INDUSTRIAL TRAINING (COEB314)7TH MARCH 2016 – 29TH MAY 2016
ABUDZARWAN BIN AMIR ALIEE093532
MUHAMMAD AL FIKRI MARZUKIEE093492
BACHELOR OF ELECTRICAL AND ELECTRONICS ENGINEERING (HONS.)
VISITING LECTURER: ASSOC. PROF. DR. GOH SU MEI
Objective of Industrial Training• To experience and understand the real life situation in
industrial organization and environment.
• To build relationship and teamwork within workplace.
• Encourage students to be more independent in dealing with people and problem.
• To apply their theoretical knowledge with application in the industry.
Company Profile
• Name of Company : Norangkasa Enterprise Sdn Bhd
• Registration Office : No 78-3, Jalan Radin Tengah,
Bandar Baru Seri Petaling, Sungai Besi,
57000 Kuala Lumpur.
• Share Holders : 100% Bumiputera
• Date of Incorporation : 29th June 1978
• Services/Products : Electrical Contractor (Gred G7)
• Projects that had been conducted:
1. Traffic Light Installation at Putrajaya – 2003
2. Aerodrome Ground Lighting at KLIA – 2004
3. Electrical Installation, PA Systems and CCTV Installation at Penjara Kajang – 2004
4. Maintenance work for straight lightings at Putrajaya – 2009-2011
5. Design, Supply and Installation of LED Lighting and Boom Box Equipment for all elevated stations in Mass Rapid Transit (MRT) project– 2012-present
ChairmanDato’ Ir.
Mohamad Shokri Bin Abdullah
Project Director
Mr. Mohamad Asri Bin Harun
Project Manager
Syed Alfaizal
Project Engineer
Mohd SyabilNur Hidayah
Project CoordinatorMohd ZakriMohd Faizal
Project Supervisor
Budiman DanrangMohd Hisham
HussainYusri Md Yunus
Project Engineer
Muhammad Adha
Project Coordinator
Wong Guan Sang (Chargeman BO)
Mohd Izham (Chargeman A4)
Project Supervisor
Yusaini HakimJalani Malik
V.Vijakumaran
Contract ManagerIr. Ahmad
Faizul
Office ClerkYusnaini
Adminstrative DirectorMrs. Siti
Sapura Binti Abdullah
Account Executive
Norrida Binti Daud
Organization Chart
MRT Contract Hierarchy
MRT Corporation(Project Owner)
MMC Gamuda(Project Delivery Partner)
Main Contractor(Work Project Contractor)
Norangkasa Enterprise(Designated Contractor)
Sub Contractor
Norangkasa Main Tender• DESIGN• SUPPLY• INSTALLATION• TEST & COMMISSIONING
FOR LED LIGHTING & LIGHTING BOOM BOX EQUIPMENT FOR ALL ELEVATED STATION EXCEPT UNDERGROUND
Training Assignment1. Site Visit
• Site evaluation (the end of month)• Monitor work progress by the sub-contractor• Check delivery order at site• Analyze the amount of infill panel refer to the drawing
2. Office• Completed the drawing for submission• Preparing document for interim progress claim
LED Lighting Types
3 types of LED light fixture are installed:a) LED Batten Light Fixture (42W and 25W)b) LED Downlight Fixture (13W)c) LED Façade Light Fixture (72W)
• Operation of LED Lighting System
BMS – Building Management System (Main control switch)SPD – Surge Protection Device (electric power supply network)
• Type of drawing:1. Lighting layout plan for concourse and platform2. Lighting layout plan with circuitry distribution for concourse and
platform3. Boom box structure detail for platform4. Lighting electrical services schematic diagram
• Step for drawing submission:
Advanced Check Print
Issued For Constructi
onShop
Drawing As Built
Safety, Health and Environmental Issues
• Take precautions and be sensitive about safety.• Asking before you touch anything on
site visit.• Chin straps are needed to be fastened
to the safety helmets to make sure that the helmet will not fall off.
Conclusion• Increase self confidence level, teamwork and make good
relationship between other employees.
• Expand technical knowledge and skills.
• Disclosure of industrial training can give a real working environment in preparation before graduating.