8/16/2019 Present Bangunan
1/12
MPP702: DESIGN ACRMVMPP702: DESIGN ACRMVSYSTEMSYSTEM
NON-RESIDENTAL BUILDINGNON-RESIDENTAL BUILDING
KLUANG DRIVING SCHOOL
Ahli:Muhamad S a!"a# $a%i&
Muhamad N'&ha(!a# Ra)hidAima# A&i
Aima# *a%imi Rahma#Muhd $ulhilmi Ya!id
8/16/2019 Present Bangunan
2/12
• TING+AT ,
8/16/2019 Present Bangunan
3/12
BIL. LOKASI KIRAAN BEBANHABA
1 KAUNTER PERTANYAAN 30’ x 30’ = 900’900’ x 80 = 72000 Btu/Hr
2 BILIK CERAMAH 1 20’ x 30’ = 600’600’ x 80 = 48000 Btu/Hr
3 BILIK CERAMAH 2 20’ x 30’ = 600’600’ x 80 = 48000 Btu/Hr
4 PEJABAT 1 30’ x 20’ = 600’600’ x 60 = 36000 Btu/Hr
5 PEJABAT 2 20’ x 40’ = 800’
800’x 60 = 48000 Btu/Hr
KIRAN BEBAN HABATINGKAT 1
8/16/2019 Present Bangunan
4/12
• TING+AT 2
8/16/2019 Present Bangunan
5/12
BIL. LOKASI KIRAAN BEBAN HABA
1 RUANG ISTIREHAT 50’ x 25’ = 1250’1250’ x 70 = 87500 Btu/Hr
2 BILIK MESYUARAT 20’ x 45’ = 900’900’ x 80 = 72000 Btu/Hr
3 SURAU 30’ x 20’ = 600’600’ x 80 = 48000 Btu/Hr
TINGKAT 2
8/16/2019 Present Bangunan
6/12
a/al' 3LOKASI LUAS (FT¹) BEBAN HABA BTU/HR
FAKTOR TOTAL GENAP
KAUNTERPERTANYAAN
900’ 80 72000 Btu/Hr 72000 Btu/Hr
BILIKCERAMAH 1
600’ 80 48000 Btu/Hr 48000 Btu/Hr
BILIKCERAMAH 2
600’ 80 48000 Btu/Hr 48000 Btu/Hr
PEJABAT 1
600’ 60 36000 Btu/Hr 36000 Btu/Hr
PEJABAT 2
800’ 60 48000 Btu/Hr 48000 Btu/Hr
RUANGISTIREHAT
1250’ 70 87500 Btu/Hr 87500 Btu/Hr
BILIKMESYUARAT
900’ 80 72000 Btu/Hr 72000 Btu/Hr
SURAU 600’ 80 48000 Btu/Hr 48000 Btu/Hr
8/16/2019 Present Bangunan
7/12
a/al' 3LOKASI JENIS
PERALATANBILANGAN UNIT
(NO.UNIT)KAPASITI PER
UNITHORSE POWER
KAUNTERPERTANYAAN
Air C ooled SplitDuct
1 (ACSD 1) 72000 Btu/Hr 8 Hp
BILIK CERAMAH1
Air C ooled SplitDuct
1(ACSD 1) 48000 Btu/Hr 5.5 Hp
BILIK CERAMAH2
Air C ooled SplitDuct
1(ACSD 1) 48000 Btu/Hr 5.5 Hp
PEJABAT 1
Split Unit Casset teType
1 (ACSU 1) 36000 Btu/Hr 4 Hp
PEJABAT 2
Air C ooled Split
Duct
1 (ACSD 1) 48000 Btu/Hr 5.5 Hp
RUANGISTIREHAT
Air C ooled SplitDuct
1 (ACSD 1) 87500 Btu/Hr 10 Hp
BILIKMESYUARAT
Air C ooled SplitDuct
1 (ACSD 1) 72000 Btu/Hr 8 Hp
SURAU
Air C ooled SplitDuct
1 (ACSD 1) 48000 Btu/Hr 5.5 Hp
8/16/2019 Present Bangunan
8/12
Air Cooled Split Duct
8/16/2019 Present Bangunan
9/12
Air Cooled Split Duct
8/16/2019 Present Bangunan
10/12
INDOOR UNIT FDYQ50DV1
FDYQ60DV1
FDYQ71LAV1
FDYQ100LAV1
FDYQ125LAV1
FDYQ140LBV1
FDYQ160LAV1
OUTDOOR UNIT RZQS50AV1 RZQS60AV1 RZQS71AV1 RZQS100AV1
RZQS125AV1
RZQS140AV1
RZQS160AV1
Rated Capacity Cool (kW) 5.1 6.0 7.1 10.0 12.5 14.0 16.0
Heat (kW) 6.0 7.0 7.5 12.5 15.0 16.5 18.0
Capacity Range Cool (kW) 3.2-5.6 3.2-6.0 3.2-8.0 5.0-11.2 5.7-14.0 6.2-15.5 7.3-16.3
Heat (kW) 3.5-7.0 3.5-8.0 3.5-9.0 5.1-12.8 6.0-16.2 6.2-18.0 7.3-18.2
Power Input(Rated)
Cool (kW) 1.50 1.71 2.05 2.62 3.68 4.13 4.92
Heat (kW) 1.62 2.09 1.89 3.02 3.79 4.29 4.72
E.E.R./C.O.P. C/H 3.40/3.70 3.51/3.35 3.46/3.96 3.82/4.14 3.40/3.96 3.39/3.85 3.25/3.81
Air Flow Rate(Rated)
l/s 370 400 566 814 840 1000 1120
Dimensions(HxWxD)
Indoor (mm) 300x1015x851 360x1188x869 360x1498x899 430x1498x943
Outdoor (mm) 770x900x320 990x940x320 1430x940x320
Power Supply V/HZ 1 Phase, 220-240V, 50Hz
CompressorType
Hermetically Sealed Swing Type Hermetically Sealed Scroll Type
Refrigerant R410A
RefrigerantPipe Size
Liq (mm) 6.4 (Flared) 9.5 (Flared)
Gas (mm) 12.7 (Flared) 15.9 (Flared)
Drain (mm) ID 25 / OD 32
8/16/2019 Present Bangunan
11/12
Ca)) // T .
8/16/2019 Present Bangunan
12/12
PENG*ARGAAN
A))alamualai%um4 %ami ) %um.ula# i# i#m # u a.%a# &i5ua# / &ima %a)ih % .ada. #) a&ah %ami iai/u E#3Sam)udi# Bi# A5dul
*amid a# m #d'&'# %ami m # ia.%a#/u a)a# i#i3 S lai# i/u 4 %ami i# i# m # u a.%a#/ &ima %a)ih % .ada &a%a# %ami a# /u&u/
m m5a#/u )a a da&i ) i % mudaha#%'m.u/ & da# i#/ / u#/u% m # ia.%a#/u a)a# i#i
Top Related