL CRABTREE GREENWAY
4.4Total
BIKERALEIGH PLAN | UPDATE
PRIORITIZATION AND TEN-YEAR PLAN 4-3
Table 4.2: Ten year priority list (Separated Bikeways)SEPARATED From To Miles
0.48FAIRCLOTH HILLSBOROUGH WADE
0.05GARNER ROAD BIKEWAY CONNECTION SAINTS PETERSON
0.35GORMAN LIGON CLARK
0.51S1 SOUTH STATE STREET BIKEWAY PETERSON BUNCHE
0.53S2 DOWNTOWN NORTH-SOUTH GREENWAY CONNECTOR PH2
NORTH PEACE
0.83S3 DOWNTOWN EAST-WEST GREENWAY CONNECTOR
WEST EAST
0.41W MORGAN ST MARYS DAWSON
0.02WADE TO CAPITAL RAMP CROSSING IMPROVEMENT
WEST WADE
0.55WEST STREET NORTH PEACE WADE
Total MilesPercent of Category
3.7316.04%
SIDEPATH UPDATE/REHAB From To Miles2.67AVENT FERRY SIDEPATH REHAB WESTERN LAKE JOHNSON PARK
9.46FALLS OF NEUSE SIDEPATH REHAB OLD WAKE FOREST NEUSE RIVER TRAIL
0.98GLENWOOD SIDEPATH REHAB/IMPROVEMENTS
REMBERT DRIVEWAY JUST WEST OF CREEDMOOR
0.85LYNN SIDEPATH REHAB BROOKEMEADE NORTH HILLS DR
0.14NEWTON RD SIDEPATH SIX FORKS EAST MINE FORK GREENWAY
0.44OLD FALLS CONNECTOR KEITH STORE NC 98
2.13ROCK QUARRY SIDEPATH REHAB MLK EAST OF NEW BIRCH
0.85ROCKY BRANCH SIDEPATH CABARRUS PULLEN
2.01WESTERN BLVD SIDEPATH REHAB GORMAN JONES FRANKLIN
Total MilesPercent of Category
19.5383.96%
23.26Total
BIKERALEIGH PLAN | UPDATE
4-4 PRIORITIZATION AND TEN-YEAR PLAN
WALNUTCREEK
GREENWAY
NRT D
ETOU
RCO
NNEC
TION
HARDIMONT
TRAWICK
ASHECROSSINGAT WESTERN
EDWARDS MILL
S8 SA
INT
MARY
S WAD
ECR
OSSIN
G
RIDG
E ROA
D GA
P
S6 AT
LANT
IC AV
E
GRAY
LYN
FAIRVIEW
FAIRV
IEW-CA
PITAL
ACCE
SSRO
AD
WALN
UT CR
EEK
AT JO
NES
FRAN
KLIN
-440
B1 GR
EEN R
OAD B
IKE L
ANES
LAKE W
HEELER
AT CA
ROLIN
APIN
ES
LANE LANE ST
POOLE ROADRESURFACING
S5 NORTHBOUNDARY
STREET
G2 LASSITER MILL GAP
U-4437 GRADE
SEPARATION OF
NCRR & BLUE RIDGE
B-513
0 AVE
NTFER
RY BR
IDGE
BLUE
RIDG
E ROA
DPE
D BR
IDGE
OVER
WAD
E AVE
CAROLINAPINES
G1 CRABTREE GREENWAY
EDWAR
DS MILL
EBEN
EZER
CHUR
CHNO
RTH C
ONNE
CTOR
G5 TREN
TON
ROAD
SIDEPA
TH
S6 AT
LANT
ICAV
ENUE
IMPR
OVEM
ENTS
CAROLINA PINESIMPROVEMENTS
EBEN
EZER
CHUR
CH
BARW
ELL RO
AD W
IDENIN
G
OLD WAKE
FOREST ROAD
IMPROVEMENT PROJ
POOLE ROAD WIDENING
N8 MARSH CREEK-TRAWICK
STREET IMPROVEMENTS
TRYON ROAD PART C
YONKERS ROAD CIP
S7-SI
X FOR
KS
WEST
GARN
ER RO
ADBI
KEWA
YCO
NNEC
TION
S3 DOWNTOWNEAST-WEST GREENWAY
CONNECTOR
FALLS OF NEUSE
SIDEPATH REHAB
G4 WALNUT
CREEK
GREENWAY
ROCK QUARRYSIDEPATH
REHAB
NEWTON RDSIDEPATH
G2 LA
SSITE
RMI
LL GA
P
G3 ROSENGARTENGREENWAY TRAIL
FALL
S OF N
EUSE
SIDEP
ATH
REHA
BSTR
UCTU
RE10
6 RER
OUTE
G2 LASSITERMILL GAP
GORM
AN
WMORGAN
OLD FA
LLSCO
NNECT
OR
FAIRC
LOTH
FALLS OF NEUSE
SIDEPATH REHAB
S1 SOUTH
STATE STREET
BIKEWAY
G1 CRABTREE GREENWAY
WEST
STRE
ETNO
RTH
AVENT FERRY
SIDEPATH
REHAB
G5 TR
ENTO
NRO
AD SI
DEPA
TH
ROCKYBRANCHSIDEPATH
LYNN SIDEPATH REHAB
GLENWOOD SIDEPATH
REHAB/IMPROVEMENTS
FALL
S OF N
EUSE
SIDEPA
TH RE
HAB
WESTERN BLVDSIDEPATH REHAB
City of Raleigh, State of North Carolina DOT, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA
¯
4Miles
2020 BikeRaleigh Prioity UpdatesProjects for Implementation in the Next DecadePlan2020
GREENWAYSEPARATED<all other values>
Existing and Planned Bicycle FacilitiesSTATUS
Facility is Complete and Meets Plan SpecFacility Exists but Does Not Conform To Plan10 YEAR PRIORITY PROJECTS AND UPGRADESAll Other Values5 YEAR PRIORITY-CURRENT CAPITAL PROJECTS
Generated by City of Raleigh Transportation Planning on 11/4/2020
Map 4.1: Ten Year Priority Plan: Separated Bikeways + Greenways
BIKERALEIGH PLAN | UPDATE
PRIORITIZATION AND TEN-YEAR PLAN 4-5
TABLE 4.3: Ten Year Priority List (Conventional Bike Lanes)BIKE LANE From To Miles
0.35AVENT FERRY CLIMING LANE END B-5130 OLD AVENT FERRY
1.43B1 GREEN ROAD BIKE LANES NEW HOPE CHRUCH SPRING FOREST
0.33B2 LINEBERRY JOANNE LAKE WHEELER
0.73B6 WHITAKER MILL BIKE LANES REAVES WAKE FOREST ROAD
0.27BUCK JONES CLIMBING LANE FARM GATE RD I-40
0.08BUCK JONES INTERIM INTERSECTION JONES FRANKLIN XEBEC WAY
0.66DUNN RD FALLS OF NEUSE FALLS RIVER AVE
0.21FAIRVIEW AYCOCK CAPITAL
0.42HARDIMONT NORTH HILLS SIX FORKS
0.09HOKE ST BLOODWORTH PERSON
1.28MILBURNIE RALEIGH SHANTA
0.37PLEASANT VALLEY DURALEIGH GLENWOOD
0.15RALEIGH BLVD GAP NEW BERN AVE POOLE RD
0.13RIDGE ROAD GAP PHYLLIS WADE
0.38S5 JOHNSON ST HARRINGTON WEST
0.12S8 SAINT MARYS WADE CROSSING NICHOLS WADE
0.13SHANTA DR MILBURNIE NEW BERN AVE
0.13WALNUT CREEK AT ELIZA POOL PARK WATER WORKS GILBERT
0.15WALNUT CREEK ON ROAD CONNECTION AT POOL PARK
S WILMINGTON WATER WORKS
7.41Total
BIKERALEIGH PLAN | UPDATE
4-6 PRIORITIZATION AND TEN-YEAR PLAN
FAYETT
EVILLE
RD
STRUC
TURE
106 R
EROU
TE
YONK
ERS
ROAD
CIP
NRT D
ETOU
RCO
NNEC
TION
TRAWICK
ASHE CROSSINGAT WESTERN
EDWARDS MILL
G4 WALNUT
CREEK
GREENWAY
S6 AT
LANT
IC AV
E
G3 ROSENGARTENGREENWAY TRAIL
GRAY
LYN
WALN
UT CR
EEK
AT JO
NES
FRAN
KLIN
-440
LAKE W
HEELER
AT CA
ROLIN
APIN
ES
G2 LASSITER MILL GAP
LANE
POOLE ROADRESURFACING
GORM
AN
U-4437 GRADE
SEPARATION OF
NCRR & BLUE RIDGE
B-5130 AVENT
FERRY BRIDGE
G1 CRABTREE GREENWAY
OLD FA
LLSCO
NNECT
OR
BLUE
RIDG
E ROA
DPE
D BR
IDGE
OVE
RWA
DE AV
E
CAROLINAPINES
EDWAR
DS MILL
EBEN
EZER
CHUR
CHNO
RTH C
ONNE
CTOR
G5 TR
ENTO
NRO
AD SI
DEPAT
H S6 AT
LANT
ICAV
ENUE
IMPR
OVEM
ENTS
CAROLINA PINESIMPROVEMENTS
EBEN
EZER
CHUR
CH
BARW
ELL RO
AD W
IDENIN
G
OLD WAKE
FOREST ROAD
IMPROVEMENT PROJ
POOLE ROAD WIDENING
B1 G
REEN
ROAD BIKE
LANE
S
N8 MARSH CREEK-TRAWICK
STREET IMPROVEMENTS
TRYON ROAD PART C
YONKERS ROAD CIP
S7-SI
X FOR
KS
HARDIMONT
N4 INGRAM DR
POWELL
INTERIMBUCK JONESINTERIM
INTERSECTION
HOKE ST
S5 JOHNSON ST
S8 SA
INT
MARY
S WAD
ECR
OSSIN
G
WALNUT CREEK
AT ELIZA
POOL PARK
MILBURNIESHANTA DR
RIDG
E ROA
D GA
P N6 CROSSTOWNBIKEWAY EAST
RALE
IGH
BLVD
GAP
NORTHBROOK DR
BERYL INTERIM
LITTLE JOHN
ROAD UPGRADE
FAIRVIEW
FAIRV
IEW-CA
PITAL
ACCE
SS RO
AD
HUTTONLIGONSHARROWS
BUCK JONES
CLIMBIN
G LANE
LANE ST
MAYWOODEAST
N1 HADLEYBIKEWAY
B2 LINEBERRY
N4HU
NTLE
IGH
S5 NORTHBOUNDARY
STREET
LLL CONNECTOR
AVEN
T FER
RYCL
IMIN
G LA
NE
PLEASANTVALLEY
HARDIMONT
PETERSON STREET
NEIGHBORHOODBIKEWAY
STONYBROOK
NEIGHBORHOOD
BIKEWAY
N1 DA
NDRID
GEBIK
EWAYN2 SIERRA
DUNN RD
B6 WHITAKERMILL BIKE
LANES
ROSE
LANE
NEIG
HBOR
HOOD
BIKE
WAY
B1 GR
EEN R
OAD B
IKE L
ANES
WHITE
OAK
N6 WESTERNHALF CROSSTOWN
BIKEWAY
City of Raleigh, State of North Carolina DOT, Esri, HERE, Garmin, SafeGraph, METI/NASA, USGS, EPA, NPS, USDA
¯
4.5Miles
Generated by City of Raleigh Transportation Planning on 11/5/2020
2020 BikeRaleigh Priority Updates10 YEAR In mixed trafficPlan2020
CONVENTIONAL BIKE LANENEIGHBORHOOD BIKEWAY
Existing and Planned Bicycle FacilitiesOther Existing and Planned Bike Facilities
Facility is Complete and Meets Plan SpecFacility Exists but Does Not Conform To Plan10 YEAR PRIORITY PROJECTS AND UPGRADES5 YEAR PRIORITY-CURRENT CAPITAL PROJECTS<all other values>
Map 4.2: Ten Year Priority Plan: Bicycle Lanes + Neighborhood Bikeways
BIKERALEIGH PLAN | UPDATE
PRIORITIZATION AND TEN-YEAR PLAN 4-7
Table 4.4: Ten year priority list (Neighborhood Bikeways)NEIGHBORHOOD BIKEWAY From To Miles
1.41BERYL INTERIM HILLSBOROUGH POWELL
0.22FAIRVIEW-CAPITAL ACCESS ROAD CAPITAL FAIRVIEW
0.26HUTTON LIGON SHARROWS NCSU BOUNDARY BLUE RIDGE
0.28LANE ST WILMINGTON BLOODWORTH
0.72LITTLE JOHN ROAD UPGRADE DEAD END LITTLE JOHN CARLISLE
0.68LEESVILLE LAKE LYNN CONNECTOR LEESVILLE RD LAKE LYNN GREENWAY
0.31MAYWOOD EAST S SAUNDERS FAYETTEVILLE
0.56N1 DANDRIDGE BIKEWAY BUNCHE CROSS LINK
0.31N1 HADLEY BIKEWAY DANDRIDGE CROSS LINK
0.27N13 JOHNSON ST ST MARYS CLARK
1.3N2 SIERRA LINEBERRY CAROLINA PINES
0.33N4 HUNTLEIGH INGRAM NEW HOPE CHURCH
0.51N4 INGRAM DR ATLANTIC BRENTWOOD
2.08N6 CROSSTOWN BIKEWAY EAST WHITAKER MILL OBERLIN
1.78N6 WESTERN HALF CROSSTOWN BIKEWAY RIDGE OBERLIN
0.31N7 BLOODWORTH-SAINTS NBHD BIKEWAY HOKE GARNER RD
1.01NORTHBROOK DR NORTH HILLS SIX FORKS
0.4PETERSON STREET NEIGHBORHOOD BIKEWAY GARNER RD S. STATE
0.28POWELL INTERIM BERYL WESTERN
0.83ROSE LANE NEIGHBORHOOD BIKEWAY POOLE WALNUT CREEK GREENWAY
0.33S5 NORTH BOUNDARY STREET PERSON ST WATAUGA
0.51STONYBROOK NEIGHBORHOOD BIKEWAY BRENTWOOD TRAWICK
0.24WATAUGA ST NEIGHBORHOOD BIKEWAY OAKWOOD BOUNDARY
1.34WHITE OAK LASSITER MILL OXFORD16.27Total
BIKERALEIGH PLAN | UPDATE
4-8 PRIORITIZATION AND TEN-YEAR PLAN
TEN YEAR PRIORITY PLAN The maps on the following pages feature the top 29 priority projects, which are a combination of separated bikeways, neighborhood bikeways, bicycle lanes and greenway trails. Additional facilities will also be implemented as opportunities arise, such as a resurfacing project or major roadway project. The maps also include existing and programmed facilities.
TABLE 4-4: TEN YEAR PRIORITY PLAN (SHOWN IN MILES)
Facility Type Existing Facilities
Programmed Projects
Priority Projects
Total Network
Paved Greenway Trail
107 3 0 110
Separated Bikeway
21 10 13 45
Neighborhood Bikeway
0 N/A 43 43
Main Street Bikeway and Sharrows
27 1 N/A 28
Bicycle Lane, including climbing lanes
32 11 9 52
Total 187 25 65 278
BIKERALEIGH PLAN | UPDATE
PRIORITIZATION AND TEN-YEAR PLAN 4-9
Map key of the seven sector maps detailing the Ten Year Priority Plan on pages 4-9 through 4-15.
NORTH SECTOR(PAGE 4-14)
NORTH EAST
SECTOR(PAGE 4-15)
EAST SECTOR(PAGE 4-10)
SOUTHEAST SECTOR(PAGE 4-11)
SOUTHWEST SECTOR(PAGE 4-12)
NORTH WEST
SECTOR(PAGE 4-13)
DOWNTOWN ZOOM
(PAGE 4-9)
MAP KEY FOR THE FOLLOWING PAGES