,JOTUN ·
o
tu
Pai ts
P INTING PROCEDURE
FOR
PLTU BABE LAN
CIK R NG LISTRINDO
EXTERN L
STEEL STRUCTURE
PROJECT
378 JTL 122015 1
December 2015
PAINTING PRO EDURE
Prepared y Jotun Indonesia
age
1
o
9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 2/9
otun Paints
P INTING
PROCEDURE
SECTION I P INT SPECIFIC TION
SECTION II GENER L SPECIFIC TION
SECTION l l SURF CE PREP R TION
SECTION IV PPLIC TION REQUIREMENT
SECTION V TECHNIC L
INSPECTION
SECTION VI STOR GE
SECTION VII
P INT
PPLIC TION PROCEDURE
378 JTL 122015
01
December 2015
PAINTING
PRO EDURE
Prepared
y Jotun Indones ia
age 2
o
9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 3/9
JOTUN
Jotun Pa ints
I
PAINT
SPECIFIC TION
Product description
Jotamastic 80
Futura
S
Application methods
Spray
Brush
Roller
This is a two
component
polyamine cured
epoxy mastic coating.
I t
is a surface
tolerant
high solids product. Specially designed
for
areas where
optimum
surface preparation is
not
possible
or
desired.
Can
be used
as
primer mid coat finish coat
or
as single coat
system in atmospheric and immersed
environments. Suitable
for
properly prepared
carbon steel and aged coating surfaces.
This is a
two
component chemically curing
aliphatic acrylic polyurethane coating. t has
a matt finish
with very
good gloss retention.
It is a high build product. To be used as
topcoat
in atmospheric environments.
Use
airless spray.
Recommended
for
stripe coating and small
areas. Care
must
be taken
to
achieve the
specified
dry
film thickness.
May be used For
Futura AS).
Care must
be
taken
to
achieve
the
specified
dry
film
thickness.
II GENER L SPECIFICATION
EXTERNAL:
Jotamastic 80 Red
Jotamastic 80 Grey
Futura
S
Total OFT
378 JTL 122015 01 December 2015
PAINTING
PRO EDURE
Prepared y Jotun Indones ia
1X
l
lX
7
µ
100
µ
50
µ
225 µ
Page
3 o 9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 4/9
)JOTUN
Jotun Paints
III
SURFACE PREPARATION
Surface preparation
with Sa
1
h:
1. All oil/grease, dust and other contaminant to surface shall be
remove/wash by fresh water with 250 bar pressure at nozzle. add
detergent if necessary to remove oil/grease)
2
All surfaces prepared
for
coating shall be abrasive blast clean in
accordance with the Swedish Standard SIS 05 5900 or the
following:
Comparative
Standard
Swedish
Standard
Sa
21 2
Japanese
Standard
lASH2
SSPC
Standard
SSPC-SP 1
3
The profile roughness achieved shall be between 30 - 85 microns
as measured using Keane Tator Surface Profile Comparator or 0
testex film and profile gauge.
4. Abrasive used for blast cleaning should be dry and free from dirt oil
and grease and suitable
for
procuring the standard of cleanliness
and profile specified.
5. After blast cleaning removes loose adhering dust, debris and
abrasive material from surface by use of high pressure
air
blow
should be free
of
oil and moisture).
378 JTL 122015
01
December 2015
PAINTING
PRO EDURE
Prepared
y
Jotun Indonesia age 4
o
9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 5/9
JOTUN
Jo
tu
n Paints
IV. PPLIC TION
R QUIR M NT
1.
The
temperature
of
the
substrate should be
minimum
10°C and
at
least 3°C above the dew point of the air, temperature and relative
humidity
measured in the vicinity
of
the substrate maximum 85 .
Good ventilation is usually required in confined areas
to
ensure proper
drying. The coating should not be exposed
to
oil, chemicals or
mechanical stress until cured
2 All Paint should
be
applied by airless spray except for stripe coats
where brush or roller should in general be used.
3. Efficient mechanical stir rers
or
power
mixer for
the correct mixing
of
paint
should
be
used 7 wooden stick or something like
that is strongly
forbidden to use.
4. Available air pressure and capacity for spray
equipment
should be at
least 5.5
kg/cm2
and 1.4 m3 90
100
Psi and 50 Cfm).
5 Airless spray equipment
must
be in good working order and be capable
of performing to be out put requirements defined
in
the Jotun data
sheets.
6.
It
is recommended
that
pump ratios
for
45: 1
or
greater.
7. Tips should be the size stipulated on the product datasheets or as
agreed with the Jotun paint representatives on site. Tips should not be
in a worn condition.
8. Only thinners and additives supplied by or acceptable to Jotun are
to
be used and they are not to exceed the quantity recommended. Only
solvents acceptable by Jotun are to be used for cleaning equipment.
9. Re-coating
time
must
be
follow
to
TDS. In case re-coating time
exceeding than TDS, more treatment prior
to
apply
next
coat shall
be
done contact your Technical advisor).
78 JTL
122 15
1
December 2 15
PAINTING
PRO EDURE
Prepared y Jotun Indonesia
Page
5 o 9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 6/9
JOTUN
Jotun Paints
V
TECHNIC LINSPECTION
1.
Dry film thickness: each coat
must
be checked when
the paint
is dry.
f
the dry film thickness is lower than owner s specification, build up
thickness must
be
done to achieve minimum OFT requirement.
2. After exposure and contaminated with the environment surface shall
be fresh water washed and prepare clean before any coating
application.
3.
f
the maximum re coating interval exceed, roughening of the surface
by sandpaper and or light abrasive sweeping is mandatory.
4. Note batch
number of
paint (Comp. A and B on the log book.
VI
STORAGE
All paint and thinner shall be kept closed in original, undamaged can
before use and stored under shelter, away from direct sunlight, to keep
the air temperature below 25 C is the best recommendation, Any paint
exceeding shelf life, gelled or in damage can shall not be used (contact
your Technical advisor)
378 JTL 122015 Ol
December
2015
PAINTING
PRO EDURE
Prepared y Jotun Indonesia Page 6 o 9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 7/9
Jotun Paints
VII. PAINT APPLICATION PROCEDURE
EXTERNAL:
Primer Coat : Jotamastic 80
1.
Flush equipment with JOTUN
THINNER
NO
17.
2 Stir Part A with an explosive-proof power
mixer
to an even
consistency.
3
Add Hardener Part B and continue to stir until even consistency.
Allow
to
stand
for
10 minutes.
4. Pot Life paint 2
Hours
at 23°C.
5. Apply a wet coat in even parallel passes. Overlap each pass 50 to
avoid bare areas pinholes or holidays.
6 Thinning normally not required. Thin only
for
workability with not
more than
10
by volume of
THINNER NO 17.
7. Apply a wet film thickness of 95 µ to provide
75
µ dry film
thickness.
8. Check thickness
of
dry
coating with a non-destructive
Dry
Film
Thickness Gauge
9. In confined areas, observe safety rules as in Industrial Hygiene
Safety Rules during Paint Application.
10. Clean all equipment with JOTUN THINNER NO 17 immediately
after use to prevent clogging of material in hose and spray
equipment.
11. Uncured paint should
not be
exposed to water, chemicals or
mechanical stress before the paint is fully cured.
12. Minimum re-coating interval must be follow to TDS 4 Hours
at
40°C, 10
hours at
23°C,
24 hours at 10°C .
378 JTL 122015 1
Decembe
2 15
PAINTING
PRO EDURE
Prepared
y
Jotun Indones ia age
7 of 9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 8/9
6JOTUN
Jotun
Paints
Intermediate
Coat
: Jotamastic 80
1. Flush equipment with JOTUN THINNER NO
17
2.
Stir
Part A with an explosive-proof power
mixer
to an
even
consistency.
3.
dd
Hardener Part B and continue to
stir
until even consistency.
Allow
to
stand
for 10 minutes.
4.
Pot Life paint 2 Hours at
23°C.
5.
Apply a
wet
coat in even parallel passes. Overlap each pass
50 to
avoid bare areas pinholes
or
holidays.
6. Thinning normally not required . Thin only
for
workability with
not
more than
10
by volume
of
THINNER NO
17
7.
Apply a wet film thickness
of
125 µ to provide 100 µ dry film
thickness.
8.
Check thickness
of
dry
coating with a non-destructive Dry Film
Thickness Gauge
9.
n
confined areas observe safety rules
as
in Industrial Hygiene
Safety Rules during Paint Application.
10.
Clean all equipment with
JOTUN THINNER NO 17
immediately
after
use
to
prevent clogging
of
material in hose and spray
equipment.
11. Uncured paint should
not
be
exposed to water chemicals
or
mechanical stress before
the
paint is fully cured .
12. Minimum re-coating interval
must
be follow to TDS
4 Hours at
40°C,
10 hours at 23°C,
24
hours at 10°C).
3 7 8
J TL 1 2 2 0 1 5 1
D e c e m be r 2 0 1 5
PAINTING
PRO EDURE
Prepared
y Jotun Indonesia
Page
8
o
9
7/23/2019 Painting Procedure Jotun
http://slidepdf.com/reader/full/painting-procedure-jotun 9/9
Jo
t
un Paints
Too
Coat: Futura
AS
1. Flush equipment's with
JOTUN
THINNER
NO 10.
2 Stir
Part A with
an
explosive-proof power
mixer to an
even
consistency.
3. Add Hardener Part B and continue to
stir
until even consistency.
4. Apply a wet coat in even parallel passes. Overlap each pass 50
to
avoid bare areas pinholes or holidays.
5 Thinning normally not required. Thin only
for
workability with
not
more than
10 by
volume of THINNER NO 10.
6 Apply a wet film thickness of
105
µ to provide 50 µ dry film
thickness.
7. Check thickness of dry coating with a non-destructive
Dry
Film
Thickness Gauge
8.
In
confined areas, observe safety rules
as
in Industrial Hygiene
Safety Rules during Paint Application.
9. Clean all equipment with JOTUN THINNER NO 10 immediately
after use to prevent clogging of material in hose and spray
equipment.
10. Uncured paint should
not be
exposed
to
water, chemicals or
mechanical stress before the paint
is
fully cured.
11. Minimum re-coating interval must be follow
to TDS
1,5
hours at
40°C, 3 hours at 23°C, 6 hours
at
10°C) .
378 JTL 122015 01
December
2015
PAINTING PRO EDURE
Prepared y Jotun Indonesia
age
9
o
9