Download - M8-3 · Stand Alone Cooling Units Refer to schedule Units to be mounted Pipe evaporator coil Provide filter rack c/ Set condensing units Bolt units on concret Isulated extruded or

Transcript
Page 1: M8-3 · Stand Alone Cooling Units Refer to schedule Units to be mounted Pipe evaporator coil Provide filter rack c/ Set condensing units Bolt units on concret Isulated extruded or

:

:

:

:

CONSULTANT

PROJECT

DRAWING NAME

DRAWN

DATE

FILE

CHECKED

DRAWING

REVISIONS

No. DATEDESCRIPTION

T: 306.477.0655

E: [email protected]

SASKATOON, SASKATCHEWAN

3022 LOUISE STREET

S7J 3L8

F: 306.477.1995

STRUCTURAL CONSULTANTS

LLPENGINEERING

ROBB KULLMAN

only. Copyright protected.

Information shown is for use on this project

reproduced only with their written permission.

is the property of the Consultant and may be

This drawing is an instrument of Service and 3.

to the Consultant before proceeding.

by the Contractor. Report any discrepancies

All dimensions and datum are to be checked 2.

Do not scale drawings.1.

NOTES:

LLOYDMINSTER AND

LLOYDMINSTER, SASKATCHEWAN

BP

SEPT. 2013

13-496

BND

FAX: (306) 665-8589

TELEPHONE: (306) 665-6223

210 - 15 INNOVATION BOULEVARD

SASKATOON, SASKATCHEWAN, CANADA S7N 2X8

0 ISSUED FOR TENDER DEC. 20, 2013

131-22720-00

ADMINISTRATION BUILDING

DISTRICT CO-OP

M8-3

SCHEDULES