Master Document Index Medium Voltage Control
Ampgard MVC
User Date THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED. Sean
Hobbs 3/3/2017 5:38:22 PM
AY160802X6K1
CLEAR WATER - ML & N Final Drawings
REVISION DWG SIZE G.O. DWG SHEET
4 A LAY0016418-002 A00FEL0M01.DOC 1 of 1
Drawing Description Document Name Rev
1 Master Drawing List A00FEL0M01.DOC 4
2 Certified Production Test Report A00FEL0901.DOC 1
3 OUTLINES AMV1E79-O.DWG 2
4 UNIT SCHEDULE AMV1E79-N.DWG 2
5 Bill of Material AMV1E79-P101.PDF 1
6 SCHEME ASMV1E79S01.DWG 02
7 SCHEME ASMV1E79S02.DWG 03
8 SCHEME ASMV1E79S03.DWG 03
9 SCHEME ASMV1E79S04.DWG 02
10 SCHEME ASMV1E79S05.DWG 02
11 SCHEME ASMV1E79S06.DWG 02
12 SCHEME ASMV1E79S07.DWG 01
13 DIAGRAM AWMV1E79S01.DWG 01
14 DIAGRAM AWMV1E79S02.DWG 01
15 DIAGRAM AWMV1E79S03.DWG 04
16 DIAGRAM AWMV1E79S04.DWG 03
17 DIAGRAM AWMV1E79S05.DWG 01
18 DIAGRAM AWMV1E79S06.DWG 03
19 DIAGRAM AWMV1E79S07.DWG 02
20 DIAGRAM AWMV1E79S08.DWG 01
21 DIAGRAM AWMV1E79S09.DWG 04
22 DIAGRAM ACMV1E79S01.DWG 02
Page: 1 of 1
Certified Production Test Report - Asheville Medium Voltage Control
Tester Date EATON CORPORATION, 221 HEYWOOD ROAD, ARDEN, NC 28704
Jason W Moore
02/28/2017
This certifies that the above is based upon recorded factory tests made at this location.
CLEAR WATER - ML & N Certified Test Report
REVISION DWG SIZE G.O. DWG SHEET
1 A LAY0016418-002 A00FEL0901 1 of 1
CERTIFICATION Production tests performed in accordance with UL347, Par. 5.3, NEMA ICS3, and Eaton ISO 9000 certified Work
Instructions for Medium Voltage Control Inspection and Testing, as follows:
TEST PASSED N/A
Style check per shop order Bill-of-Material (WI# AMP039A) X
Wiring checked per schematics and wiring diagrams (WI# AMP039B) X
Electrical connections checked to be proper and tight X
General appearance X
Electrical clearance X
Dielectric Test @ HV 2.25 x Rated Voltage + 2000 Volts (WI# AMP040A, B C as required) X
Unit Sequence - per schematic X
Contactors - checked for operation X
Mechanical interlock checked for proper operation X
Relays - checked for proper operation X
Meters - checked for proper operation X
Resistor(s) - checked for proper operation X
Transformer Ratio - verified X
Page: 1 of 1
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 1 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 2 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 3 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 4 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 5 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 6 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 1 of 2
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 2 of 2
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
1 OF 7
Customer BOMOSWEGO METROPOLITIAN WATER BOARD
MVC - MVC AmpgardGO-Item: LAY0016418-002
Material Information By: SEAN HOBBSGenerated: 1/19/2017
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
2 OF 7
CONSOLIDATED PARTS
DESCRIPTION PART NUMBER QTY MARKING
PLC ROCKWELL 1766-L32AWAA 04-12134-1 1
PLC ROCKWELL 1762-OW8 04-12135-2 1
PLC ROCKWELL 1762-OF4 04-12135-3 1
GE 869EP5P5B5HRRALNGMSBB1ECNAN 10-10464-19 1
RELAY TECSYSTEM 1CN0136 10-10641-3 1
100/5 CURRENT TRANSF 3 PHASE 151B554H01 1
300/5 CURRENT TRANSF 3 PHASE 151B554H05 1
CAPACITOR;SURGE,DUAL2400/4160V 18L15WH 1
SHORT CIR T BLK OPTION 1 1A48791G01 1
PRI FUSE KIT 5KV 0.81 DIA FUSE 2147A11G49 1
PB,E34 RED FLUSH W/1NC CNT 25A4124G01 1
PB,E34 BLK FLUSH W/1NO CNT BLK 25A4124G05 3
PB,E34 EM STOP PUSH/PULL 2NC 25A4124G11 1
SWITCH,E34 2POS LVR (2)1NO-1NC 25A4124G21 1
SWITCH,E34 3POS LVR (2)2NO CNT 25A4124G26 1
LIGHT,E34 GRN RES INCD120VACDC 25A4125G07 3
LIGHT,E34 RED RES INCD120VACDC 25A4125G08 1
LIGHT,E34 AMB RES INCD120VACDC 25A4125G10 4
DIODE ASSY 3 AMP 1000 VOLT 2A97152G01 1
RELAY, 120VAC, 2N0-2NC 2A98239G01 22
RELAY, 120VAC, 3N0-1NC 2A98239G02 5
RELAY, 120VAC, 4N0-0NC 2A98239G03 2
RELAY, 120VAC, 4N0-4NC 2A98239G04 1
RELAY, 120VAC, 6N0-2NC 2A98239G05 1
RELAY, 125VDC, 3N0-1NC 2A98239G14 1
FUSE,W/BLK 250V DIN/PL (1) 1A 2A98257G01 3
FUSE,W/BLK 250V DIN/PL(1) 3.2A 2A98257G03 2
FUSE,W/BLK 250V DIN/PL(1) 15A 2A98257G10 1
FUSE,W/BLK 250V DIN/PL(2) 1A 2A98257G21 1
PLUG + RECP,ASSY 125V 2A98269G03 1
THERM & BOX W/O THERMOMETER 3475C49G02 1
ARRESTER 6KV 3492C62H22 3
FUSEBLOCK, PULL, 2P 36C1027H02 4
COMMUNUCA BELDEN EY6F201006012 43-368-12 2
COMMUNUCA BELDEN EY6F201006003 43-368-3 1
COMMUNUCA BELDEN EY6F201006006 43-368-6 1
SENSOR; GRD FAULT CT 50/5 5264C10H11 2
5KV 390A 18R BOLT IN FUSE 54A1311G19 1
HEATER 250V 375W 7497A69H04 2
TRANSFORMER; CT 200/5 7526A81G01 3
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
3 OF 7
CONSOLIDATED PARTS
DESCRIPTION PART NUMBER QTY MARKING
SWITCH; TEST 8156A40H76 1
ADAPTAHORN 870N5 1
400A ISO SW BOLTED FUSES W/ 87C0520G08 1
AMPGARD REMOTE OPERATOR 87C0576 1
SWIT BELDEN SPIDERII8TX/1FXEEC 90-29338-2 1
ALLEN BRADLEY 2711PT10C21D8S 99-6438-3 1
C2000VA4160/120V,60H,1W,60,24 C20E1D1F2 1
C-H D26 RELAY, 4P, 120VAC COIL D26MBA 4
D26 CONTACT N.C. LATE OPEN D26MPL 8
D26 CONTACT N.O. EARLY CLOSE D26MPS 8
ABB FT-14 SWITCH FT4A14T06CN4068 1
FUSE:BUSS, 1A, 300VDC LP-CC-1 6
FUSE:BUSS, 8A, 150VDC LP-CC-8 2
POWER SUPPLY,24V,10A,120V,I/P PSG240E 1
3 PH PT, 35, 60, 60 PT3E0F6 1
BRKR,CKT 1POLE DIN MTD 10A QCR1010 1
CONTACTOR 400A SL72B4SH3LANL5MNR25
1 1012
CONTACTOR 400A SL72B4SH3LANL5RNR25 1 1013
UNIV TIMER TRL27 13
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
4 OF 7
VERTICAL SECTION 1
DESCRIPTION PART NUMBER QTY MARKING
CAPACITOR;SURGE,DUAL2400/4160V 18L15WH 1
ARRESTER 6KV 3492C62H22 3
HEATER 250V 375W 7497A69H04 1
TRANSFORMER; CT 200/5 7526A81G01 3
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
5 OF 7
VERTICAL SECTION 2
DESCRIPTION PART NUMBER QTY MARKING
GE 869EP5P5B5HRRALNGMSBB1ECNAN 10-10464-19 1
RELAY TECSYSTEM 1CN0136 10-10641-3 1
100/5 CURRENT TRANSF 3 PHASE 151B554H01 1
300/5 CURRENT TRANSF 3 PHASE 151B554H05 1
SHORT CIR T BLK OPTION 1 1A48791G01 1
PRI FUSE KIT 5KV 0.81 DIA FUSE 2147A11G49 1
PB,E34 BLK FLUSH W/1NO CNT BLK 25A4124G05 1
PB,E34 EM STOP PUSH/PULL 2NC 25A4124G11 1
LIGHT,E34 GRN RES INCD120VACDC 25A4125G07 2
LIGHT,E34 RED RES INCD120VACDC 25A4125G08 1
LIGHT,E34 AMB RES INCD120VACDC 25A4125G10 2
RELAY, 120VAC, 2N0-2NC 2A98239G01 6
RELAY, 120VAC, 3N0-1NC 2A98239G02 2
RELAY, 120VAC, 4N0-4NC 2A98239G04 1
FUSE,W/BLK 250V DIN/PL (1) 1A 2A98257G01 3
FUSE,W/BLK 250V DIN/PL(1) 15A 2A98257G10 1
FUSE,W/BLK 250V DIN/PL(2) 1A 2A98257G21 1
PLUG + RECP,ASSY 125V 2A98269G03 1
THERM & BOX W/O THERMOMETER 3475C49G02 1
COMMUNUCA BELDEN EY6F201006012 43-368-12 2
SENSOR; GRD FAULT CT 50/5 5264C10H11 2
5KV 390A 18R BOLT IN FUSE 54A1311G19 1
HEATER 250V 375W 7497A69H04 1
SWITCH; TEST 8156A40H76 1
ADAPTAHORN 870N5 1
400A ISO SW BOLTED FUSES W/ 87C0520G08 1
C2000VA4160/120V,60H,1W,60,24 C20E1D1F2 1
C-H D26 RELAY, 4P, 120VAC COIL D26MBA 4
D26 CONTACT N.C. LATE OPEN D26MPL 8
D26 CONTACT N.O. EARLY CLOSE D26MPS 8
ABB FT-14 SWITCH FT4A14T06CN4068 1
3 PH PT, 35, 60, 60 PT3E0F6 1
CONTACTOR 400A SL72B4SH3LANL5MNR25
1 1012
CONTACTOR 400A SL72B4SH3LANL5RNR25 1 1013
UNIV TIMER TRL27 6
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
6 OF 7
VERTICAL SECTION 3
DESCRIPTION PART NUMBER QTY MARKING
PLC ROCKWELL 1766-L32AWAA 04-12134-1 1
PLC ROCKWELL 1762-OW8 04-12135-2 1
PLC ROCKWELL 1762-OF4 04-12135-3 1
PB,E34 RED FLUSH W/1NC CNT 25A4124G01 1
PB,E34 BLK FLUSH W/1NO CNT BLK 25A4124G05 2
SWITCH,E34 2POS LVR (2)1NO-1NC 25A4124G21 1
SWITCH,E34 3POS LVR (2)2NO CNT 25A4124G26 1
LIGHT,E34 GRN RES INCD120VACDC 25A4125G07 1
LIGHT,E34 AMB RES INCD120VACDC 25A4125G10 2
DIODE ASSY 3 AMP 1000 VOLT 2A97152G01 1
RELAY, 120VAC, 2N0-2NC 2A98239G01 16
RELAY, 120VAC, 3N0-1NC 2A98239G02 3
RELAY, 120VAC, 4N0-0NC 2A98239G03 2
RELAY, 120VAC, 6N0-2NC 2A98239G05 1
RELAY, 125VDC, 3N0-1NC 2A98239G14 1
FUSE,W/BLK 250V DIN/PL(1) 3.2A 2A98257G03 2
FUSEBLOCK, PULL, 2P 36C1027H02 4
COMMUNUCA BELDEN EY6F201006003 43-368-3 1
COMMUNUCA BELDEN EY6F201006006 43-368-6 1
SWIT BELDEN SPIDERII8TX/1FXEEC 90-29338-2 1
ALLEN BRADLEY 2711PT10C21D8S 99-6438-3 1
FUSE:BUSS, 1A, 300VDC LP-CC-1 6
FUSE:BUSS, 8A, 150VDC LP-CC-8 2
POWER SUPPLY,24V,10A,120V,I/P PSG240E 1
BRKR,CKT 1POLE DIN MTD 10A QCR1010 1
UNIV TIMER TRL27 7
ISSUED FOR CONSTRUCTION - THE INFORMATION ON THIS DOCUMENT IS SUITABLE FOR USEIN ESTABLISHING FINAL INSTALLATION AND CONSTRUCTION DETAILS.
DFTR DATE
SEAN HOBBS 1/19/2017THE INFORMATION ON THIS DOCUMENT IS CREATED BY EATONCORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND ISONLY TO BE USED FOR THE PURPOSE IN WHICH IT IS SUPPLIED.
APPD DATE
SEAN HOBBS 1/19/2017
TITLE OSWEGO METROPOLITIAN WATER BOARDCLEAR WATER - ML & N
S.O.
AMV1E79TYPE
MVC AMPGARDCUSTOMER
BOMPRODUCT CODE
OACAGE CODE
68592REVISION
2 AG.O.
LAY0016418-002DWG
AMV1E79-P101SHEET
7 OF 7
SHIP LOOSE PARTS
DESCRIPTION PART NUMBER QTY MARKING
AMPGARD REMOTE OPERATOR 87C0576 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
Master Document Index Medium Voltage Control
Ampgard MVC
User Date THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED. Sean
Hobbs 3/3/2017 5:39:15 PM
AY160802X6K1
RAW WATER - ML & N1 Final Drawings
REVISION DWG SIZE G.O. DWG SHEET
3 A LAY0016418-004 A00FEY9M01.DOC 1 of 1
Drawing Description Document Name Rev
1 Master Drawing List A00FEY9M01.DOC 3
2 Certified Production Test Report A00FEY9901.DOC 1
3 OUTLINES AMV1E80-O.DWG 2
4 UNIT SCHEDULE AMV1E80-N.DWG 2
5 SCHEME ASMV1E80S01.DWG 01
6 SCHEME ASMV1E80S02.DWG 02
7 SCHEME ASMV1E80S03.DWG 02
8 SCHEME ASMV1E80S04.DWG 01
9 SCHEME ASMV1E80S05.DWG 01
10 SCHEME ASMV1E80S06.DWG 01
11 SCHEME ASMV1E80S07.DWG 01
12 DIAGRAM AWMV1E80S01.DWG 01
13 DIAGRAM AWMV1E80S02.DWG 01
14 DIAGRAM AWMV1E80S03.DWG 03
15 DIAGRAM AWMV1E80S04.DWG 03
16 DIAGRAM AWMV1E80S05.DWG 01
17 DIAGRAM AWMV1E80S06.DWG 03
18 DIAGRAM AWMV1E80S07.DWG 02
19 DIAGRAM AWMV1E80S08.DWG 01
20 DIAGRAM AWMV1E80S09.DWG 04
21 DIAGRAM ACMV1E80S01.DWG 02
Page: 1 of 1
Certified Production Test Report - Asheville Medium Voltage Control
Tester Date EATON CORPORATION, 221 HEYWOOD ROAD, ARDEN, NC 28704
Jason W Moore
02/28/2017
This certifies that the above is based upon recorded factory tests made at this location.
RAW WATER - ML & N1 Certified Test Report
REVISION DWG SIZE G.O. DWG SHEET
1 A LAY0016418-004 A00FEY9901 1 of 1
CERTIFICATION Production tests performed in accordance with UL347, Par. 5.3, NEMA ICS3, and Eaton ISO 9000 certified Work
Instructions for Medium Voltage Control Inspection and Testing, as follows:
TEST PASSED N/A
Style check per shop order Bill-of-Material (WI# AMP039A) X
Wiring checked per schematics and wiring diagrams (WI# AMP039B) X
Electrical connections checked to be proper and tight X
General appearance X
Electrical clearance X
Dielectric Test @ HV 2.25 x Rated Voltage + 2000 Volts (WI# AMP040A, B C as required) X
Unit Sequence - per schematic X
Contactors - checked for operation X
Mechanical interlock checked for proper operation X
Relays - checked for proper operation X
Meters - checked for proper operation X
Resistor(s) - checked for proper operation X
Transformer Ratio - verified X
Page: 1 of 1
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 1 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 2 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 3 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 4 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 5 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 6 of 6
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 1 of 2
THE INFORMATION ON THIS DOCUMENT WAS CREATED BY EATON
CORPORATION. IT WAS DISCLOSED IN CONFIDENCE AND IS ONLY
Issued ForConstruction
The information on this
document is suitable for
use in establishing final
installation and
construction details.
TO BE USED FOR THE PURPOSE IN WHICH IT WAS SUPPLIED.
Page: 2 of 2
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
The information on this
document is suitable for
use in establishing final
installation and
construction details.
The information on this
document is suitable for
use in establishing final
installation and
construction details.
Page: 1 of 1
Top Related