Note to File GOM Deepwater Oct. 1, 2014
Scope:
BOP limitations to perform a negative test.
Discussion: This NOV document ER01198 is located in the negative testing folder.
Rams tested: 3-1/2" x 5-7/8" NXT ram, similar but not exactly what we have. Same operator size (14), and we're using 3-1/2" x 6-5/8" NXT rams. Conclusions: Looks like with increase in operator pressure to 3k we'd be able to negative test with the rams to at least a differential of 2500-2800psi. The risk of ram/seal damage associated with developing a small leak would be minor. By closing two VBRs, applying 200-500 psi in the annulus between the closed rams, and monitoring on the choke line, any leak should be quickly noticed.
Note to File GOM Deepwater Oct. 1, 2014
Top Related