This presentation has been prepared by OZ Minerals Limited (“OZ Minerals”) and consists of written materials/slides for a presentation concerning OZ Minerals. By reviewing/attending this presentation, you agree to be bound by the following conditions. No representation or warranty, express or implied, is made as to the fairness, accuracy, or completeness of the information, contained in the presentation or of the views, opinions and conclusions contained in this material. To the maximum extent permitted by law, OZ Minerals and its related bodies corporate and affiliates, and its respective directors, officers, employees, agents and advisers disclaim any liability (including, without limitation any liability arising from fault or negligence) for any loss or damage arising from any use of this material or its contents, including any error or omission there from, or otherwise arising in connection with it. Some statements in this presentation relate to the future and are forward looking statements. Such statements may include, but are not limited to, statements with regard to intention, capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside OZ Mineral’s control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation. Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements and intentions which speak only as at the date of the presentation. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, OZ Minerals does not undertake any obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in OZ Minerals expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based. Certain statistical and other information included in this presentation is sourced from publicly available third party sources and has not been independently verified.
OZ MINERALS • PAGE 3
HIGHLIGHTS
• Continued improvement in safety performance.
• 2012 annual production guidance achieved with 101,737t of copper and 140,746oz of gold at a C1 Cost of US$1.20/lb.
• Significant work underway to extend mine life at Prominent Hill with:
• 25% increase in Ankata underground Resource extending life by ~2 years
• Mine development of Malu underground commenced with Phase 1 of the decline complete and resource drilling identifying high grade stopes.
• Carrapateena Resource increases by 43% (at 0.7% Cu cut-off) to 292Mt.
• Exploration decline at Carrapateena to be fast tracked via Tunnel Boring Machine.
• The Khamsin prospect an exciting regional discovery 10km from Carrapateena.
• Significant waste movement in 2013, an investment in future production capacity, although with lower production and higher C1 costs compared with 2012.
OZ MINERALS • PAGE 4
SAFETY
• Continued improvement in total recordable injury frequency rate (TRIFR).
OZ Minerals Lost Time and Total Recordable Injury Frequency Rate 12 month moving average *
0
1
2
3
4
5
6
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
LTI F
requ
ency
Rat
e
TRI F
requ
ency
Rat
e
OZ Minerals TRIFR OZ Minerals LTIFR* Injuries per million man hours
OZ MINERALS • PAGE 5
PROMINENT HILL
• Further record tonnage movement at Prominent Hill, 2.5% increase on Q3 2012.
• 25% increase in Ankata Resource announced, extending its life by effectively two further years to ~2019. Resource drilling continues to show further upside.
• 2012 production in-line with stated guidance.
• 2013 production guidance of 90,000 to 95,000t of copper and 130,000 to 150,000oz of gold.
PROMINENT HILL PRODUCTION STATISTICS
SEP 12 QTR
DEC 12 QTR
2012 FULL YEAR
MINED (TONNES) MALU ORE 1,712,058 1,972,624 7,329,430
ANKATA ORE 130,441 199,560 424,965
WASTE 19,442,709 19,709,691 73,009,951
MINED GRADE MALU COPPER (%) 1.19 0.84 1.04
ANKATA COPPER (%) 3.19 2.73 2.89
GOLD (G/T) 0.49 0.57 0.52
ORE MILLED TONNES 2,433,836 2,328,597 9,648,324
MILLED GRADE COPPER (%) 1.18 1.12 1.19
GOLD (G/T) 0.60 0.57 0.60
RECOVERY COPPER (%) 89.6 89.1 88.9
GOLD (%) 75.4 75.0 76.0
COPPER CONCENTRATE PRODUCED
TONNES 49,633 45,934 202,355
CONTAINED METAL IN CONCENTRATES
COPPER (TONNES) 25,738 23,296 101,737
GOLD (OZ) 35,111 32,273 140,746
CONCENTRATE SOLD TONNES 42,737 59,953 209,384
OZ MINERALS • PAGE 6
70.00
80.00
90.00
100.00
110.00
120.00
130.00
140.00
150.00
160.00
117.9 (5.7) 9.0 (1.0) 18.3 12.4 150.9
Q3 Actual 2012 Commodity Price Volume(By Product)
Volume(Cost Driver)
Costs Volume(Payable Metal)
Q4 Actual 2012
(US c/lb)
Unit Cost C1 - Q3 2012 vs Q4 2012
C1 UNIT PRODUCTION COSTS
4.1% increase in gold price.
Reduction in tonnes milled and
gold grade.
Increased Ankata costs (Q3 only included 2 months from Ankata) and higher mining cost in-line with shift to basement waste.
Reduction in tonnes milled
and lower copper grades from Malu pit.
Ore inventory
credit offset by increased
tonnages from Ankata and Malu.
OZ MINERALS • PAGE 7
PROMINENT HILL - DESIGN OF FINAL PIT CROSS SECTION: NORTH-SOUTH
Stage 1
Stage 2
Stage 3
Stage 4
0m
100m
200m
300m
400m
500m
293m (Current level)
221m (Stage1)
353m (Stage3)
473m (Stage4)
333m (Stage2)
• 2012/2013 sees significant waste movement.
• 2013 strip ratio to average between 10 – 12.
The Malu open pit will ultimately be 180 metres deeper than current level.
OZ MINERALS • PAGE 8
2013 GUIDANCE
• Copper production will be below 2012 levels due to the geometry of the ore resource in relation to waste material, restricting copper ore mined.
• Copper production will be weighted towards the second half of 2013 as access to copper ore increases in combination with higher copper grades mined from Ankata.
• Gold production guidance is maintained at the same level as 2012.
Metric Guidance range
Copper production Tonnes 90,000 to 95,000
Gold production Ounces 130,000 to 150,000
C1 costs US$/lb 1.50 to 1.65
OZ MINERALS • PAGE 9
0.50
0.70
0.90
1.10
1.30
1.50
1.70
1.90
FY 2012US$1.20/lb
Payable Metal Higher mining costsinc. Ankata
GoldFx
FY 2013US$1.50-$1.65/lb*
US$/lb Unit Cost C1 -2012 vs. 2013
2013 C1 GUIDANCE
• Assumptions used for 2013 C1 cost estimates, Gold=US$1,850/oz. and A$/US$=1.01
Lower copper production - guidance of 90,000 to
95,000 tonnes
Gold pricing and foreign exchange
Higher mining costs including
the full year impact of Ankata
* Excluding the effect of adoption of accounting standard IFRIC 20.
OZ MINERALS • PAGE 10
PROMINENT HILL: UNDERGROUND DIAMOND DRILLING IN ANKATA (LONG SECTION)
• Resource drilling continues to show high grade mineralisation outside of Indicated Resource zone.
* Drill collars in diagram above represents significant intercepts shown in table.
Intercepts length weighted down-hole, >0.5% Cu with <2m down-hole of internal dilution, widths reported may not reflect true widths, please refer to the Prominent Hill 2012 Mineral Resource Explanatory and notes for further explanation on quality assurance.
Hole Number From (metres)
Interval (metres)
Copper (%)
PH12RD5612 167 7 1.7
PH12RD5612 189 7 5.4
PH12RD5639 155 53 3.7
PH12RD5640 129 42 3.9
PH12RD5641 118 10 2.1
PH12RD5641 131 7 1.1
Including
PH12RD5639 162 18 7.4
OZ MINERALS • PAGE 11
PROMINENT HILL: UNDERGROUND MINE DEVELOPMENT AT ANKATA (SECTIONAL VIEW)
Completed Development
2012 Resource (incremental increase over 2011 Resource)
2011 Resource
LEGEND
• A 25% increase in the 2012 Mineral Resources, effectively increasing its life by two years to ~2019.
• Resource drilling continues to show high grade intercepts outside of the current stope area.
OZ MINERALS • PAGE 12
PROMINENT HILL: (CROSS SECTION) MALU DECLINE & DRILLING UPDATE
• Phase 1 of Malu Decline completed in Q4 2012.
Q4 Malu /Kalaya underground drilling
OZ MINERALS • PAGE 13
PROMINENT HILL: MALU UNDERGROUND DEVELOPMENT
Copper Domain
Gold Domain
Current Pit Shell
Final Pit Shell
Completed Development
Exploration Decline
LEGEND Proposed 2013 drilling
• Malu underground Resource Drilling commenced in the December quarter.
• Malu Resource drilling will ramp-up throughout 2013 as hanging wall collar positions are developed.
• Underground drilling program expected to take 12-18 months.
• Mine development continues with first stoping ore expected in 2014.
OBLIQUE VIEW
50m
OZ MINERALS • PAGE 14
CARRAPATEENA Q4 DRILLING RESULTS: DD12CAR106 ASSAYS (CROSS SECTION)
69.0m @ 1.68% Cu, 0.89 g/t Au, from 1,067.0m
* Intervals calculated using a 0.7% Cu cut-off grade, are down hole length-weighted and include up to 4m internal dilution.
Bornite Zone
Chalcopyrite Zone
203.3m @ 2.54% Cu, 0.61 g/t Au, from 1,168.0m
251.0m @ 3.27% Cu, 0.46 g/t Au, from 1,393.0m
Looking West
Hole DD12CAR106 was completed during the quarter. Assays received with continued excellent results.
1,094m @ 1.62% Cu and 0.47 g/t Au
Including significant intercepts of:
Hole Number Interval (metres)
Copper (%)
Gold (g/t)
DD12CAR106 69.0 1.68 0.89
DD12CAR106 203.3 2.54 0.61
DD12CAR106 251.0 3.27 0.46
OZ MINERALS • PAGE 15
CARRAPATEENA: INFERRED & INDICATED RESOURCES
2012 INDICATED & INFERRED RESOURCES 292Mt @ 1.29% Cu, 0.48 g/t Au 203Mt @ 1.31 % Cu, 0.56 g/t Au
2011 INFERRED RESOURCES
250m
Section 737800mE Looking West
• The 2012 Indicated and Inferred Resources of 292Mt represent a 43% increase over the 2011 resource at a 0.7% Cu cut-off.
• Much of the 2011 Exploration Target area has been converted to Mineral Resources in the 2012.
• Infill exploration drilling program has better defined the higher grade bornite zones - now one bornite zone.
• Deeper infill exploration drilling has led to an extension of the Resource at depth.
* These wireframes show the interpreted limits of the Chalcopyrite envelope and Bornite zones respectively. These domains contain almost the entire resource. Intervals calculated using a 0.3% Cu cut-off grade.
Resource classification is shown in ‘stylised’ view at Section 737800mE with +/-50m window.
Indicated Resources
Inferred Resources
Exploration Target
LEGEND
Chalcopyrite Zone
Upper Bornite Zone
Lower Bornite Zone
Bornite Zone
OZ MINERALS • PAGE 16
CARRAPATEENA: NEW DISCOVERY KHAMSIN PROSPECT
• New regional discovery made at the Khamsin prospect.
• Khamsin prospect approximately 10kms northwest of Carrapateena.
• Geophysical signature is similar to in size to Carrapateena.
• First drill hole with 440.6m @ 0.43% Cu.
OZ MINERALS • PAGE 17
CARRAPATEENA: NEW DISCOVERY KHAMSIN PROSPECT
• First hole at Khamsin prospect intersects mineralisation 440.6m @ 0.43% Cu.
• “Down hole” depth 1,005.4 metres.
• Depths to basement (from surface) approximately 500-600 metres.
• Further drilling expected in 2013.
OZ MINERALS • PAGE 18
CARRAPATEENA: FREMANTLE DOCTOR PROSPECT
• Fremantle Doctor prospect shows a potential extension of the mineralised zone around Carrapateena.
• Further geophysics and drilling are planned for 2013.
OZ MINERALS • PAGE 19
CARRAPATEENA: REGIONAL PROSPECTS
• Geophysics over the region has identified nine targets for follow up drilling testing.
N
OZ MINERALS • PAGE 20
CARRAPATEENA EXPLORATION DECLINE - UPDATE • OZ Minerals purchases a
remanufactured Tunnel Boring Machine (TBM) to fast track development of the exploration decline at Carrapateena.
• Expected cost of TBM including mobilisation $12-15 million - to be commissioned in late 2013.
• Expected development rates between 350-550 metres per month.
• Expected time to reach geotechnical level ~625 metres below surface approximately 12 months ahead of traditional drill and blast.
• Exploration decline development costs $100-110 million.
OZ MINERALS • PAGE 21
CARRAPATEENA - UPDATED CONCEPTUAL PROJECT SCHEDULE
COMPLETED 2013 2014 2015 2016 2017
Exploration drilling to upgrade to Indicated Resource Exploration decline (down to 625m below surface)
Pre-feasibility
Geotechnical testing
Feasibility study
Decision to mine
Detail design and construction
OZ MINERALS • PAGE 22
2013 EXPLORATION COMMITMENT
• Total exploration budget for 2013: $58 million.
• Prominent Hill exploration $25 million of which $17 million is expected to be capitalised resource drilling in the Malu underground.
• Further regional exploration drilling and geophysics at Khamsin and Fremantle Doctor prospects.
• Late 2013 sees the Tunnel Boring Machine commence the exploration decline at Carrapateena to allow geotechnical testing.
Prominent Hill - Regional (Expensed)
Prominent Hill - Underground Resource Drilling (Capitalised)
Carrapateena - Regional (Expensed)
Carrapateena - Decline (Expensed)
Global - Project Generation (Expensed)
$7m
$13m $13m
$17m $8m
OZ MINERALS • PAGE 23
STRATEGY REAFFIRMATION Strategy has five key elements with base of zero harm:
1. Focus on copper.
2. Maximise potential of assets.
3. Build a project pipeline.
4. Invest in exploration.
5. Disciplined capital management.
Progress since 2009
• Prominent Hill consistent performance with developing underground future.
• Extensive exploration at Prominent Hill – Ankata in production, Malu UG being developed.
• Carrapateena acquisition, exploration & evaluation directed at development of long-term copper operation.
• Capital management: capital return $389M, share buyback $200M, with dividends $445M.
• Highly disciplined business development activity – shareholder value protected.
OBJECTIVE SHAREHOLDER RETURNS
OZ MINERALS • PAGE 24
CONCLUSION
• Prominent Hill delivers another consistent production year with 101,737t of copper and 140,746oz of gold at a C1 Cost of US120c/lb.
• Resource drilling in the Ankata underground increases its life by two years – further resource drilling sees high grade intercepts.
• Mine development commenced on the Malu underground.
• Outstanding infill drilling results during 2012 sees the Carrapateena Mineral Resources increase by 43% (at 0.7% Cu cut-off).
• Purchase of a Tunnel Boring Machine will accelerate project timing at Carrapateena.
• An exciting new regional discovery at the Khamsin prospect.
• Strategy on course.
OZ MINERALS • NOVEMBER 2009 • PAGE 25
COMPETENT PERSONS STATEMENT Within this presentation are references to a summary of information relating Prominent Hill Mineral Resources. The Prominent Hill Mineral Resources are set out in the Prominent Hill Mineral Resources and Ore Reserves Statement as at 30 June 2012. This information has been compiled by John Penhall and Andrew Loreck who are both full time employees of OZ Minerals and members of Australasian Institute of Mining and Metallurgy (AusIMM). This information and exploration results relating to Prominent Hill has been approved for release in the form and context in which it appears by Mr Jim Hodgkison who is a full time employee of OZ Minerals and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a competent person as defined in the 2004 edition of the Australasian Code For Reporting Of Exploration Results, Mineral Resources and Ore Reserves. Information in this presentation which refers to Prominent Hill Ore Reserves is a summary of information relating to Ore Reserves as set out in the Prominent Hill Mineral Resources and Ore Reserves Statement as at 30 June 2012. This information has been approved for release in the form and context in which it appears by Mr Justin Taylor who is a full time employee of OZ Minerals and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a competent person as defined in the 2004 edition of the Australasian Code For Reporting Of Exploration Results, Mineral Resources and Ore Reserves. Within this presentation are references to exploration results relating to Prominent Hill and Carrapateena are based on information compiled by Mr Marcel Van Eck Msc who is a full-time employee of OZ Minerals, is a member of the Australian Institute Of Geoscientists and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activities undertaken to qualify as a competent person as defined by the JORC code (2004). Mr Van Eck has consented to the inclusion of the material in the form and context in which it appears. The information in this presentation which refers to Carrapateena Mineral Resources is based on information compiled by Stuart Masters who is a member of the Australasian Institute Of Mining And Metallurgy (AusIMM) (108430). Stuart Masters is employed by CS-2 Pty Ltd and is a consultant to OZ Minerals. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2004 edition of the Australasian Code For Reporting Of Exploration Results, Mineral Resources And Ore Reserves (JORC 2004). Stuart Masters consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Stuart Masters Bsc (Geology), CFSG, has over 26 years of relevant experience as a geologist including 9 years in iron-oxide-copper-gold style deposits. Stuart Masters has visited site on many occasions since OZ Minerals acquired the project. All other references to exploration results within this presentation are based on information compiled by Mr Anthony Houston Bsc who is a full-time employee of OZ Minerals, a member of the Australian Institute Of Geoscientists and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activities undertaken to qualify as a competent person as defined by the JORC Code (2004). Mr Houston has consented to the inclusion of the material in the form and context in which it appears within this references to exploration results relating to Prominent Hill and Carrapateena. For full details of the 2012 Prominent Hill Mineral Resources and Ore Reserves Statement and details relating to the 2012 Carrapateena Mineral Resources Statement for 2012 go to http://www.ozminerals.com/operations/resources--reserves.html
Top Related