Betty Day
2 ERCOT Board of Directors March 22, 2011
SummaryRetail Activity• Overall Activity – Activity continues to follow recent trends. A Mass Transition occurred during February; 99.75% of the customer transitions were
complete within 2 days and all transitions were complete within 5 days.• Transaction Performance Measures – Generally good performance in February. One system issue did cause some measures to fall below the
98% target.• Advanced Metering – Over 2.4M ESIIDs are now settled using advanced meter data with around 99% having actual data available for initial
settlement.
Wholesale Activity • Settlements & Billing Performance – Perfect performance in February.• Settlement Dollars – Excluding the extreme weather event, the average dollars transacted were similar to prior months since go-live (around $7M).
The extreme weather days averaged around $65M with the highest day (2/2/11) at $190M.• Reliability Services – February RUC Make Whole Payments to generators were much higher than seen in prior months, but were offset by even
higher RUC Clawback Charges which resulted from the high prices on the cold weather days. • Capacity Services – due to the weather events, capacity service costs for February were substantially higher with the most dramatic increases in
Responsive Reserve and Non-Spinning Reserve.• Congestion Management – Due to the weather events, congestion payments for February were substantially higher than prior months, totaling over
$80M• Verifiable Costs – Approximately half of the available capacity is supported by approved verifiable costs.• DAM Resettlement - ERCOT resettled the DAM for 2/8/2011. The resettlement was necessary to achieve revenue neutrality in the Balancing
Account Closure process because of a procedure failure in ensuring that the 2/8 RTM Settlement Point Price corrections were used by the 2/8 DAM Settlements.
• Market Short-pay - Multiple RTM Invoice short-payments by Abacus Resources Energy LLC causing partial payments to the market. To-date, the total Abacus short-payment is in the amount of $731,420. The default uplift to the market will occur no earlier than September 2011.
• Market Extracts and Reports – Over 1.7M extracts/reports posted during February; over 15.6M extracts/reports downloaded• Disputes – Dispute volumes have increased somewhat but continue to be lower than anticipated.• REPs and QSEs Added/Terminated
– 1 new REPs – 3 terminated REP– 2 new QSEs – 1 terminated QSEs
3
Overall Activity
Transaction TypeSwitches 115,861
Move - Ins 318,528
Move Out
CSA 39,192
Total 641,199
Since June 1, 2001 41,022,791
Retail Transactions Summary
02/28/2011104,467
329,894
69,842
682,929
02/28/201053,219
161,509
78,127
17,870
317,916
2011 52,663
162,765
83,829
30,503
329,760
2010YTD February
160,427 178,726
Mass Transition 7,191 0 7,191 0(Continuous Service Agreement)
ERCOT Board of Directors March 22, 2011
4
Retail Transactions SummarySwitches Move-Ins
Move-Outs Mass Transition
ERCOT Board of Directors March 22, 2011
5
Retail Performance Measures – 2011 Switch 1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
ERCOT Board of Directors March 22, 2011
6
1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
Retail Performance Measures – 2011 Move-In / Priority
ERCOT Board of Directors March 22, 2011
7
1st Quarter 2nd Quarter
3rd Quarter 4th Quarter
Retail Performance Measures – 2011 Move-In / Standard
ERCOT Board of Directors March 22, 2011
8
Migration from Native Affiliate REP
March 22, 2011 ERCOT Board of Directors
Residential
Small Non-Residential
Large Non-Residential
% of ESI IDs% of Load 1
at1/31/11
at1/31/11
at1/31/10
1 - Percent of Deregulated (Non-NOIE) ESI IDs and Load. Usage based on monthly settlement results.
49%
56%
77%
53%
60%
79%
55%
83%
78%
at1/31/10
50%
79%
76%
9 ERCOT Board of Directors March 22, 2011
Advanced Meter Settlement
Now settling almost 2.5M ESIIDs with Advanced Meter Data
Data loading issues for one TSP resulted in a reduced amount of actual data available for settlement on 2/17/11
10
Settlements and Billing Performance Measures – February 2011
ERCOT Board of Directors March 22, 2011
To Date February02/28/11 2011
Settlement Statements:Zonal 27,881 5,111Day Ahead Market 16,129 5,181Real Time Market 22,200 11,526Total 66,210 21,818Late 0 0Balance 66,210 21,818% Within Protocol 100.00% 100.00%
Invoices:Zonal 2,436 720Day Ahead Market 16,129 5,181Real Time Market 2,210 660
CRR Auction
234
85
Balancing Account
346
172 CRR Auction Revenue Disbursement (CARD)
200
99
Total
21,555
6,917
Late
-
-
Balance
21,555
6,917 % Within Protocol 100% 100%
11
February 2011 Market Total Settlement Dollars
March 22, 2011 ERCOT Board of Directors
Totals represent the total charges to QSEs and CRRAHs for each Operating Day
12
Reliability Services
March 22, 2011 ERCOT Board of Directors
February2011
($'s in millions)Reliability Unit Commitment
• Make Whole Payments ($5.53)
• Claw Back Charges $7.93
Total Reliability Unit Commitment $2.40
• Capacity Short Charges $5.53
• Make Whole Uplift $0.00
• RUC Decommitment Payments $0.00
Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant
13
Capacity Services - Cost
March 22, 2011 ERCOT Board of Directors
February February
2010 2011
Capacity Services**: ($'s in millions) ($'s in millions)
Reg Up $5.3 $14.5
Reg Down $7.0 $4.8
Responsive Reserve $9.6 $50.0
Non-Spinning Reserve $4.3 $40.1
Black Start $0.4 $0.4
RMR Capacity* $0.5 $0.0
Voltage Services - Reactive Power n/a $0.0
Voltage Services - Lost Opportunity n/a $0.0
TOTAL CAPACITY SERVICES $27.1 $109.8
* Includes Stand-by, Energy, and Non-Performance**Includes Day-Ahead Market and Supplementary Ancillary Service Markets
14
Capacity Services - Volumes
March 22, 2011 ERCOT Board of Directors
Reg Up*: February 2010 February 2011 Required (MW) 557,712 330,123 Self Arranged (MW) 108,424 8,376 Procured DAM (MW) 321,747 Procured RTM (MW) - Failure to Provide (MW) 60 Total Procured 450,876 321,747 % Procured 81% 97%Reg Down*: Required (MW) 621,291 324,827 Self Arranged (MW) 128,575 17,028 Procured DAM (MW) 307,800 Procured RTM (MW) 1,524 Failure to Provide (MW) 1,571 Total Procured 494,285 309,324 % Procured 80% 95%Responsive Reserve: Required (MW) 1,543,517 1,545,507 Self Arranged (MW) 575,224 286,064 Procured DAM (MW) 1,259,443 Procured RTM (MW) 1,326 Failure to Provide (MW) 2,891 Total Procured 970,376 1,260,769 % Procured 63% 82%Non-Spinning Reserve: Required (MW) 1,232,447 1,344,003 Self Arranged (MW) 154,358 28,944 Procured DAM (MW) 1,315,059 Procured RTM (MW) 1,410 Failure to Provide (MW) 89 Total Procured 1,080,218 1,316,469 % Procured 88% 98%
*A/S Methodology changed in Dec 2010
15
Energy Settlement
March 22, 2011 ERCOT Board of Directors
February 2011 ($'s in millions)
• Day Ahead Market Energy SettlementEnergy Purchases $470.28 Point to Point Obligations Purchases $38.85 RMR Day Ahead Revenue $0.00 Energy Sales ($443.60) Day Ahead Congestion Rent $65.53
Day Ahead Make Whole Payments ($0.09)
• Real Time Market Energy SettlementReal Time Energy Imbalance ~Resource Node Settlement Points ($1,107.15)~Load Zone Settlement Points $1,509.25 ~ Hub Settlement Points ($285.09)Real Time Congestion from Self Schedules $11.50 Block Load Transfers and DC Ties ($24.52)Energy Settlements Impact to Revenue Neutrality $103.99
Emergency Energy Payments ($0.43)Base Point Deviation $2.51
(MWh in millions)Real Time Metered Generation 23.49
Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant
16
Congestion Management
March 22, 2011 ERCOT Board of Directors
February 2011
($'s in millions)Auction DisbursementsAnnual Auction $0.00 Monthly Auction ($14.98)Total Disbursements ($14.98)
CRR SettlementDay Ahead CRR Settlement ($60.70)Day Ahead CRR Short Charges $6.24 Day Ahead CRR Short Charges Refunded ($6.24)Real Time CRR Settlement ($19.56)Real Time CRR Short Charges $0.64 Real Time CRR Short Charges Refunded ($0.64)Total Proceeds ($80.26)
PTP Obligations Acquired in DAMDay Ahead Point to Point Obligation Settlement $38.85 Real Time Point To Point Obligation Settlement ($84.49)Net Settlement ($45.64)
Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant
17
Net Impact to Load
March 22, 2011 ERCOT Board of Directors
February 2011
($'s in millions)
Market-Based Fees Auction Disbursements ($14.98) Balancing Account Proceeds ($4.82) Net Reliability Unit Commitment ($2.40) Capacity Services* $109.81 Real Time Revenue Neutrality $0.05 Emergency Energy Payments $0.43 Base Point Deviation Charge ($2.51) ERCOT Fees ERCOT Administrative Fee $9.90 Net Impact to Load $95.46
* RMR included in Capacity Services
Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant
18
Revenue Neutrality
ERCOT Board of Directors March 22, 2011
19
Market Based Fees
ERCOT Board of Directors March 22, 2011
20
Daily DAM and RTM Activity
ERCOT Board of Directors March 22, 2011
21
Verifiable Costs
March 22, 2011 ERCOT Board of Directors
22
Extract & Report Postings
ERCOT Board of Directors March 22, 2011
TOTAL POSTINGS TOTAL FILE SIZE (GB)1,721,153 158.51
Market Extract & Report PostingsRun on Mar 7, 2011 5:13:30 PM
Start Date: Feb 1, 2011End Date: Feb 28, 2011
Posting Classifications:Certified = Available only to the Market Participant owning that dataSecure = Available to any Market Participant with a digital certificatePublic = Available to all Market Participants & general public (via ERCOT.com)
23
Extract & Report Postings
ERCOT Board of Directors March 22, 2011
Top 10 Market Extract & Report Postings Run on Mar 7, 2011 5:36:39 PM
Start Date: Feb 1, 2011End Date: Feb 28, 2011
PUBLISH COUNT
24
Extract & Report Downloads
ERCOT Board of Directors March 22, 2011
Market Extract & Report DownloadsRun on Mar 7, 2011 4:32:21 PM
Start Date: Feb 1, 2011End Date: Feb 28, 2011
TOTAL DOWNLOADS TOTAL FILE SIZE (GB)15,653,190 1,180.01Posting Classifications:
Certified = Available only to the Market Participant owning that dataSecure = Available to any Market Participant with a digital certificatePublic = Available to all Market Participants & general public (via ERCOT.com)
25
Extract & Report Downloads
ERCOT Board of Directors March 22, 2011
Top 10 Market Extract & Report DownloadsRun on Mar 7, 2011 5:34:30 PM
Start Date: Feb 1, 2011End Date: Feb 28, 2011
DOWNLOAD COUNT
26
ERCOT Wholesale Market Settlement Dispute Report
ERCOT Board of Directors March 22, 2011
CRR Market Day-Ahead Mkt Real Time Mkt
Current Month*
SinceDec 1, 2010
Current Month*
SinceDec 1, 2010
Current Month*
SinceDec 1, 2010
Received 13 13 10 46 80 151
Granted 0 0 0 0 3 6
Granted w/Exception 0 0 0 0 1 2
Denied 12 12 17 30 3 16
In Process 1 1 16 16 127 127
February 2011
*Some current month activity is on disputes that were received in prior months.
27
REPs and QSEs Added/Terminated – as of February 28, 2010
• Added REPs • Added QSEs Entrust Energy Inc. (LSE)
• Terminated REPs • Terminated QSEs Abacus Resources Energy LLC (LSE) Abacus Resources Energy LLC dba
Abacus Resources Energy (LSE) Mpower Retail Energy LP (LSE)
Abacus Resources Energy LLC (QSE – L2)
ERCOT Board of Directors March 22, 2011
Levels of QSE QualificationQSE without Resources:Level 1: Qualified to perform Inter-QSE trades only; does not have direct representation of Load Serving Entities or Resource Entities.Level 2: Qualified to represent Load serving Entities; does not have direct representation of Resource Entities.QSE with Resources Level 3: Qualified to represent Load Serving Entities and/or Resource Entities without providing Ancillary Services; may also perform QSE without Resources activities. QSE with Resources-AS Qualified Level 4: Qualified to represent Load Serving Entities and/or Resource Entities and provide Ancillary Services; may also perform level QSE without Resources activities.
Met Texas Virtual LP (QSE – L1) Envapower Inc. (QSE – L1)