info
rmat
ion
OCEANEERING CONTRACTORS (PHILIPPINES), INCORPORATED is a 100% Filipino-owned and managed corporation established by MARIANO R. PEDRIGAL, a pioneer in the Philippines for commercial diving. The Company boasts of decades of specialization and proven expertise in various aspects of civil works and oceaneering services. It continuously strives for optimum efficiency and reliability in all the projects it undertakes, with a balanced complement of professional men and machines and its safety programs playing a major role in the enhancement of these objectives. The Company’s high level of safety consciousness, particularly in critical projects involving oil refineries, piers and other structures, enabling it to accomplish its projects with zero chances of errors and injury to life and property. The Company boasts of a 100% Safety Record to date. Through years of experience, the Company has honed its services to the highest degree of efficiency, making it one of the most reliable oceaneering service contractors in the country today.
SCOPE OF SERVICES A. General Engineering / Civil Works / Earth Works:
Construction of Off-Shore Structures
Concrete Jacketing
Epoxy Pressure Intrusion, Putty and Grouting
Pile Driving
Tank Construction
Construction of Warehouse
B. Non-Destructive Testing Services:
Ultrasonic Thickness Gauging
C. Corrosion Prevention by Cathodic Protection:
Impressed Current Cathodic Protection
Galvanic-Type Sacrificial Anodes
D. Survey / Inspection Works:
Hydrographic / Topographic / Oceanographic Survey
Seabed Survey, Debris Survey, Marine-Growth Survey
Survey / Inspection with Digital Photography, Video and
Closed-Circuit Television
Corrosion Damage Inspection
Scour and Stability Inspection
Structural Integrity Assessment
E. Other Services:
Hydro Testing
Hydro Blasting
Submarine Cable Installation
Underwater Demolition and Blasting
Underwater Hydraulic Hull Scrubbing
Underwater Pipe Cleaning
Underwater Pipeline Laying and Removal
Underwater Pipeline Insulation
Underwater Oxy-Arc Welding and Cutting
GENERAL INFORMATION Business Address:
55 Washington Street, Merville Park Subdivision, Paranaque City 1709, Metro Manila, Philippines
Telephone Numbers:
(+63 2) 824-2353; (+63 2) 824-2355 Web Address:
http://www.oceaneeringcontractors.com Email Address:
[email protected] [email protected]
Contact Persons:
Mr. Alexander Ll. Pedrigal : +63918-900-9810 Mr. Mardi C. Millama : +63908-865-8899
LIST OF CLIENTS
Aboitiz Power Corporation Agrotech Agricultural Products, Inc. Alcorn (Production) Philippines, Inc. Archen Technologies, Inc. Archipelago Industrial Management Corporation Asian Terminals, Inc. Atlantic, Gulf and Pacific Company of Manila, Inc. Batangas Bay Terminal, Inc. Bauan International Port, Inc. Cebu Energy Development Corporation Cebu Private Power Corporation Cemex Philippines/Apo Cement Corporation Chevron Philippines, Inc. Coastal Subic Bay Terminal, Inc. Coca-Cola Bottlers Philippines Inc. Consolidated Training Systems, Inc. Costa del Hamilo, Inc. - SM Development Corporation Daelim Industrial Co., Ltd. Del Monte Philippines, Inc. East Asia Utilities Corporation Ecoresort Development Corporation Fil Oil Logistic Corporation First Gen Corporation General Milling Corporation Global Business Power Corporation Global Marine Systems Himmel Industries, Inc. Holcim Philippines, Inc. Insular Oil Corporation Kepco Ilijan Corporation Keppel Philippines Shipyard, Inc. La Filipina Uy Gongco Corporation LMG Land Development Corporation MacroAsia Catering Services, Inc.
Mirant Toledo Holdings Corporation MWH Brunei Darussalam Naga Fuel Express Zone National Power Corporation Nippon Steel and Sumikin Company, Ltd. Oilink International Corporation Orica Nitrates Philippines, Inc. PaintPros Industrial Corporation Pamalican Island Resorts, Inc. – Amanpulo Pandacan Depots Services, Inc. Pandiman Philippines, Inc. Petron Corporation Philippine Flour Mills Philippine Mining Service Corporation Philippine Phosphate Fertilizer Corporation Philippine Resins Industries, Inc. Phoenix Petroleum Philippines, Inc. Pilipinas Shell Petroleum Corporation PNOC Exploration Corporation Poyry Energy, Inc. Pryce Gases, Inc. Pure Essence International, Inc. Rio Tuba Nickel Mining Corporation Riofil Corporation San Miguel Corporation San Roque Power Corporation Seven Seas Resorts & Leisure, Inc. Siemens Power Operations, Inc. South Pacific, Inc. Sta. Elena Construction & Development Corporation Subic Seaport Terminal, Inc. Subic Water and Sewerage Company, Inc. Team Energy Corporation Therma Marine, Inc. Therma Luzon, Inc.
Total Philippines Corporation Toyo Construction Co., Ltd. Tsuneishi Heavy Industries (Cebu), Inc. TWA, Inc. - Flying V Corporation Unioil Petroleum Philippines, Inc. Vispet Development Corporation Wack Wack Golf and Country Club Wilmar Edible Oils Philippines, Inc. WorleyParsons Limited
Petron Corporation Mandaue Terminal Proj. Pile Barge #2 setting from service barge
Pile Barge #2 holding a concrete pile ready for driving
Concrete Pile driving
Petron Corporation Mandaue Terminal Proj. Determining exact pile location
2018 Corporate Profile
OCEANEERING CONTRACTORS: Past and Present
Armour Rocks Levelling Interconnection to the Pier Deck
SM-Hamilo Ferry Terminal Pier Deck Steelworks and Formworks at the Pier Deck
Concreting work activities on PierDeck View of the construction of SM-Hamilo
Ferry Terminal at Nasugbu, Batangas
2018 Corporate Profile
Form preparation for beams of pile caps at the Orica Nitrates Phils, Inc. Pier, Negros Oriental
Setting pre-cast slabs on beams
Pile driving activity at the Orica Nitrates Phils. Inc. Pier, Negros Oriental
Pier Deck Completion
Complete Installation of Fendering System at the Orica Nitrates Pier, Negros Oriental
Completion of the Domestic Loading Area at the Orica Nitrates Pier, Negros Oriental
2018 Corporate Profile
2018 Corporate Profile
CONSOLIDATED TRAINING SYSTEM, INC. Site Fabrication for the Construction of Mini Pier
at Tanza, Cavite
CONSOLIDATED TRAINING SYSTEM, INC. Pile Driving Works for the Construction of
Mini Pier at Tanza, Cavite
CONSOLIDATED TRAINING SYSTEM, INC. Completed Construction of Mini Pier
at Tanza, Cavite
Construction of the Petron Corporation Zamboanga Depot
Offshore pile driving at the Petron Corporation Depot
Near completion of the Petron Corporation Pier facility
Front view of the Petron Corporation Zamboanga Depot pier facility
1st fuel receiving at the newly constructed Petron Zamboanga Depot
2018 Corporate Profile
2018 Corporate Profile
PDSI - Petron Corporation Installation of Steel Fender Support
at Pandacan, Manila
PDSI - Petron Corporation Installation of Chain Link Fender
Support at Pandacan, Manila
PDSI - Petron Corporation Berthing of Vessel after the Fender Pier
Repair at Pandacan, Manila
2018 Corporate Profile
SAN MIGUEL CORPORATION Rebar Installation for the Rehabilitation of
Fendering System at SMC Butuan Wharf
SAN MIGUEL CORPORATION Formworks Installation for the Rehabilitation
of Fendering System at SMC Butuan Wharf
SAN MIGUEL CORPORATION Panoramic View after the completion of Fendering
System Rehabilitation at SMC Butuan Wharf
2018 Corporate Profile
PETRON CORPORATION Above and underwater installation anti-corrosion paste,
marine tape & FRP for the Repair of Pier and 8ӯ Riser Pipe
PETRON CORPORATION Fabrication of Stainless Steel Ladder and 8ӯ Pipe for the
Repair of Pier and 8ӯ Riser Pipe
2018 Corporate Profile
PHOENIX PETROLEUM PHILIPPINES INCORPORATED Panoramic View of Berthing Facility
Construction of 6000DWT Berthing Facility
PHOENIX PETROLEUM PHILIPPINES INCORPORATED Panoramic View of Mooring Facility
Construction of 6000DWT Berthing Facility
Painted Steel Catwalk and Bollards
Valve Manifolds at Receiving Platform of 6”Ø pipeline and 3” Ø pipeline
2018 Corporate Profile
Berthing & Receiving Facilities Construction at Prycegases Inc.
Berthing & Receiving Facilities Construction at Prycegases Inc.
Completed Berthing & Receiving Facility with Underwater Pipelines
1st product receiving on the newly commissioned Receiving Facility
Concrete pouring of Newly Constructed Breasting Dolphin at Oilink Int’l., Bataan
Construction of 1 of 3 Catwalks for the Breasting Dolphin Interconnection
Installation of Catwalk for Breasting Dolphin Completed Breasting Dolphin construction
Interconnected Breasting Dolphin Facility construction completed
Front side view of the completed Breasting Dolphin Facility at Oilink Int’l., Bataan
2018 Corporate Profile
On-site construction of Mooring Buoys
Application of marine coating system in preparation for top coat
Final checking and evaluation of Mooring Buoys
Completed unit of Mooring Buoy with Chain Attachment
2018 Corporate Profile
Concrete Anchors for the 4-point Mooring System
5-Ton Concrete Anchor ready for deployment underwater
2018 Corporate Profile
SIEMENS POWER OPERATIONS, INC. Launching and Installation of Marker Buoys for the Dismantling,
Retrieval and Re-installation of 4 units Marker Buoys at Batangas City
2018 Corporate Profile
SIEMENS POWER OPERATIONS, INC. Fabrication of forms and rebars for the Supply and Installation of
Marker Buoy Accessories at Batangas City
SIEMENS POWER OPERATIONS, INC. Concrete pouring and stripping of form for the Supply and Installation of Marker Buoy Accessories at Batangas City
SIEMENS POWER OPERATIONS, INC. Underwater installation of concrete sinker to the drop point for the Supply and Installation of Marker Buoy Accessories at Batangas City
2018 Corporate Profile
CEBU PRIVATE POWER CORPORATION Launching and Installation
Rehabilitation of Four (4) Units Mooring Buoys
CEBU PRIVATE POWER CORPORATION Installed Mooring Buoys
Rehabilitation of Four (4) Units Mooring Buoys
MB-1 MB-4 MB-3 MB-2
2018 Corporate Profile
PHILIPPINE MINING SERVICES CORP. Retrieved Mooring Buoy
for Rehabilitation
PHILIPPINE MINING SERVICES CORP. Sandblasting of Mooring Buoy
PHILIPPINE MINING SERVICES CORP. Mooring Buoy after Rehabilitation
PHILIPPINE MINING SERVICES CORP. Launching of Mooring Buoy
PHILIPPINE MINING SERVICES CORP. Mooring Buoy Commissioning
on Vessel Receiving
2018 Corporate Profile
SEVEN SEAS RESORT & LEISURE, INC. Fabricated Concrete X-Block
for Wave Breaker
SEVEN SEAS RESORT & LEISURE, INC. Underwater Securing of Steel Cable
on Concrete X-Block for Wave Breaker
SEVEN SEAS RESORT & LEISURE, INC. Installed Concrete X-Block
for Wave Breaker Underwater
2018 Corporate Profile
Pamalican Resorts, Inc. Underwater Retrieval of X-Blocks from the
Drop-off Point at Cuyo, Palawan
Pamalican Resorts, Inc. Underwater Installation of X-Blocks
at Cuyo , Palawan
Pamalican Resorts, Inc. Underwater Installation of Cable wire for
the Securing of X- Blocks at Cuyo, Palawan
Pamalican Resorts, Inc. 50 Meters X-Blocks Extension Installed
at Cuyo, Palawan
SOUTHERN PACIFIC INCORPORATION Installed Boulders/Gabion
PROPOSED GABION SILT INTRUSION PROTECTION
SOUTHERN PACIFIC INCORPORATION Installed Boulders/Gabion
PROPOSED GABION SILT INTRUSION PROTECTION
2018 Corporate Profile
Armour Rocks Hauling and Installation at Team Energy Sual, Pangasinan Armour Rocks and Gabions Laying Project
Armour Rocks and Gabions Laying Project
2018 Corporate Profile
2018 Corporate Profile
CEBU PRIVATE POWER CORPORATION Fabrication of Forms & Rebars and Concrete Pouring for the
Seawall Repair Using Concrete Blocks
CEBU PRIVATE POWER CORPORATION Positioning of Completed Blocks for the
Seawall Repair Using Concrete Blocks
Fuel Tank Storage at Petron Zambonaga Fuel Tank Storage Construction at Petron Zamboanga
Completed Unit of the Fuel Tank Storage at Petron Zambonga Depot
2018 Corporate Profile
Naptha Intake Structure Construction Naphtha Plant Intake Pipe Laying
Divers conducting Levelling
Naphtha Plant Intake Pipe Fitting
Naphtha Plant Intake Pipe Laying
2018 Corporate Profile
2018 Corporate Profile
STA. ELENA CONSTRUCTION AND DEVELOPMENT CORPORATION Site Inspection of Location and Materials for the
Underwater Installation of GRP Pipes at Batangas City
2018 Corporate Profile
STA. ELENA CONSTRUCTION AND DEVELOPMENT CORPORATION Surveyors and divers conducted pipe elevation and alignment for the
Underwater Installation of GRP Pipes at Batangas City
STA. ELENA CONSTRUCTION AND DEVELOPMENT CORPORATION Dredging work prior to GRP pipe laying for the
Underwater Installation of GRP Pipes at Batangas City
STA. ELENA CONSTRUCTION AND DEVELOPMENT CORPORATION Water jetting and airlifting for the
Underwater Installation of GRP Pipes at Batangas City
2018 Corporate Profile
STA. ELENA CONSTRUCTION AND DEVELOPMENT CORPORATION Pipe laying work for the
Underwater Installation of GRP Pipes at Batangas City
2018 Corporate Profile
SMC Shipping & Lighterage Corp. Geotechnical Investigation Establishment of Grid Line
SMC Shipping & Lighterage Corp. Geotechnical Investigation Establishment of Grid Line
2018 Corporate Profile
Petron Corporation Hydrographic Survey and Current Observation
at Calapan, Mindoro Oriental
Petron Corporation Hydrographic Survey and Water Sampling
at Calapan, Mindoro Oriental
2018 Corporate Profile
CONSOLIDATED TRAINING SYSTEM, INC. Roofing installation for the Construction of Helideck at Tanza, Cavite
CONSOLIDATED TRAINING SYSTEM, INC. Completed Construction of Helideck at Tanza, Cavite
CONSOLIDATED TRAINING SYSTEM, INC. Completed Construction of
Building for Two (2) Storey Classroom at Tanza, Cavite
CONSOLIDATED TRAINING SYSTEM, INC. Painting Works for the Construction of
Two (2) Storey Classroom at Tanza, Cavite
2018 Corporate Profile
Dry Docking Assistance of Vessel MCC ‘Batanes” and MV “Span Asia 19”
at Keppel Subic Shipyard Inc., Subic, Zambales
2018 Corporate Profile
Pamalican Resorts, Inc. Scene from Manual Airlifting/Dredging
Amanpulo: South Tip Dredging at Cuyo, Palawan
Top Related