EngineeringEngineeringProcurementProcurement
ConstructionConstructionInstallationInstallation
& Commissioning& CommissioningPresented byPresented by
Mr. Therasap RattanapatMr. Therasap Rattanapat
OVERVIEW OF OFFSHORE
PLATFORM
8/11/2019 Offshore Platform Installation.pdf
2/25
World Primary Energy DemandWorld Primary Energy Demand
8/11/2019 Offshore Platform Installation.pdf
3/25
Concession in ThailandConcession in Thailand-Bongkot Field Development (PTTEP)
-Arthit Field Development (PTTEP)
-Erawan Group
-Nang Nuan-Tantawan
-etc
8/11/2019 Offshore Platform Installation.pdf
4/25
Joint Development Area (JDA)Joint Development Area (JDA)Thailand / MalaysiaThailand / Malaysia
-Carigali - Triton Company Sdn.Bhd (CTOC)
-Carigali PTTEPI Operating Company Sdn.Bhd (CPOC)
-etc
8/11/2019 Offshore Platform Installation.pdf
5/25
PTT EXPLORATION AND PRODUCTIONPTT EXPLORATION AND PRODUCTION
8/11/2019 Offshore Platform Installation.pdf
6/25
Type of Offshore StructureType of Offshore Structure
-Fixed Platform Gravity Base Platform, Jacket Type Platform
-Compliant Tower Compliant Piled Tower, Guyed Tower
-Tension Leg Platform
-Floating Platform Semi-Submersible, Extendable Draft Platform, FSO, FPSO
-Spar
8/11/2019 Offshore Platform Installation.pdf
7/25
Drilling RigDrilling Rig
JackJack--UpUp
Tender RigTender Rig
8/11/2019 Offshore Platform Installation.pdf
8/25
Offshore Platform in ThailandOffshore Platform in Thailand
Fixed Platform, Jacket TypeFixed Platform, Jacket Type
More economicalMore economical
Rich gas reserveRich gas reserve-- lessless
storage requirementstorage requirement
Expected long field lifeExpected long field lifeeasyeasy
expansionexpansion
Suitable for shallow waterSuitable for shallow water
(The water Depth In Gulf of(The water Depth In Gulf of
Thailand is 80m Approx.)Thailand is 80m Approx.)
8/11/2019 Offshore Platform Installation.pdf
9/25
Field Development OrganizationField Development Organization
Field
Development
Exploration
Drilling
Project
Development Operation
Financing and
Accounting
Legal and
Contracting
HSESchedule and
Planning
Major
Modification
Conceptual
Design
Detailed
Design Procurement Fabrication
Abandonment
Load-out,
Transportation,Installation
Hook-up &
Commissioning
8/11/2019 Offshore Platform Installation.pdf
10/25
E : EngineeringE : EngineeringEngineering DesignEngineering Design
Feasibility StudyFeasibility Study Conceptual DesignConceptual Design
FEED ( Front End Engineering Design)FEED ( Front End Engineering Design)
Detail EngineeringDetail Engineering
HAZOPHAZOP ENGINEERING
Process Structure Piping InstrumentMechanical Electrical
8/11/2019 Offshore Platform Installation.pdf
11/25
Field Development PlanField Development Plan
Central Processing ComplexCentral Processing Complex CPPCPP
QP, bridge connected to the CPPQP, bridge connected to the CPP
WP, bridge connected to the CPPWP, bridge connected to the CPP
FP/T, bridge connected to the CPPFP/T, bridge connected to the CPP
Five remote WellheadsFive remote Wellheads
Gas gathering pipelines connecting the remote wellheadGas gathering pipelines connecting the remote wellheadplatformplatform
A gas pipeline to export the gasA gas pipeline to export the gas
A condensate line to export to Silver FSOA condensate line to export to Silver FSO
Facilities for the first stage of the development
8/11/2019 Offshore Platform Installation.pdf
12/25
8/11/2019 Offshore Platform Installation.pdf
13/25
Living QuarterPlatform (LP)
Processing Platform(PP)
Low-Pressure Flare (LP)
High-Pressure Flare (HP)
Riser Platform(RP)
Wellhead Platform
(WP)
8/11/2019 Offshore Platform Installation.pdf
14/25
Design conditionDesign condition
ReservoirsReservoirs Characteristic of waveCharacteristic of wave
Direction of windDirection of wind
100 years storm100 years storm 30 years design life.30 years design life.
80 meters water depth80 meters water depth
No seismic.No seismic.
8/11/2019 Offshore Platform Installation.pdf
15/25
CPP Facilities DesignCPP Facilities DesignOverall Processing facil it iesOverall Processing facil it ies
Receiving facilitiesReceiving facilities
Mercury removal facilitiesMercury removal facilities
Gas processing facilitiesGas processing facilities
Condensate processingCondensate processing
facilitiesfacilities
Produced water treatmentProduced water treatment
and pumping facilitiesand pumping facilities
8/11/2019 Offshore Platform Installation.pdf
16/25
CPP Facilities DesignCPP Facilities DesignTopsides LayoutTopsides Layout
All high pressure gas handling equipment should be located on eiAll high pressure gas handling equipment should be located on eithertherthe top or main deck and preferably be located at the west end othe top or main deck and preferably be located at the west end of thef theplatformplatform
All major rotating equipment including gas turbine driven ProcesAll major rotating equipment including gas turbine driven ProcesssCompressors and Main Power Generation Units shall be located onCompressors and Main Power Generation Units shall be located on thethe
top decktop deck Two cranes shall be used, one probably located on the west sideTwo cranes shall be used, one probably located on the west side of theof the
platform and the other crane on the opposite side (platform and the other crane on the opposite side (i.ei.e east side) of theeast side) of theplatformplatform
Boat landing facilities are not required on the CPP, only on theBoat landing facilities are not required on the CPP, only on the LQ andLQ and
the DWPthe DWP--1. However bumper bars are required to facilitate supply boat1. However bumper bars are required to facilitate supply boataccess for diesel fillaccess for diesel fill
UseUse ofofaa singlesingle--levellevel bridgebridge accessaccess betweenbetween LQLQ andand CPPCPP shallshall bebeusedused.. TheThe bridgebridge willwill connectconnect thethe mainmain deckdeck levellevel ofofthethe CPPCPP andand thetheLQLQ..
8/11/2019 Offshore Platform Installation.pdf
17/25
CPP Facilities DesignCPP Facilities DesignStructure DesignStructure Design
Fixed platform 8 legsFixed platform 8 legs
8484
diameters pilesdiameters piles
Skirt pile (if 8 legs are inadequate)Skirt pile (if 8 legs are inadequate)
TopsideTopside -- FloatFloat--over installationover installation
JacketJacket --Launching and craneLaunching and craneassisted upendingassisted upending 20 years of sacrificial anodes20 years of sacrificial anodes
8/11/2019 Offshore Platform Installation.pdf
18/25
CPP Facilities DesignCPP Facilities Design
Glycol
ContactorWellhead
Platform
Wellhead
Platform
Wellhead
Platform
Separator
Condensate
Stabilization
FSO
Compression
GasMetering
Pipeline
WaterTreatment
8/11/2019 Offshore Platform Installation.pdf
19/25
QP Facilities DesignQP Facilities DesignDiamondDiamondLivingLivingQuartersQuartersBuildingBuilding
Designed for modular construction withDesigned for modular construction with maximaummaximaum capacitycapacity
of 150 personnelof 150 personnel
AA HelideckHelideck to land a Sikorsky Sto land a Sikorsky S--61, S61, S--76 or a76 or a EurocopterEurocopterEC155 helicopterEC155 helicopter
Dining/mess facilities designed to accommodate 90Dining/mess facilities designed to accommodate 90personnel at one servingpersonnel at one serving
A medical centreA medical centre
AA gymnasiumgymnasium andand outdooroutdoorrecreationrecreation facilitiesfacilities ((atat roofrooflevelleveljustjust belowbelow thethe HelideckHelideck).).
AA TVTV//cinemacinema//trainingtraining roomroom providedprovided toto accommodateaccommodate 8080
personnelpersonnel
8/11/2019 Offshore Platform Installation.pdf
20/25
QP Facilities DesignQP Facilities Design
TopsideLayout
Three deck levels are envisaged which include a Maindeck, a Mezzanine deck, and a Lower deck.
The LQB shall be installed on the Main deck.
The Central Control Room building will be installed on acantilever on the QP.
All other facilities shall be located either on the Mezzaninedeck, Lower deck or in spaces available on the Main Deck.
A single level bridge shall be used to connect the CPP to
the LQ.
8/11/2019 Offshore Platform Installation.pdf
21/25
QP Facilities DesignQP Facilities DesignStructure DesignStructure Design
Fixed platform 4 legsFixed platform 4 legs
ThroughThrough--leg piles and groutedleg piles and grouted
annuliannuli SideSide--lifting and cranelifting and crane
assisted upendingassisted upending
20 years of sacrificial anodes20 years of sacrificial anodes
8/11/2019 Offshore Platform Installation.pdf
22/25
FP/T DesignFP/T Design A flare tower, bridge connected to the CPP shall beA flare tower, bridge connected to the CPP shall be
provided. The tower will support the flare tips of the HP, LPprovided. The tower will support the flare tips of the HP, LP
and Acid Gas flare systems.and Acid Gas flare systems. Preliminary flare and dispersion studies have initially setPreliminary flare and dispersion studies have initially set
the bridge length to be 120 m and tower height to be 25 mthe bridge length to be 120 m and tower height to be 25 mabove the flare platform deck.above the flare platform deck.
Structure DesignStructure Design
A 3 legged tripod structureA 3 legged tripod structure
UngroutedUngrouted leg pilesleg piles 15 years of sacrificial anodes15 years of sacrificial anodes
8/11/2019 Offshore Platform Installation.pdf
23/25
WP DesignWP Design The function of the wellhead is toThe function of the wellhead is to
maintain surface control of the well.maintain surface control of the well.
All actuated wellhead valves will beAll actuated wellhead valves will behydraulically operated.hydraulically operated.
Wells will be drilled by tender rig.Wells will be drilled by tender rig.
All of Christmas trees that be usedAll of Christmas trees that be usedin the project are dry type.in the project are dry type.
Structure DesignStructure Design
4 legs with though leg piles4 legs with though leg piles
Sided lifting and craneSided lifting and craneassisted upendingassisted upending
20 years of sacrificial anodes20 years of sacrificial anodes
8/11/2019 Offshore Platform Installation.pdf
24/25
3D Design3D Design
8/11/2019 Offshore Platform Installation.pdf
25/25
Approx Tonnage of PlatformApprox Tonnage of Platform
10001000
12001200
Wellhead ( 6 WH)Wellhead ( 6 WH)
JacketJacket
TopsideTopside
100100Bridge (2 bridges)Bridge (2 bridges)
500500
500500
FP/TFP/T
JacketJacket
TopsideTopside
800800
15001500
QPQP
JacketJacket
TopsideTopside
600060001500015000
CPPCPP
JacketJacketTopsideTopside
Approx. weightApprox. weight
(Tons / Each)(Tons / Each)
FacilitiesFacilities