M5 Motorway upgrade Westbound from Moorebank Avenue to Hume HighwayHave your say – recommended design
December 2019
The NSW Government is planning to ease congestion and improve safety on the M5 Motorway for motorists travelling westbound between Moorebank Avenue and Hume Highway.
Background Motorists travelling westbound on the M5 Motorway through Moorebank currently experience traffic congestion in the afternoon peak. This is caused by traffic entering the motorway westbound at Moorebank Avenue, and merging with traffic already on the motorway that is looking to exit at Hume Highway. Increasing heavy vehicles travelling from the Moorebank Logistics Park will also add to the congestion.
Recommended designTransport for NSW has identified a design to upgrade the M5 Motorway westbound in this area to reduce congestion and improve the surrounding road network efficiency. The recommended design would include the following:
• A new two lane bridge over Georges River and the T2, T3 and T5 railway lines, connecting the M5 Motorway and Moorebank Avenue to the Hume Highway
• A new underpass at Moorebank Avenue for traffic exiting the M5 Motorway at Hume Highway
• A new shared exit with Moorebank Avenue for traffic wishing to exit the M5 Motorway at Hume Highway
• Closing the existing exit from the M5 Motorway to Hume Highway between Moorebank Avenue and Hume Highway.
Traffic entering the M5 Motorway at Moorebank Avenue has to merge with traffic exiting at Hume Highway
Easingcongestion
A new underpass for traffic exiting the M5 Motorway for Hume Highway
A new two lane bridge over the Georges River and railway, connecting the M5 and Moorebank Avenue to the Hume Highway
Benefits of the upgradeThe recommended design would:
• Provide a reliable road network to support economic and residential growth in western Sydney
• Reduce congestion by removing the traffic weave
• Improve safety and access to the Liverpool CBD
• Provide pedestrian and cyclist connection across the Georges River
• Provide efficient, reliable travel between the Moorebank Logistics Park and the state road network
• Support the M5 Motorway as the key gateway to south‑west Sydney
• Improve traffic flow across Georges River.
Selecting the recommended designThe development process to identify a recommended design included consultation with key stakeholders at a range of workshops and meetings. Key stakeholders have been involved in evaluating several design options to identify the recommended design.
Further information on the recommended design and how we developed and selected it can be found in the Options Report, which is now available for community feedback.
Better and more
reliable tripsfor people, business and freight
Catering for Western Sydney’s growth
See the back of this community update for details on how you can
give us your feedback.
M5 Motorway westbound traffic upgrade
Mo
ore
ban
k A
venu
e
Mo
ore
ban
k A
venu
e
M5 Motorway
M5 Motorway
Hum
e H
ighw
ay
Geo
rges
Riv
er
CASULA
LIVERPOOL
MOOREBANK
WATTLE GROVE
Connects to existing exit at Hume Highway
Existing exit from M5 Motorway to Hume Highway to be closed
New bridge over Georges River and T2, T3 and T5 railway lines
Existing entry ramp from Moorebank Avenue to the M5 Motorway
New entry ramp from Moorebank Avenue to exit at Hume Highway
New Moorebank Avenue underpass for tra c exiting at Hume Highway only
New exit at Moorebank Avenue
New shared exit for Hume Highway and Moorebank Avenue
New shared path
Eliminates issue of tra c weaving
KEYNew or upgraded road surface
Bridge/Underpass
Cycle path
Shared path
5 September 2019
Georges River
Liverpool
Warwick Farm
Casula
Glenfield
T2 T5
T8
T8 SSFL
T2 T5SSFL
West Liverpool Bypass M5 Motorway westbound trac upgrade
Moorebank Avenue Realignment option
Moorebank Avenue upgrade
M5/Moorebank Avenueinterchange upgrade
Newbridge Road/Heathcote Road/Moorebank Avenue Intersection upgrade
Cambridge Avenue upgrade
Campbelltown Road upgrade
Hume Highway (A28)Pinch Point Program
Moorebank Precinct
West
Moorebank Precinct
East
Hume Motorway/Campbelltown Road access ramps (part of Cambridge Avenue upgrade)
Moorebank Logistics Park
Hoxton Park Road
Kurrajong Road
Moo
reba
nk A
venu
e
Mo
ore
ban
k A
venu
e
Cambridge Avenue
Glenfield Road
Anzac Road
Memorial Avenue
Bee
ch R
oad
Railw
ay P
arad
e
Can
terb
ury
Ro
ad
M5 Moto
rway
M5 Motorway
Hum
e M
otor
way
(M
31)
Hume Highway (A28)
Hum
e H
ighw
ay (
A28
)
Hume Hig
hway
(A28
)
Camden Valley Way
Cum
ber
land
Hig
hway
Newbridge Road
Heathcote Road
Campbellto
wn Road
M7 Motorway
Elizabeth Drive
LIVERPOOL
ASHCROFT
LURNEA
PRESTONS
GLENFIELD KEY
Proposed medium term work
Proposed long term work
Developer funded work
Developer proposed work
Southern Sydney Freight LineSSFL 0m
100m
200m
500m
1km
Moorebank Intermodal Terminal Road Access (MITRA) StrategyTransport for NSW developed the Moorebank Intermodal Terminal Road Access Program to address increasing traffic and freight movements in the Liverpool-Moorebank area over the next 10-20 years. The strategy identified road infrastructure improvements to meet the forecast growth of Liverpool CBD and regional traffic, together with construction of the Moorebank Logistics Park. The Park will generate over 6,600 heavy vehicle trips and 10,000 light vehicle trips per day.
The M5 Motorway westbound traffic upgrade is one of the road infrastructure improvements identified in the MITRA strategy.
Privacy Transport for NSW (“TFNSW”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise Transport will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by Transport at 27 Argyle Street, Parramatta, 2124 NSW. You have the right to access and correct the information if you believe that it is incorrect.
December 2019 RMS.19.1494
If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 519 525.
Have your sayWe are seeking feedback on the recommended design for the M5 Motorway westbound traffic upgrade. Please send your comments through to us by Friday, 21 February 2020 by email, post or online via the project website (see contact details on this page).
The Options Report is available online at: rms.work/m5westbound.
Community information sessionsWe are hosting two community information sessions to provide you with an opportunity to ask the project team questions and seek further information. A formal presentation will not be given so please feel free to drop in any time at one of the following sessions:
Liverpool Library, Orange room 170 George Street Liverpool Saturday 14 December 2019 – 10am to 12noon
Casula Powerhouse Arts Centre 1 Powerhouse Road, Casula NSW 2170 Wednesday 5 February 2020 – 5pm to 7pm
If you are unable to attend one of the information sessions, you can contact us to discuss, or to arrange another time that is suitable to meet. To make a submission or to join the mailing list, please contact the project team.
What are the next steps?All comments received during consultation for the recommended design will be considered in decision making and development of the final concept design. A report which summarises comments or questions received for the project, and our responses, will be published on the Roads and Maritime website. If you submit feedback you will receive notification of the report’s availability.
We will keep community members and stakeholders informed of the progress throughout delivery of the project.
*subject to project approval and funding availability
Contact us 1800 519 525
rms.work/m5westbound
M5 Motorway westbound traffic upgrade PO Box 973, Parramatta NSW 2124
Improvingsafety
STRATEGIC DESIGN OPTION STUDY
CONSULTATION ON THE RECOMMENDED DESIGN
CONCEPT DESIGN AND ENVIRONMENTAL ASSESSMENT
APPROVED TO PROCEED*
DETAILED DESIGN*
CONSTRUCTION*
WE ARE
HERE