h

LOTS 41 & 42, PLAN 1509, LOT 23, PLAN58M-79, BLOCK 1, PLAN 58M-80 &BLOCK 1, PLAN 58M-104,CITY OF CAMBRIDGE,REGIONAL MUNICIPALITY OF WATERLOO

Saginaw Subdivision124 Saginaw Parkway

Cambridge, OntarioN1T 1Z2

K:\1422A-Nideva-Saginaw-Cambridge\Draft Plan\Draft Plan October 31 2016.dwg

Dwg..

Project

Legal Description

Stamp

Owner's Certificate

Key Plan

Surveyor's Certificate

north

Subject Site

N.T.S.SCALE

DateOctober 31, 2016

File No.1422A

Checked ByP.B.

1:1500

Drawn ByL.H.B.

Plan Scale

Other

Additional Information Required Under Section 51(17) of the Planning ActR.S.O. 1990, c.P.13 as AmendedA. As Shown B. As Shown C. As ShownD. Residential, Park, Open Space, Storm Water Management

E. As Shown F. As ShownG. As Shown H. Municipal Water Supply I. Sandy LoamJ. As Shown K. All Services As Required L. As Shown

SOURCE: REGION OF WATERLOO

Units Area(ha)

Lots/Blks

Description

Area Schedule

Residential

Park

Open Space

Roads

TOTAL

30T-___________

1-73

74

77

78

80

144

17

231

0.685

2.031

0.975

3.374

16.336

Units Area(ha)

Lots/Blks Units Area

(ha)Lots/Blks

Stage 1 Stage 2 Total

1-62

63,64

65

67,68

72

88

50

138

1.325

1.227

1.341

69

9.257

135

3

2

2

152

232

67

369

2.010

3.258

1.077

4.715

25.593

3

76

Lot Addition 0.034 0.060 0.09480

66 0.102

4

75 70 1 70

Trevor McNeil, OLSMTE Ontario Land Surveyors Ltd.

Nick Gougoulias, MCIP, RPP. - PresidentSaginaw Developments Corp.

79 0.045Walkway

70-72

2 0.073

3.628

0.028

2.456 1.546 4.002

0.572 0.572

6.164 9.792

Rev. No. ByDate Issued / Revision

- Topographic information prepared by MTE Engineering.- Contour interval 0.5m.

Notes:

1 LHBAugust 21,2015 Issued for Submission2 LHBSeptember 8,2015 Edits to Area Schedule3 LHBMay 2,2016 Revisions to Plan per Comments from City Staff and Public

Meetings. Revise Area Schedule.

4 LHBJuly 4,2016 Revisions to Plan per Comments from City Staff and PublicMeetings. Revise Area Schedule.

5 LHBAugust 10,2016 Edits to Area Schedule. Revise Street One Alignment toGreen Vista Drive.

6 LHBAugust 29,2016 Renumber Streets in Stage 2

7 LHBOctober 12,2016 Revise Stage 2, Block 67 from Park to Open Space.Revise Area Schedule.

8 LHBOctober 31,2016 Stage 1, Lots 1-8 Revised.