Mathematics for Management Science Notes 06 prepared by Professor Jenny Baglivo © Jenny A. Baglivo 2002. All rights reserved. Integer Linear Programming (ILP) When the values of the decision variables in a linear programming problem are restricted to integers, we say that we have an integer linear programming problem or an ILP problem. When there are a large number of feasible solutions, we usually solve the LP relaxation problem (that is, the problem you get by ignoring the restriction to integer decision variables) and round the values at the end. When there are (relatively) few feasible solutions, it is best to solve the problem by trying all possibilities. Example ILP problem: Maximize OBJECTIVE = 2 x1 + 3 x2 Subject to: Constraint 1: x1 + 3 x2 ≤ 8.25 Constraint 2: 2.5 x1 + x2 ≤ 8.75 Non-negativity: x1 ≥ 0, x2 ≥ 0 Integer: x1, x2 integer (1) The feasible set for the ILP problem is the collection of 11 points highlighted below. The feasible set for the LP relaxation problem is the gray area plus the boundary lines. The dashed line is 2 x1 + 3 x2 = 11.0192.
page 2 of 25
(2) The solution to the ILP problem is x1=2 and x2=2. The maximum value of the objective function is 10.
Feasible Point OBJECTIVE Feasible Point OBJECTIVE (0,0) 0 (2,0) 4 (0,1) 3 (2,1) 7 (0,2) 6 (2,2) 10 Max (1,0) 2 (3,0) 6 (1,1) 5 (3,1) 9 (1,2) 8
(3) The solution to the LP relaxation problem is x1=36/13 and x2=95/52. The maximum value of the objective function is 11.0192.
Corner Point OBJECTIVE value (0,0) 0 (0,33/12) 8.25 (36/13,95/12) 11.0192 Max (7/2,0) 7
(4) If you round the solution to the LP relaxation problem, then you get an infeasible solution (that is, one that does not satisfy the constraints). Bounding Principles: (1) The maximum value for an ILP problem is always less than or equal to the maximum value for the LP relaxation:
MAX for ILP ≤ MAX for LP relaxation (2) The minimum value for an ILP problem is always greater than or equal to the minimum for the LP relaxation:
MIN for ILP ≥ MIN for LP relaxation
page 3 of 25
Implementing ILP problems in Solver: Step 1: Add constraints for each integer decision variable: (1) Put the address of the decision variable in the lefthand side, (2) Select “int” where you would normally select a relation (≤, ≥, =), (3) The word integer should appear on the righthand side. If nothing appears, then you
should type =integer on the righthand side. Step 2: Make appropriate selections in the options window : (1) Assume Linear Model (2) Assume Non-negative (3) 0% Tolerance (4) 1000 Iterations (or more, if needed). Comments: • If one or more variables are integer, then Solver switches from the usual linear
programming algorithm to one that searches the integer points. It uses a technique called “branch-and-bound” so that it doesn’t have to look at every single integer point before finding the optimal solution. This algorithm does not produce sensitivity reports.
• The tolerance default value is 5%. If the 5% value stays in effect, then Solver will return a solution whose objective function value is within 5% of the best possible. For maximization problems, the stopping criterion is
0.95 * Maximum for LP relaxation ≤ Current objective function value.
For minimization problems, the stopping criterion is
Current objective function value ≤ 1.05 * Minimum for LP relaxation.
page 4 of 25
Simple example solution sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
A B C D E
Simple Example
Variable 1 Variable 2 Bound
Constraint 1 1 3 8.25
Constraint 2 2.5 1 8.75
Objective 2 3
MODEL
Variable 1 Variable 2
#Units: 2 2
Max im i z e
Object ive: 10
Constra ints LHS R H S
Constraint 1 8 <= 8.25
Constraint 2 7 <= 8.75
Decision Variables
Maximize: B14
By Changing: B11:C11
Subject to:
B17:B18 <= C17:D18
B11:C11 = integer
Options:
Assume Linear Model
Assume Non-negative
0% Tolerance
1000 Iterations
page 5 of 25
Exercise 1: Air-Express is an express shipping service that guarantees overnight delivery of packages anywhere in the continental United States. The company has various operations centers, called hubs, at airports in major cities across the country. Packages are received at hubs from other locations and then shipped to intermediate hubs or to their final destinations. The manager of the Air-Express hub in Baltimore, Maryland, is concerned about labor costs at the hub and is interested in determining the most effective way to schedule workers. The hub operates seven days a week, and the number of packages it handles each day varies. Using historical data on the average number of packages received each day, the manager estimates the number of workers needed to handle the packages as:
Day Sun Mon Tue Wed Thu Fri Sat # Required 18 27 22 26 25 21 19
The package handlers working for Air-Express are unionized and are guaranteed a five-day work week with two consecutive days off. The base wage for the handlers is $655 per week. Because most workers prefer to have Saturday or Sunday off, the union has negotiated bonuses of $25 per day for its members who work on these days. The possible shifts and salaries for package handlers are:
Shift Number Days Off Wages 1 Sun and Mon 2 Mon and Tue 3 Tue and Wed 4 Wed and Thu 5 Thu and Fri 6 Fri and Sat 7 Sat and Sun
The manager wants to keep the total wage expense for the hub as low as possible. With this in mind, how many package handlers should be assigned to each shift if the manager wants to have a sufficient number of workers available each day? • Summarize the problem
page 6 of 25
• Define the decision variables precisely • Completely specify the ILP model
page 7 of 25
• Clearly state the optimal solution Exercise 1 solution sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
A B C D E F G H I J
Air Express
Min
Shift 1 Shift 2 Shift 3 Shift 4 Shift 5 Shift 6 Shift 7 Req:
Sunday 0 1 1 1 1 1 0 18
Monday 0 0 1 1 1 1 1 27
Tuesday 1 0 0 1 1 1 1 22
Wednesday 1 1 0 0 1 1 1 26
Thursday 1 1 1 0 0 1 1 25
Friday 1 1 1 1 0 0 1 21
Saturday 1 1 1 1 1 0 0 19
Wages/wk: 680 705 705 705 705 680 655
MODEL
Shift 1 Shift 2 Shift 3 Shift 4 Shift 5 Shift 6 Shift 7
#Workers: 6 8.8818E-16 6 0 7 5 9
M i n i m i z e
Total Wages: 22540
Subject to
L H S R H S
Sunday 18 >= 18
Monday 27 >= 27
Tuesday 27 >= 22
Wednesday 27 >= 26
Thursday 26 >= 25
Friday 21 >= 21
Saturday 19 >= 19
Days On = 1, Days Off = 0
Decision Variables:
Solver:
Minimize B22
By Changing B19:H19
Subject to
B26:B32 >= D26:D32
B19:H19 = integer
Options:
Assume Linear Model
Assume Non-negative
0% Tolerance
1000 Iterations
page 8 of 25
Formulas sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
A B C D
Air Express
Days On = 1, Days Off = 0
Shift 1 Shift 2 Shift 3
Sunday 0 1 1
Monday 0 0 1
Tuesday 1 0 0
Wednesday 1 1 0
Thursday 1 1 1
Friday 1 1 1
Saturday 1 1 1
Wages/wk: =655+25*(B5+B11) =655+25*(C5+C11) =655+25*(D5+D11)
MODEL
Decision Variables:
Shift 1 Shift 2 Shift 3
#Workers: 0 0 0
M i n i m i z e
Total Wages: =SUMPRODUCT(B13:H13,B19:H19)
Subject to
L H S R H S
Sunday =SUMPRODUCT(B5:H5,$B$19:$H$19) >= =J5
Monday =SUMPRODUCT(B6:H6,$B$19:$H$19) >= =J6
Tuesday =SUMPRODUCT(B7:H7,$B$19:$H$19) >= =J7
Wednesday =SUMPRODUCT(B8:H8,$B$19:$H$19) >= =J8
Thursday =SUMPRODUCT(B9:H9,$B$19:$H$19) >= =J9
Friday =SUMPRODUCT(B10:H10,$B$19:$H$19) >= =J10
Saturday =SUMPRODUCT(B11:H11,$B$19:$H$19) >= =J11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
E F G H I J
Min
Shift 4 Shift 5 Shift 6 Shift 7 Req:
1 1 1 0 18
1 1 1 1 27
1 1 1 1 22
0 1 1 1 26
0 0 1 1 25
1 0 0 1 21
1 1 0 0 19
=655+25*(E5+E11) =655+25*(F5+F11) =655+25*(G5+G11) =655+25*(H5+H11)
Shift 4 Shift 5 Shift 6 Shift 7
0 0 0 0
page 9 of 25
Programming with binary (0–1) variables To restrict an integer variable to the values 0 and 1 only, add a constraint as follows: 1. Put the address of the decision variable in the lefthand side, 2. Select “bin” where you would normally select a relation ( ≤ , ≥ , = ), 3. The word binary should appear on the righthand side. If nothing appears, then you should
type =binary on the righthand side. The next exercise is an example of a capital budgeting problem, where the decision variable equals 1 when a project is selected and equals 0 otherwise. Exercise 2: In his position as vice president of research and development (R&D) for CRT Technologies, Mark Schwartz is responsible for evaluating and choosing which R&D projects to support. The company received 18 R&D proposals from its scientists and engineers and identified six projects as being consistent with the company’s mission. However, the company does not have the funds available to undertake all six projects. Mark must determine which of the projects to select. The funding requirements for each project are summarized below, along with the expected net present value (NPV) the company expects each project to generate. Expected Capital (Thous $$) Required in: NPV Project (Thous $$) Year 1 Year 2 Year 3 Year 4 Year 5 1 141 75 25 20 15 10 2 187 90 35 0 0 30 3 121 60 15 15 15 15 4 83 30 20 10 5 5 5 265 100 25 20 20 20 6 127 50 20 10 30 40 The company currently has $250,000 available to invest in new projects. It has budgeted $75,000 for continued support for these projects in year 2 and $50,000 per year in years 3, 4, and 5. Which projects should CRT support in order to maximize total expected NPV? • Summarize the problem
page 10 of 25
• Define the decision variables precisely • Completely specify the ILP model • Clearly state the optimal solution
page 11 of 25
Exercise 2 solutions and formulas sheets:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
A B C D E F G H
CRT Tech.
Thousands of Dollars:
Max
Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Avlbl:
Year 1 75 90 60 30 100 50 250
Year 2 25 35 15 20 25 20 75
Year 3 20 0 15 10 20 10 50
Year 4 15 0 15 5 20 30 50
Year 5 10 30 15 5 20 40 50
NPV: 141 187 121 83 265 127
MODEL
Project 1 Project 2 Project 3 Project 4 Project 5 Project 6
Select? 1 0 0 1 1 0
(1=Yes,0=No)
Max im i z e
NPV : 489
Subject to: LHS R H S
Year 1 205 <= 250
Year 2 70 <= 75
Year 3 50 <= 50
Year 4 40 <= 50
Year 5 35 <= 50
Decision Variables:
Maximize B21
By Changing B17:G17
Subject to:
B25:B29 <= D25:D29
B17:G17 = binary
Assume Linear Model
Assume Non-negative
0% Tolerance
1000 Iterations
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
A B C D E F G H
CRT Tech.
Thousands of Dollars:Max
Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Avlbl:Year 1 75 90 60 30 100 50 250
Year 2 25 35 15 20 25 20 75
Year 3 20 0 15 10 20 10 50
Year 4 15 0 15 5 20 30 50
Year 5 10 30 15 5 20 40 50
NPV: 141 187 121 83 265 127
MODELDecision Variables:
Project 1 Project 2 Project 3 Project 4 Project 5 Project 6Select? 0 0 0 0 0 0
(1=Yes,0=No)
Max im i z eNPV : =SUMPRODUCT(B12:G12,B17:G17)
Subject to: LHS R H SYear 1 =SUMPRODUCT(B6:G6,$B$17:$G$17) <= =H6
Year 2 =SUMPRODUCT(B7:G7,$B$17:$G$17) <= =H7
Year 3 =SUMPRODUCT(B8:G8,$B$17:$G$17) <= =H8
Year 4 =SUMPRODUCT(B9:G9,$B$17:$G$17) <= =H9
Year 5 =SUMPRODUCT(B10:G10,$B$17:$G$17) <= =H10
page 12 of 25
The next exercise is an example of a fixed cost problem. It is assumed that the cost of production includes a setup cost (which is a fixed cost) and a variable cost (which is directly related to the quantity produced). The setup cost is only incurred if you choose to produce the product. Products are indexed using i=1, 2, etc. For product i, let 1. Xi equal the number of items produced, 2. Yi equal 1 when the fixed cost is incurred and 0 otherwise, and 3. Mi equal the maximum number that could be produced under given constraints. A constraint of the form Xi ≤ Mi * Yi assures that Yi = 1 when and only when Xi is positive. Exercise 3: Remington Manufacturing is planning its next production cycle. The company can produce three products, each of which must undergo machining, grinding, and assembly operations. The table below summarizes the hours of machining, grinding and assembling required for each unit, and the total hours of capacity available in the next production cycle. Hours Required by: Operation Product 1 Product 2 Product 3 Hours Available Machining 2 3 6 1200 Grinding 6 3 4 600 Assembly 5 6 2 800 Products 1, 2, and 3 have unit profits of $48, $55, and $50, respectively. There are also production line setup costs associated with producing each product. These costs are $1,000 for Product 1, $800 for Product 2, and $900 for Product 3. The marketing department believes it can sell all the products produced. Therefore, the management of Remington wants to determine the most profitable mix of products to produce. • What are the values of M1, M2, and M3?
page 13 of 25
• Define the decision variables precisely • Completely specify the ILP model
page 14 of 25
• Clearly state the optimal solution Exercise 3 solution sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
A B C D E F G
Remington Mfg
Hours:
Max
Product 1 Product 2 Product 3 Avlbl:Machining 2 3 6 1200
Grinding 6 3 4 600
Assembly 5 6 2 800
Unit Profit ($): 48 55 50
Setup charge ($): 1000 800 900
Max #Units: 100 133.333333 150
MODEL
Product 1 Product 2 Product 3#Units: 0 111 66
Setup? 0 1 1
(1=Yes,0=No)
Product Profits: 9405
Fixed Charges: 1700
Max Profit: 7705
Subject to: LHS R H SMachining 729 <= 1200
Grinding 597 <= 600
Assembly 798 <= 800
Product 1 Max 0 <= 0
Product 2 Max 111 <= 133.333333
Product 3 Max 66 <= 150
Decision Variables:
Maximize B24
By Changing B18:D19
Subject to:
B27:B32 <= D27:D32
B18:D18 = integer
B19:D19 = binary
Assume Linear Model
Assume Non-negative
0% Tolerance
1000 Iterations
page 15 of 25
Formulas sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
A B C D E
Remington Mfg
Hours:
Max
Product 1 Product 2 Product 3 Avlbl:Machining 2 3 6 1200
Grinding 6 3 4 600
Assembly 5 6 2 800
Unit Profit ($): 48 55 50
Setup charge ($): 1000 800 900
Max #Units: =MIN(E5/B5,E6/B6,E7/B7) =MIN(E5/C5,E6/C6,E7/C7) =MIN(E5/D5,E6/D6,E7/D7)
MODEL
Product 1 Product 2 Product 3#Units: 0 0 0
Setup? 0 0 0
(1=Yes,0=No)
Product Profits: =SUMPRODUCT(B9:D9,B18:D18)
Fixed Charges: =SUMPRODUCT(B10:D10,B19:D19)
Max Profit: =B22-B23
Subject to: LHS R H SMachining =SUMPRODUCT(B5:D5,$B$18:$D$18) <= =E5
Grinding =SUMPRODUCT(B6:D6,$B$18:$D$18) <= =E6
Assembly =SUMPRODUCT(B7:D7,$B$18:$D$18) <= =E7
Product 1 Max =B18 <= =B12*B19
Product 2 Max =C18 <= =C12*C19
Product 3 Max =D18 <= =D12*D19
Decision Variables:
page 16 of 25
Exercise 4: In the Remington Manufacturing problem, suppose that management does not want to produce a product unless it produces at least 70 units of that product. The sheet below gives the new optimal solution.
• How does the original model change?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
A B C D E
Remington II
Hours:
Max
Product 1 Product 2 Product 3 Avlbl:Machining 2 3 6 1200
Grinding 6 3 4 600
Assembly 5 6 2 800
Unit Profit ($): 48 55 50
Setup charge ($): 1000 800 900
Max #Units: 100 133.333333 150
MODEL
Product 1 Product 2 Product 3#Units: 0 106 70
Setup? 0 1 1
(1=Yes,0=No)
Product Profits: 9330
Fixed Charges: 1700
Max Profit: 7630
Subject to: LHS R H SMachining 738 <= 1200
Grinding 598 <= 600
Assembly 776 <= 800
Product 1 Max 0 <= 0
Product 2 Max 106 <= 133.333333
Product 3 Max 70 <= 150
Product 1 Min 0 >= 0
Product 2 Min 106 >= 70
Product 3 Min 70 >= 70
Decision Variables:
page 17 of 25
Exercise 5: The Martin-Beck Company operates a plant in St. Louis which has an annual production capacity of 30,000 units. The final product is shipped to regional distribution centers located in Boston, Atlanta, and Houston. Because of an anticipated increase in demand, Martin-Beck plans to increase capacity by constructing a new plant in one or more of the following cities: Detroit, Toledo, Denver, Kansas City. The estimated annual fixed cost and the annual capacity for the four proposed plants are as follows:
Proposed Plant Annual Fixed Cost ($) Annual Capacity (units) Detroit 262,500 15,000 Toledo 450,000 30,000 Denver 375,000 30,000 Kansas City 400,000 32,000
The company's long-range planning group has developed the following forecasts of the anticipated annual demand at the distribution centers:
Distribution Center Annual Demand (units) Boston 30,000 Atlanta 20,000 Houston 20,000
The shipping cost ($) per unit from each (proposed) plant to each distribution center is shown in the following table:
to Boston to Atlanta to Houston From Detroit 5 2 3 From Toledo 4 3 4 From Denver 9 7 5 From Kansas City 10 5 2 From St. Louis 8 4 3
Finally, Martin-Beck would like to locate a plant in either Detroit or Toledo, but not both. Martin-Beck would like to determine where to locate the new plant(s) and how much should be shipped from each plant to each distribution center in order to minimize the total annual fixed costs and transportation costs. Notation: Source nodes: 1 Detroit, 2 Toledo, 3 Denver, 4 Kansas City, 5 St Louis Destination nodes: 1 Boston, 2 Atlanta, 3 Houston
page 18 of 25
• Define the decision variables precisely • Completely specify the ILP model
page 19 of 25
• Clearly state the optimal solution Exercise 5 solution sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
A B C D E F G H I J
M a r t i n - B e c k
Annual
Production Fixed
to Boston to Atlanta to Houston Capacity: Cost:
from Detroit 5 2 3 15000 262500
from Toledo 4 3 4 30000 450000
from Denver 9 7 5 30000 375000
from Kansas City 10 5 2 32000 400000
from St. Louis 8 4 3 30000
Demand: 30000 20000 20000
MODEL
Transp. Costs: 320000
Fixed Costs: 662500
Minimize Cost 982500
Setup?
to Boston to Atlanta to Houston (1=Yes,0=No) L H S R H S
from Detroit 15000 0 0 1 15000 <= 15000
from Toledo 0 0 0 6.4835E-17 0 <= 1.9451E-12
from Denver 9.0949E-13 0 0 0 9.0949E-13 <= 0
from Kansas City 0 5000 20000 1 25000 <= 32000
from St. Louis 15000 15000 0 30000 <= 30000
L H S 30000 20000 20000
= = =
R H S 30000 20000 20000
L H S R H S
Detroit/Toledo 1 = 1
Unit Shipping Costs:
Decision Variables:
Minimize B17
By Changing B21:D25, F21:F24
Subject to:
H21:H25 <= J21:J25
B27:D27 = B29:D29
B32 = D32
B21:D25 = integer
F21:F24 = binary
Assume: linear model, non-negative
0% Tolerance
1000 Iterations
page 20 of 25
Formula sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
A B C D E
M a r t i n - B e c k
to Boston to Atlanta to Houston
from Detroit 5 2 3
from Toledo 4 3 4
from Denver 9 7 5
from Kansas City 10 5 2
from St. Louis 8 4 3
Demand: 30000 20000 20000
MODEL
Transp. Costs: =SUMPRODUCT(B5:D9,B21:D25)
Fixed Costs: =SUMPRODUCT(G5:G8,F21:F24)
Minimize Cost =B15+B16
to Boston to Atlanta to Houston
from Detroit 0 0 0
from Toledo 0 0 0
from Denver 0 0 0
from Kansas City 0 0 0
from St. Louis 0 0 0
L H S =SUM(B21:B25) =SUM(C21:C25) =SUM(D21:D25)
= = =
R H S =B11 =C11 =D11
L H S R H S
Detroit/Toledo =F21+F22 = 1
Unit Shipping Costs:
Decision Variables:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
F G H I J
Annual
Production Fixed
Capacity: Cost:
=1.5*10000 =1.5*175000
=1.5*20000 =1.5*300000
=30000 =375000
=0.8*40000 =0.8*500000
30000
Setup?
(1=Yes,0=No) L H S R H S
0 =SUM(B21:D21) <= =F21*F5
0 =SUM(B22:D22) <= =F22*F6
0 =SUM(B23:D23) <= =F23*F7
0 =SUM(B24:D24) <= =F24*F8
=SUM(B25:D25) <= =F9
page 21 of 25
Some modelling tips for binary variables: Suppose that Xi = 1 when a project is chosen and 0 otherwise, for i=1, 2, . . . , n. (1) To choose exactly k of the projects, add the constraint
X1 + X2 + . . . Xn = k . Replace with ≥ when you want k or more projects chosen. Replace with ≤ when you want k or fewer projects chosen. (2) To choose project i only when project j is chosen, add the constraint
Xi = Xj. (3) The conditional constraint
Xi ≤ Xj has the following effect: • If Xi equals 1, then it forces Xj to equal 1. • If Xj equals 0, then it forces Xi to equal 0.
page 22 of 25
Exercise 6: Office Warehouse (OW) has been downsizing its operations. It is in the process of moving to a much smaller location and reducing the number of different computer products it carries. Coming under scrutiny are ten products OW has carried for the past year. For each of these products, OW has estimated the floor space required for effective display, the capital required to restock if the product line is retained, and the short-term loss that OW will incur if the corresponding product is eliminated (through liquidation sales, etc.) Cost to Cost to Floor Product Product Manufactured Liquidate Restock Space Number Line by (thous $) (thous $) (sqr.ft.) 1 Notebook Toshiba 10 15 50 2 Notebook Compaq 8 12 60 3 PC Compaq 20 25 200 4 PC Packard Bell 12 22 200 5 Macintosh Apple 25 20 145 6 Monitor Packard Bell 4 12 85 7 Monitor Sony 15 13 50 8 Printer Apple 5 14 100 9 Printer HP 18 25 150 10 Printer Epson 6 10 125 ("Notebook" refers to a notebook computer.) Office Warehouse wishes to minimize the loss due to the liquidation of product lines subject to the following conditions: (1) At least four product lines will be eliminated. (2) The remaining products will occupy no more than 600 sqr. ft. of floor space. (3) At most $75,000 is to be spent on restocking the product lines. (4) If one product from a particular manufacturer is eliminated, then all products from that manufacturer will be eliminated. (5) At least two of the five computer models (Toshiba NB, Compaq NB, Compaq PC, Packard Bell PC, Apple Macintosh) will continue to be carried by Office Warehouse. (6) If the Toshiba notebook computer is to be retained, then the Epson line of printers will also be retained.
page 23 of 25
• Define the decision variables precisely • Completely specify the ILP model
page 24 of 25
• Clearly state the optimal solution Exercise 6 solution sheet:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
A B C D E F G H I J K
Office Whse
Product Numbers:
1 2 3 4 5 6 7 8 9 10
Line: NB NB PC PC Mac Monitor Monitor Printer Printer Printer
Mfg: Toshiba Compaq Compaq PB Apple PB Sony Apple HP Epson
Liquidation
Cost (thous $): 10 8 20 12 25 4 15 5 18 6
Restock
Cost (thous $): 15 12 25 22 20 12 13 14 25 10
Floor space
(sqr feet): 50 60 200 200 145 85 50 100 150 125
Max Space Min # Max Cost
Used by Computer for
Max # Remaining Models Restocking
Remaining: (sqr ft): Remaining: (thous $):
6 600 2 75
MODEL
1 2 3 4 5 6 7 8 9 10
Keep? 1 0 0 0 1 0 1 1 0 1
(1=Yes,0=No)
M i n i m i z e
L iqu idat ion : 62
Subject to: L H S R H S
#Remaining: 5 <= 6
Space: 470 <= 600
Restocking 72 <= 75
Compaq 0 = 0
PB 0 = 0
Apple 1 = 1
Computers 2 >= 2
If #1, then #10 1 <= 1
Decision Variables:
Minimize B29
By Changing B25:K25
Subject to:
B32:B34 <= D32:D34
B35:B37 = D35:D37
B38 >= D38
B39 <= D39
B25:K25 = binary
Assume: linear model, non-negative
0% Tolerance
1000 Iterations
page 25 of 25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
A B C D
Office Whse
Product Numbers:
1 2 3
Line: NB NB PC
Mfg: Toshiba Compaq Compaq
Liquidation
Cost (thous $): 10 8 20
Restock
Cost (thous $): 15 12 25
Floor space
(sqr feet): 50 60 200
Max Space
Used by
Max # Remaining
Remaining: (sqr ft):
6 600
MODEL
Decision Variables:
1 2 3
Keep? 1 0 0
(1=Yes,0=No)
M i n i m i z e
L iqu idat ion : =SUM(B9:K9)-SUMPRODUCT(B9:K9,B25:K25)
Subject to: L H S R H S
#Remaining: =SUM(B25:K25) <= =B20
Space: =SUMPRODUCT(B14:K14,B25:K25) <= =D20
Restocking =SUMPRODUCT(B12:K12,B25:K25) <= =H20
Compaq =C25 = =D25
PB =E25 = =G25
Apple =F25 = =I25
Computers =SUM(B25:F25) >= =F20
If #1, then #10 =B25 <= =K25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
E F G H I J K
4 5 6 7 8 9 10
PC Mac Monitor Monitor Printer Printer Printer
PB Apple PB Sony Apple HP Epson
12 25 4 15 5 18 6
22 20 12 13 14 25 10
200 145 85 50 100 150 125
Min # Max Cost
Computer for
Models Restocking
Remaining: (thous $):
2 75
4 5 6 7 8 9 10
0 1 0 1 1 0 1