Recommendations
• Find that adopting a resolution in support of the California WaterFix and the California Eco Restore is exempt from the California Environmental Quality Act per Guidelines Section 15061 (b)(3); and
• Adopt a Resolution in support of the California WaterFix and California Eco Restore
2
Pasadena Water and Power
Sacramento - San Joaquin Delta
• Sacramento & San Joaquin Rivers form the Sacramento-San Joaquin Delta (“Delta”)> Wetland consisting of marshes,
levees, islands, and waterways
> Home to more than 500 plants & wildlife including the endangered delta smelt
> 1,150 square miles in area
> 1,100 miles of levees & 700 miles of waterways
> 4.9 million acre-feet (“MAF”) per year in water supplies to 25 million people & 3 million acres of agricultural land.
3
Pasadena Water and Power
Delta Major Hub of Water Exports
• South Delta diversion at the Clifton Court Forebay> Two large pumping plants> Harvey Banks for the SWP> Bill Jones for the CVP
1
Pasadena Water and Power
Delta Major Hub of Water Exports
• South Delta diversion at the Clifton Court Forebay> Two large pumping plants> Harvey Banks for the SWP> Bill Jones for the CVP
• Central Valley Project (“CVP”) > U.S. Bureau of Reclamation (“USBR”)> Constructed in the 1940s> 2.2 MAF/year for central California
agricultural & farm land
• State Water Project (“SWP”)> California Department of Water
Resources (“DWR”)> Constructed in the 1960s> 2.7 MAF/year for central & southern
California municipal and institutional> Conveyed via California Aqueduct
2
Pasadena Water and Power
Delta Issues
• Reverse Flows –Pumps redirect river flows> Entrain and trap fish
(endangered Delta Smelt)
> Introduce higher salinity
5
Pasadena Water and Power
Delta Issues
• Levee Vulnerability > Large seismic event and subsidence
may breach levees
> Re-direct flows and impact
downstream users
> Introduce chemicals & increased
turbidity
> Costly repairs
• Supply Reliability> Global warming & rising sea levels
6
Pasadena Water and Power
Water Delivery With and WithoutCalifornia WaterFix
4.70
3.70
5.00
1.200.84
1.21
0.00
1.00
2.00
3.00
4.00
5.00
6.00
Existing Conditions Future without CA WaterFix Future with CA WaterFix
Vo
lum
e (
MA
F)
Average Conveyance(1)
SWP & CVP Contractors Metropolitan Water District
(3)
(2)
(4)
(1) All deliveries assumed with 2025 climate change impacts.(2) Future scenarios analyzed under a range of outflow requirements & operating criteria.(3) Future without CA WaterFix ranged from 3.5 to 3.9 MAF.(4) Future with CA WaterFix ranged from 4.7 to 5.3 MAF.
(2)
360 TAF Reduction
(30%)
Pasadena Water and Power
California WaterFix
8
• 3 intakes and 34 miles north of Clifton Court Forebay> Each rated at 3,000 CFS
• Main Tunnels> Two tunnels, 40-foot diameter
and 30-miles in length
> Up to 150 feet below ground surface
• Schedule> Construction – 13 years
> Operational by mid-2030s
Pasadena Water and Power
California WaterFix Benefits
9
• Dual conveyance> Provides operational flexibility
> Allows for operations in a dynamic fishery environment
> Diversion of excess flood flows for dry-year storage & emergencies
• Reduce risks for climate change> North intakes are at a higher elevation
• Improved flow patterns in the Delta> Reduced diversion in the south Delta which lessens reverse flows
> Reduce risk of fish entrainment
• Reduce seismic and subsidence risks> Tunnels are reinforced & below grade
• Improved water quality> Lower total dissolved solids, salinity & bromide
Pasadena Water and Power
California Eco Restore
10
• Restore and protect +30,000 acres
of Delta habitat by 2020> Restore floodplains, tidal habitat, and aquatic and riparian habitat
• Work in progress:> Restored 1,900 acres of habitat
> 3,900 acres are under construction & 23,200 acres under
permitting
> Restored 1.2 miles of aquatic waterways & planning and permitting
5.5 miles
• Planning & implementation cost $300 million> Funded primarily by CVP and SWP contractors
Pasadena Water and Power
California WaterFix Cost
• Capital cost at $16.7 billion (2017 dollars)> Contingency of 36% or $3.7 billion
> $401 million in capital mitigation
• Operation, maintenance, and mitigation cost> $64.4 million in 2033 (2017 dollars)
> Facilities operational by 2033
• SWP contractors’ cost share at 55%> Negotiating with CVP contractors on cost share
• Metropolitan Water District (“MWD”) is the largest SWP contractor with 45.8% rights> 5 of 29 SWP contractors will not benefit from California WaterFix
> MWD’s cost share ̴ 47.1%
Pasadena Water and Power
California WaterFix Cost
Costs are in 2017 Dollars Interest Rate Scenario (Term 40 Years)
Description 4% 6% 8%
Total Capital & Mitigation Costs $16.7 Billion $16.7 Billion $16.7 Billion
Total SWP Annual Financing and O&M
Cost at 55% in 2033$438 Million $567 Million $709 Million
MWD Annual Cost Share at 47% in 2033 $207 Million $268 Million $334 Million
MWD Annual Volumetric Sales
(Million Acre-Feet)1.7 1.7 1.7
MWD Unit Costs ($/Acre-Foot) $122 $157 $196
Water Usage for an Average Pasadena
Single Family Household (Billing Units)13
Pasadena Water and Power
$20$38
$63
$96
$133
$169
$206
$246 $249 $252 $255 $258 $261 $264 $267
$0.21
$0.40
$0.66
$1.01
$1.40
$1.78
$2.17
$2.59 $2.62 $2.65 $2.69 $2.72 $2.75 $2.78 $2.81
$0.26
$0.50
$0.83
$1.26
$1.75
$2.23
$2.71
$3.24 $3.28 $3.32 $3.36 $3.40 $3.44 $3.48 $3.52
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$0
$50
$100
$150
$200
$250
$300
$350
$400
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Mo
nth
ly C
os
t fo
r A
ve
rag
e S
F H
ou
se
ho
ld
MW
D C
os
t S
ha
re B
as
ed
on
6%
Sc
en
ari
o (
$ M
illi
on
)
Fiscal Year (July 1 to June 30)
MWD Cost Share
Monthly Cost for Average SF Household (MWD Sales of 1.7 MAF)
Monthly Cost for Average SF Household (MWD Sales of 1.36 MAF)
Cost for MWD & City’s Average Single Family Household
-- MWD’s cost share of the California WaterFix does not include other water related increases.
-- Monthly costs for an average single family household are based on a 60% imported MWD water.
~ 5% Increase for an Average Household Bill
Pasadena Water and Power
Alternative Resource Unit Costs
$0
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
$14,000
CentralizedProject
(SpreadingGrounds)
On-site DirectUse (Cisterns &
Rain Barrels)
On-SiteInfiltration (Rain
Gardens)
Sub-RegionalDirect Use (Park
Storage &Irrigation)
Sub-RegionalInfiltration
(NeighborhoodRecharge)
CommercialGreen Street
Co
st
per
Ac
re-F
oo
t
Stormwater Capture Alternatives
$1,100
$7,200
$3,300
$1,300$1,800
$900
Pasadena Water and Power
Alternative Resource Unit Costs
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
$4,500
Recycled Water (Irrigation) Recycled Water (Recharge) Seawater Desalination
Co
st
per
Ac
re-F
oo
t
Recycled Water & Desalination Alternatives
$1,500
$2,100
$2,400
Pasadena Water and Power
2011 WIRP Alternative Local Resources
$2,228
$5,950$6,532
$3,630$4,190
410
807
32 106
577
0
100
200
300
400
500
600
700
800
900
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
Satellite MBROn-Site Non-
Potable Reuse(Irrigation)
GraywaterReuse
(Irrigation)
ResidentialRain Barrel(Irrigation)
ResidentialRain Gardens
(Recharge)
Residential &Commercial
Infiltration Strip& Bioswale(Recharge)
Vo
lum
e (
AF
/Year)
Co
st
per
Ac
re-F
oo
t
Alternative Local Resources (Based on 2010 Cost)
Cost per AF Volume
Pasadena Water and Power
Large Scale Alternative Resources
$2,410
$960
$1,925
$1,660$1,800
$745
56
100
56
165
34
360
0
100
200
300
400
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
San DiegoClaude
"Bud" Lewis
OrangeCountyWater
District
PoseidonHuntington
Beach(Proposed)
MWDRegionalRecycled
Water(Proposed)*
San DiegoPure Water(Proposed)
MWD's Shareof California
WaterFix(Proposed)**
Cap
acit
y (
1,0
00 A
F/Y
ear)
Co
st
per
Ac
re-F
oo
t
Cost per AF Capacity
* Cost does not account for groundwater pumping.
**Cal WaterFix @ 6% Interest Scenario ($268M ÷ 360 TAF)
Pasadena Water and Power
Cost to Replace Full Delta Supply (MWD’s Share of 1,200 TAF)
$21.4
$9.2
$21.4$19.6
$42.4
$4.3
$0
$10
$20
$30
$40
$50
San DiegoClaude "Bud"
Lewis
Orange CountyWater District*
PoseidonHuntington
Beach(Proposed)
MWD RegionalRecycled Water
(Proposed)
San Diego PureWater
(Proposed)
MWD's Shareof California
WaterFix(Proposed)
Cap
ital
Co
st
($ B
illi
on
)
* Cost includes upgrade from 100 MGD to 130 MGD capacity.
Pasadena Water and Power
Risks of Not Moving Forward with California WaterFix
• Increasing regulatory constraints> Impacts to water operations result in reduced diversions
> In ability to capture storm flows for drought and emergency supplies
> Threatened fish species requiring higher outflows and decline in water supply
• Threats from earthquakes and subsidence> Levee failures and flooding
> Introduce higher turbidity and chemicals
> Costly repairs
• Climate change> Rising sea levels and introducing higher salinity into water supplies
19
Pasadena Water and Power
Risks of California WaterFix
• Political Risks> Strong opposition challenging the project
� Taking of additional water
� True cost of project & rate impacts
� Alternatives (conservation, recycled water, desalination, storm water capture)
> Potential litigation costs and project delays
• Construction Overruns> Very large and complex project
• Rate Impacts> MWD’s cost allocation is volumetric based
> PWP will always be dependent on MWD imported water
20
Pasadena Water and Power
Local & Regional Water Supply
• Pasadena’s water supply> Local groundwater & spreading credits ̴ 40%
> Imports from MWD ̴ 60%
• MWD’s imported water supply> SWP water provides ̴ 60%
• Preserving investments made in the SWP> City is 1.2% of MWD’s sales
> MWD has 45.8% of rights to the SWP water
• Water Integrated Resources Portfolio> Local resources (groundwater, conservation, recycled water,
stormwater)
• Southern California’s water supply> SWP water ̴ 30%
21
Pasadena Water and Power
California WaterFix - Conclusion
22
The threat to the water supply and reliability is
greater if no action is taken. California WaterFix
supports the 2009 Delta Reform Act co-equal
goals of improving the State’s water reliability
while protecting, enhancing, and restoring the
Delta ecosystem.