Download - Nexaira carl silva

Transcript
Page 1: Nexaira carl silva

Time  to  Swap    from  Wire  line  to  Wireless:  

Exploring  Total  Cost  of  Ownership  in  Replacing  Wire  line  with  Wireless  

Broadband  www.nexaira.com  

10/6/10   www.nexaira.com   1  

Page 2: Nexaira carl silva

Market  Trends  

•  The  future  is  in  replacing  or  “capping”  wire  line  deployments  with  wireless  technology:  – 3G  outperforms  DSL  for  Total  Cost  of  Ownership  – 4G  will  replace  fracNonal  T1  and  T1  services  – 4G  is  enterprise-­‐grade  and  reflects  the  speed,  quality,  and  reliability  to  replace  wire  line  

•  Wireless  is  outpacing  wire  line  in  terms  of  technological  advances  

10/6/10   www.nexaira.com   2  

Page 3: Nexaira carl silva

Market  Trends:  Business  Class  Wireless  Criteria  

•  Demand  for  higher  data  rates  •  ExpectaNons  of  lower  3G  costs  •  ConNnued  cost  reducNon  with  4G  •  Back  Office  and  Business  Class  Protocol  Support  

•  Growing  experience  with  the  take-­‐up  of  3G  is  showing  an  even  greater  demand  for  4G  

10/6/10   www.nexaira.com   3  

Page 4: Nexaira carl silva

EvaluaNng  Total  Cost  of  Ownership  (TCO)  

•  For  Wire  line  InstallaNons  and  3G  and  4G  Wireless  InstallaNons,  evaluate  all  TCO  Criteria:  – Fault  Management  

– ConfiguraNon  – AccounNng  – Provisioning  – Security  

10/6/10   www.nexaira.com   4  

Page 5: Nexaira carl silva

Wireline  InstallaNons  

•  Failures  occur  in  the  last  100  feet:  

5  10/6/10   www.nexaira.com   5  

Page 6: Nexaira carl silva

3G  and  4G  InstallaNons  

•  CapEx  is  less  expensive  for  wireless.  •  The  use  of  wireless  end  points  is  more  secure  and  leaves  less  exposure  for  interference  from  human  error  or  other  factors.  

•  If  a  failure  occurs,  the  isolaNon  of  the  trouble  is  simpler  and  is  o^en  solved  by  a  simple  swap  of  equipment.  

•  3G  and  4G  modems  can  connect  to  mulNple  base  staNons,  providing  route  redundancy.  

Strictly  ConfidenNal   6  10/6/10   www.nexaira.com   6  

Page 7: Nexaira carl silva

Closing  the  Performance  Gap  

10/6/10   www.nexaira.com   7  

Page 8: Nexaira carl silva

Closing  the  Price  Gap  

Strictly  ConfidenNal   8  

 $5.71    

 $2.85    

 $0.48      $0.24    

 $1.39      $1.13      $1.09      $1.03    

 $-­‐        

 $1.00    

 $2.00    

 $3.00    

 $4.00    

 $5.00    

 $6.00    

2008   2009   2010   2011  

Theore2cal  Downlink  Bandwidth  versus  cost  per  Mbps  

3G/4G   DSL/Wired  

Source:  Broadband  Forum,  AT&T  Wireless,  Qwest,  Cingular,  Samsung,  Nokia,  NTT  DoCoMo  and  QUALCOMM  

10/6/10   www.nexaira.com   8  

Page 9: Nexaira carl silva

Closing  the  Reliability  Gap  

•  3G/4G  High  Availability  Network  Adapter  addresses  signal  quality,  speed  and  Reliability:    – High  Gain  Beam  forming  Antenna  with  Router  and  3G  or  4G  Card  

– Wireless  Extends  Serviceable  LocaNons    

10/6/10   www.nexaira.com   9  

Page 10: Nexaira carl silva

Cost-­‐effecNve  Deployments  for  Ongoing  OperaNons  

•  OMA  DM  for  Back-­‐Office  Support:  –  DM  Client  integrated  into  Router  via  porNng  layer  hook-­‐up.  

–  Once  a  connecNon  is  established,  the  industry  standard  OMA  DM  protocol  is  leveraged  to  exchange  instrucNons  with  the  Router.    

–  Plug-­‐In  enables  the  customer  to  manage  the  device  from  DM  Portal.  

–  The  customer  can  set  and  manage  preferred  network  providers  according  to  their  profile.  

10/6/10   www.nexaira.com   10  

Page 11: Nexaira carl silva

Building  a  TCO  Model  

Leased T-1s   3G/4G Wireless  Monthly   $300   $60  Quantity   2   2  Annual   $7200   $1440  One Time Charges   $1,000   $250  Maintenance (3 years)   $250   $0  Total Cost (First Year only)  

$8200   $1690  

Capacity   3 by 3 MBs   4 by 2 MBs  

10/6/10   www.nexaira.com   11  

Page 12: Nexaira carl silva

Conclusion  and  RecommendaNons  

•  3G  and  4G  provide  beier  service  at  a  lower  Total  Cost  of  Ownership  for  businesses  and  managed  service  providers  

•  3G  and  4G  bonding  will  create  even  higher  speeds  at  more  flexible  price  points  than  wire  line  

•  Final  Analysis:  Return  on  Investment  

10/6/10   www.nexaira.com   12