Off The Shelf?
Graeme Van Leer
Electronic Systems
2
Electronic Systems
Proprietary Information
L-3 Electronic Systems
• 45 years Experience with facilities in Halifax & Toronto
– Display Solutions
– Vetronics
– Weapon Systems Support
– Repair & Overhaul
– Systems Engineering
• Halifax
– Avionics test
– Repair & overhaul
– Build to Print
– ILS
3
Electronic Systems
Proprietary Information
Scope of Logistics Capabilities
New System Design
• Develop Logistics Databases (LSAR)
• Reliability, Maintainability, Availability Analysis
• Logistics Support Analysis (Sparing, LORA, LCC, FMECA, Maintenance Task Analysis, RCMA)
• Logistics Products (Maintenance Plans and schedules, Provisioning data, Technical Publications, Facilities, Training, Spares)
In-Service Support
• Life Cycle Management
• On-going Logistics Supportability Studies
• Technical Publications Management
• Support to R&O
• Materiel Management
• Life Cycle Cost Analysis
4
Electronic Systems
Proprietary Information
Halifax Class Modernization
• $2b Contract
– Design & Build
– In-Service Support
• Design & Build
– CCS
– 2D Radar
– 3D Radar
– Nav Radar
– ESM
– Fire Control Radar
– MultiLink
– IFF
5
Electronic Systems
Proprietary Information
Halifax Class Modernization
• Prime - Lockheed Martin Canada
– L-3 ES Tier 1 Partner
• ILS
• Logistics Engineering
• Reliability
• Maintainability
• LSAR
• Technical Publications
• Support to: – Training
– Test & Trials
6
Electronic Systems
Proprietary Information
Off the Shelf
• Why is this a good decision?
– Risk Reduction
• Cost
• Time
• Compatibility
– Lower overall procurement cost
– Proven Technology
– Existing field data
– Existing documentation
7
Electronic Systems
Proprietary Information
ILS & Off-The-Shelf…
Good Bad
8
Electronic Systems
Proprietary Information
LSAR
Level 3
Level 2 Level 1
A Proposed Solution
Mature ILS Data
Existing. Fully
Developed LSAR Immature ILS Data
or no LSAR Data.
Processing
Required
No LSA input Data.
Classical ILS
Approach required
9
Electronic Systems
Proprietary Information
LSAR
Level 3
Level 2 Level 1
The Reality
Mature ILS Data
Existing. Fully
Developed LSAR Immature ILS Data
or no LSAR Data.
Processing
Required
No LSA input Data.
Classical ILS
Approach required
10
Electronic Systems
Proprietary Information
The reality cont’d
• 7 Different OEMs
• 7 Different methods of delivery
• 7 Different interpretations of the DIDs
• 7 Different countries (including Canada)
• 7 Different explanations of the same issues…
• 1 headache
11
Electronic Systems
Proprietary Information
The Reality cont’d
• Unrealistic ILS Requirements
– Renegotiation to account for OTS solution
• No redesign
– DED List undefined
• Non-specific Data Item Descriptions (DIDs)
• Commonality needed
– Templates created for collating the data and ultimate upload into OmegaPS. Status Tool
12
Electronic Systems
Proprietary Information
LSAR Status
Creating the upload templates in
Excel allows a status of
completion to be created for
monthly reporting requirements.
13
Electronic Systems
Proprietary Information
The Reality cont’d
• Unrealistic ILS Requirements
– Renegotiation to account for OTS solution
• No redesign
– DED List undefined
• Non-specific Data Item Descriptions (DIDs)
• Commonality needed
– Templates created for collating the data and ultimate upload into OmegaPS.
– FMECA/RCMA Tool
14
Electronic Systems
Proprietary Information
L-3 Developed FMECA/RCMA Tool
15
Electronic Systems
Proprietary Information
The Reality cont’d
• Unrealistic ILS Requirements
– Renegotiation to account for OTS solution
• No redesign
– DED List undefined
• Non-specific Data Item Descriptions (DIDs)
• Commonality needed
– Templates created for collating the data and ultimate upload into OmegaPS.
– FMECA/RCMA Tool
– LCC Spreadsheet - Analyzer
16
Electronic Systems
Proprietary Information
LCC Objectives
System LCC analysis using Pennant Analyzer to
Prove compliance to the LCC requirements
Identification of significant cost drivers in each system and sub-system.
As time goes on, monitoring trends in support costs to identify possible supportability issues.
17
Electronic Systems
Proprietary Information
Why LSAR?
• Logistics Supportability Studies
• Sparing Analysis and LORA
• LCC
Source and repository for
logistics analysis data
• Synchronized data exchange
• CM Controlled
Data exchange and integration from multiple
sources
• Can be accessed via website search tool
Data Source for All StakeHolders
18
Electronic Systems
Proprietary Information
LSAR Data Search
19
Electronic Systems
Proprietary Information
How will COTS affect where ILS is going
It is not going away..
20
Electronic Systems
Proprietary Information
Current Environment (1)
• Constantly Changing Requirements
– Fleet role, fleet structure, fleet size
– Address thru agile, flexible logistics and maintenance
• More emphasis on Systems
– Systems vs. components
– Simpler maintenance chain but more dependence on 1st line effectiveness
– More dependence on 3rd line repair
• Increasing System complexity
– Evolving Technology changes
– Open Architecture drives tech refresh
21
Electronic Systems
Proprietary Information
Current Environment (2)
• Extended System Life Cycles –shorter technology life cycle
– Obsolescence management
• Greater Utilization of COTS
– Driven by lower initial cost
– Supply Chain and maintenance shifts downstream
– IP – on-going issue when seeking support alternatives
• More outsourcing
– OEM driven from original contractual arrangements
– Alternatives may be opaque given IP
22
Electronic Systems
Proprietary Information
Questions / Comments?