What is Cured-In-Place Pipe (CIPP)
A resin saturated fabric linerthat is installed into adeteriorated pipeline and then
cured using Heat , Ambient orUltra Violet Light
WITHOUTEXCAVATION
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
3/39
What is Folded Pipe (FP)A factory manufactured
pipe that is folded foreasy delivery in coilsthen reheated andinstalled into an existingpipeline
WITHOUTEXCACATION
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
4/39
Where Can CIPP or Folded Pipe BeUsed?
Municipal sewers, laterals,
water mains and drainagepipes, outfall pipes, forcemains, etcIndustrial, sewer ,water,drainage, gas mains,process pipes,downspouts, air vents
Highway & railroadculvertsOther piping systems
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
5/39
Pipeline Solutions With CIPPStructural renewal
Structural reinforcementInfiltration reductionInflow reduction
of..M.H. M.H. Lining
Lateral pipe lining
Sectional Lining
Sizes 4-120
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
6/39
Pipeline Solutions With Folded PipeStructural renewal
Structural reinforcementInfiltration reductionInflow reduction
of..M.H. M.H. Lining
Sizes 4-24
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
7/39
ResinsPolyester Vinyl Ester Epoxy
Liner FabricFiberglass Carbon Fiber Kevlar
Installation
Typical CIPP Liner MaterialsMaterials
CoatingsUrethane Polyethylene PVC
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
8/39
The Cured CIPP Product
The typical product consists
of either a polyester fabric,fiberglass or combinationliner saturated with either apolyester, vinylester orepoxy thermoset resin.The product can be curedusing hot water, steam,
ultra-violet light or ambienttemperatures
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
9/39
Typical CIPP Thermoset ResinsEpoxy
Vinyl Ester
Polyester
PolyesterMost common for typicalsewer applications
Vinyl esterIndustrial or special wasteapplications
Higher corrosion resistancePressure applications
EpoxyIndustrial & potable water
applicationsPressure applicationsHigher temperatureapplications
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
10/39
Polyester Fabric Liner Preparation
A felt liner is fabricated of polyester needled, woven or knitfabric and coated with an impervious film such as polyethylene,polyurethane or PVC. Just prior to installation, the fabric liner issaturated with a heat activated resin using a vacuum impregnationprocess. All excess resin is removed by pulling the liner through aspecially designed set of rollers. The saturated liner can be storedin a refrigerated truck for several days until installation into the
host pipe.
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
11/39
Polyester Fabric Resin Impregnation
A Vacuum is created onthe custom manufacturedliner to remove air and toensure thorough resindistribution
Resin, with dye, ispumped into the liner anddisplaces the evacuated airsaturating the inside of theliner
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
12/39
Fiberglass Liner PreparationFiberglass Liners are manufactured several ways:
1. A liner is fabricated of a specially designed fiberglassmaterial and encased in impervious film such aspolyethylene, polyurethane or PVC. The fiberglassliner is saturated with either a heat activated or UVLight activated resin. All excess resin is removed bypulling the liner through a specially designed set ofrollers
2. UV Light activated resin is saturated into the rawfiberglass material then spirally wound into a roundtube. No vacuumimpregnation is required
3. UV Light activated resinfiberglass liners typicallyhave an extended shelf lifeof up to six (6) monthswithout refrigeration
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
13/39
Typical Folded Pipe MaterialsFolded Pipe material are thermoplastic in nature. The
material can typically be re-heated several times toaccommodate installation into an existing pipelineMaterials include:High Density Polyethylene (HDPE)Modified Polyvinyl Chloride (PVC) Type #1Polyvinyl Chloride (PVC) Type #2
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
14/39
Folded Pipe (HDPE)
Typically manufacturedTypically manufacturedin ain a UU shape 4shape 4 to 24to 24 and in some cases largerand in some cases largerCoiled on large verticalCoiled on large verticaldrumsdrumsReferences ASTM FReferences ASTM F --1533, ASTM F1533, ASTM F --16061606
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
15/39
Folded Pipe (PVC) Type #1
PVC Based ProductsPVC Based ProductsType #1Type #1Reference ASTM FReference ASTM F --
1504 & F1504 & F --1947194744 to 15to 15 diametersdiameters
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
16/39
Folded Pipe (PVC) Type #2
PVC Based ProductsPVC Based ProductsType #2Type #2Reference ASTM FReference ASTM F --1871 & F1871 & F --1867186744 to 24to 24 and largerand larger
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
17/39
Cured-In-Place Pipe (CIPP) &Folded Pipe (FP)
Typical Project Execution
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
18/39
CIPP & Folded Pipe TechnologyRequirements
The liner materials must be designed
and selected for the specificapplication (sewer, water, industrial,etc)The installer must be experienced inthe technology (minimum number ofinstallations, years of experience, etc))Installation technique and equipmentspecific to the technology and curingtechnique applied (equipment should
be integral part of technology)The Installed product must be testedand certified to meet the specificationrequirements
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
19/39
Pre-Project Data CollectionDocument size, length and condition ofline(s) (using PACP standards)Document pipe material(s)Document size change(s) within a linesectionVerify line and grade of pipeIdentify necessary pipe repairs to bedone before liner installationIdentify all infiltration into the pipe andrepair major leaks or install a pre-linerDetermine peak flow volumes in pipe
Determine traffic maintenancerequirementsIdentify all service connections as activeor inactive
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
20/39
Lateral Connection Identification
Quantity to be reinstatedLocations to be documentedAbandoned servicesidentified
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
21/39
Pre-Installation ConsiderationsEquipment staging area isrequired at or near accessmanholeThe existing pipe must be pre-televised and surveyed todetermine its condition
Some excavation may berequired for larger diameterliners or for point repairsAll existing flows in the pipe
must be plugged or by-passedThe existing pipe must becleaned to remove ALL debris,silt, roots, sand, etc
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
22/39
The resin impregnated tube is either inverted, using
air or water pressure or pulled into the old pipethrough the existing access or manhole structure
Heat Cured CIPP Liner Installation
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
23/39
CIPP Curing with Hot Water
Boiler Truck
CirculationPump
Once in place and properly inflated the liner iscured using hot water heat. Cure temperatures are
monitored at access points and at each end of theinstallation
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
24/39
CIPP Curing With SteamOnce in place and properly inflated the liner is curedusing steam heat . Cure temperatures are monitored
at access points and at each end of the installation
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
25/39
U V Light Cured Liner InstallationA fiberglass liner is pulled into the host pipe. A lighttrain & CCTV is inserted in one end and pulled to the
opposite end recording the pre-cure condition of theliner. The light train is then pulled back through theinside of the liner, at a regulated speed, with theCCTV camera recording the actual curing of theliner.
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
26/39
CIPP Curing With Ultra-Violet Light
Once in place and inflated the liner is cured using ultra
Violet Light. Infrared sensors record the entire liner cure
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
27/39
Folded Pipe Liner Installation
Folded pipe is pulled intothe existing pipeThe pipe is then heated
and unfolded to fit tightlywithin the existing pipeSteam is typically used toprocess to liner
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
28/39
Folded Pipe Processing With SteamFolded Pipes are typically re-heated, to various
degrees, to accommodate installation requirementsSteam and pressure are typically used to expandand process the pipe to fit tight within the existingpipe
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
29/39
Manhole Termination
ExistingPipe
Pipe Seal
New CIPPPipe
A seal can beinstalled between thenewly installed linerand the existing pipeto preventgroundwatermigration into themanhole.
Seals can be eitherhydrophilic or grout
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
30/39
Installed CIPP or Folded Pipe
The installed pipe shouldbe free of wrinkles orother defects that willprevent the proper
operation of the pipelineThe installed pipeshould have theprojected longevity asspecified
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
31/39
Lateral Re-Connection
Lateral Connection Dimple
Identify lateral connection dimplesfrom CCTV inspection and/or pre-
liner installation measurementCut opening each live lateralconnectionLeave each abandoned connection
closed as directed by the customer
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
32/39
Post Installation Documentation
The thickness of the liner ismeasuredThe physical properties of theinstalled material are testedThe chemical resistanceverified
The water tightness is verifiedThe physical appearance isrecorded
The specified design requirements must be verified afterthe liner has been installed and cured in the field
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
33/39
CIPP ASTM Standards ASTM F1216 Standard Practice for Rehabilitation of ExistingPipelines and Conduits by the Inversion andCuring of a Resin-Im pregnated Tube
ASTM F1743 Standard Practice for Rehabilitation of ExistingPipelines and Conduits by Pulled in-PlaceInst allation of Cured-in-Place Thermosetting Resin Pipe (CIPP )
ASTM D5813 - Standard Specification for Cured-In-PlaceThermosetting Resin Sewer P iping Systems
ASTM F2019 Standard Practice for the Rehabilitation of ExistingPipelines and Conduits by t he Pulled in P lace installation of GlassReinforced Plastic (GRP) Cured-In-P lace Thermosett ing ResinPipe (CIPP )
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
34/39
Folded Pipe ASTM StandardsHDPE Based ProductsHDPE Based Products
ASTM FASTM F --1533 & ASTM F1533 & ASTM F --16061606PVC Based Products Type #1PVC Based Products Type #1ASTM FASTM F --1504 & ASTM F1504 & ASTM F --19471947PVC Based Products Type #2PVC Based Products Type #2
ASTM FASTM F --1871 & ASTM F1871 & ASTM F --18671867
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
35/39
Why Use CIPP or Folded PipeTechnology?
Typically no excavation requiredNo disruption of adjacent utilities or surfacepavementInstalled through existing manholesLengths over several thousand feet can beinstalled in a continuous joint-less sectionCan be installed in a variety of pipe cross-sectionsFlow characteristics are typically improved andfuture maintenance is reducedLateral pipes are reconnected robotically
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
36/39
Designed for specific applicationsMany years of successful installationsSignificantly lower in cost than traditionalexcavation and replacementLong design life when properly installed and testedFast installationsMinimal social impactUnique Installations
Why Use CIPP or Folded PipeTechnology?
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
37/39
Conclusion
Trenchless Pipe Trenchless Pipe RenewalTechnologies RenewalTechnologies are notare notmagic but are tools that need to be properly utilized.magic but are tools that need to be properly utilized.Projects must be evaluated, good engineeringProjects must be evaluated, good engineering
practice applied and the correct technologiespractice applied and the correct technologiesselected to achieve the desired end resultselected to achieve the desired end result
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
38/39
Any QuestionsContact
Gerhard Gerry P. Muenchmeyer, P.E.Director of Engineering & Operations
Reline America, IncSaltville, VA
800 866 998-0808Email [email protected]
Irv GemoraExecutive Director
NASSCO410 486-3500
Email [email protected]
Web www.nassco.org
8/8/2019 Mainline Pipe Rehabilitation Using CIPP & Folded Pipe Technology
39/39
Credits & DisclaimerMaterial contained in this Presentation has been obtained and
compiled from various related industry manufacturers,contractors, engineers, installers and end users. All partiesinvolved acknowledge the need to disseminate relevantinformation to promote (trenchless technology) productadvantages and rehabilitation techniques for the benefit of allconcerned.
This slide presentation shows products and systems made byspecific companies. This is not intended as an endorsement ofthese products and systems or to imply that there are not other
products and systems which perform the same functions.
Top Related