8/7/2019 Logistics Delivery Work Manual Final
1/15
Guideline fordelivery services
Delivery management
Page 1/15
Logistics-04 CJO Shopping A4(210297)
1. Objectives
This regulation serves as a guideline for handling issues that may occur while delivering
products purchased from CJ O Shopping and as a training material for the courier companies
to maximize customer satisfaction through their services.
2. Scope of application
The regulation is applicable to all delivery related processes and to the overall processes to
promptly resolve delivery related issues carried out by the Delivery Management Part of the
CJ O Shopping Logistics Planning Team and relevant departments.
3. Glossaries and abbreviations
1) Truck loading/unloading
Loading/unloading delivery products to/from the trucks that operate between terminals.
2) Order shipped
Orders already shipped and thus not required to be shipped/delivered. This is used when
the customer requests to change the payment method after the shipping is complete or
when the product must be re-registered because it mistakenly indicated as returned in
the system although it is currently being used by the customer.
3) Deliveries by CJ O Shopping
Deliveries made by shipping the product out of CJ O Shoppings logistics center. This
include direct deliveries by CJ O Shopping and supplier deliveries managed by CJ O
Shopping.
4) Non-shipped order
Orders that have not been shipped past the delivery date from the product being out of
stock at CJ O Shopping or the supplier.
5) Priority shipment
8/7/2019 Logistics Delivery Work Manual Final
2/15
Guideline fordelivery services
Delivery management
Page 2/15
Logistics-04 CJO Shopping A4(210297)
Requesting foron-the-day shipping to the Logistics Team when the customer asks for a
quick delivery of a product in stock in the logistics center.
6) Requested direct delivery by supplier
Orders that should be delivered by CJ O Shopping but have been requested to be
delivered by the supplier without going through CJ O Shoppings Logistics Center from
the customer asking for a quick delivery of products that are not in stock in CJ O
Shoppings Logistics Center.
7) Deposits
A special form of payment kept in certain institutions to conveniently use in the future.
Deposits can be used as an alternative payment to cash or credit cards. For example, the
customers cash payment for a returned order may be converted to deposits instead of
refunds to pay for another product.
8) Valued customer management team
A team in the Customer Service team responsible for providing services from orders to
complaints forPlatinum S and A grade customers with good order history.
9) Customers comments field
This field is used to record the customers request regarding orders/complaints and is
printed on the courier invoice.
10) Gathering
Gathering the products collected from the customers or the suppliers in one place.
11) Arrival destination (receiving place) change
The process of the courier company changing the arrival destination for the product to
be delivered to the right place in case the customer requested to receive the order (which
already entered the shipping process) at a location different from the original one.
12) Shipping order
A stage in the process for the customer to receive the order. The product is delivered to
8/7/2019 Logistics Delivery Work Manual Final
3/15
Guideline fordelivery services
Delivery management
Page 3/15
Logistics-04 CJO Shopping A4(210297)
the customer through the process ofOrdering Payment approval Shipping order
Shipping.
13) Order tracking
This service displays the courier company data showing the transportation status of the
product.
14) Refusal to receive
The act of refusing to receive the shipped product by customer.
15) Delivery delay
The case where product was shipped out of the warehouse and forwarded to the courier
company but has not been received by the customer by the third day. Customer not home
for a long time (e.g. overseas trip, hospitalization) or delivery failures from wrong contact
number do not fall under this category.
16) Unidentifiable item
Items that the customer information cannot be identified because the courier invoice fell
off from the product during delivery or retrieval.
17) Lost by courier company
This refers to the case when it is no longer possible for the courier company to locate the
product forwarded after shipping or loading.
4. Process
1) Managing non-delivered orders
This is to take care of the product delivery process from shipping to delivery and to
identify and resolve any non-deliveries arising in the process.
(1) Search process
Navigate the menu to search for non-deliveries: Logistics Delivery by CJHS
8/7/2019 Logistics Delivery Work Manual Final
4/15
Guideline fordelivery services
Delivery management
Page 4/15
Logistics-04 CJO Shopping A4(210297)
Data analysis Courier invoices for non-deliveries
Specify the shipping date: Specify the dates to search for orders not delivered forover4 days.
Courier company: Search once by specifying the courier to CJ GLS and once todesignated delivery.
Warehouse: In case of CJ GLS, search once by specifying the warehouse toGunpo warehouse and once to the Jewelry storage.
Search rights: Search rights should be granted only to the leader of the DeliveryManagement Part and to the person responsible for managing non-deliveries.
(2) Handling non-deliveries
Convert the search result data into an excel file and send to the personresponsible for non-deliveries in the CJ GLS Home Shopping Part.
The responsible person in the CJ GLS Home Shopping Part inputs the reasonidentified (e.g. actually not delivered, lost by courier company, wrong contact
number, product damaged, Date Designated Delivery, customer not home, etc
and feed back on the following day to the person in charge of non-deliveries in
the Home Shopping Delivery Management Part.
Process the case based on the feedback of the non-delivery reason from the CJGLS Home Shopping Part.
Contact the customer in case the feedback is not available or if the details shouldbe reconfirmed with the customer.
For actually undelivered cases, urge to deliver the item on the day and track thedelivery process.
8/7/2019 Logistics Delivery Work Manual Final
5/15
Guideline fordelivery services
Delivery management
Page 5/15
Logistics-04 CJO Shopping A4(210297)
(3) Handling process by non-delivery reason
Barcode scan for successful deliveries is missing: Process the delivery as beingcompleted for cases indicated as non-deliveries because the barcode scan is
missing for the product successfully delivered.
Lost by courier companyA. Customer wishes to receive the product
a) Register the case as shipping successful and request a priority
shipment to the Merchandise Part to ship the product on the following
day.
b) If the customer must receive the product on that day, deliver the product
using quick service distributors and have the incurred charges borne by
the courier company after consultation with the CJ GLS Home Shopping
Part.
c) Contact the customer to apologize for the delivery delay and inform the
estimated date of delivery.
B. Customer asks for a refund
a) Register the case as shipped order.
b) Contact the customer, politely apologize for the delivery delay and inform
the refund process.
Product damaged: Forward the case to the Refund Part or the person in chargeof damaged products to enter a re-shipping process.
Wrong contact number: Check the customers proper contact number and informthe courier company for the delivery to be made successfully.
Not possible to identify the correct contact numberA. If the contact number cannot be identified by the fifth day of shipping, give a
collection order to send the product back to the companys logistics center
(frozen food should be returned after 1 day).
B. In case credit card payment was made for the product, register the case as
return to cancel the credit card payment approval.
C. Specify in the customers comments field that the product has been
requested for return because it could not be delivered from contact number
error.
D. In case cash payment was made for the product, get the product back at the
8/7/2019 Logistics Delivery Work Manual Final
6/15
Guideline fordelivery services
Delivery management
Page 6/15
Logistics-04 CJO Shopping A4(210297)
logistics center and register the case as an A/S request.
Customer designates the delivery date: Have the courier company keep theproduct at their sales office and deliver it on the designated date.
Customer designates the delivery date over 10 days from the shipping dateA. Register the case as an A/S request to get the product back at the
companys logistics center and re-ship it on the designated date.
B. Registering an A/S request
a) Navigate the menu: Call Center Order management Order process
A/S registration
b) Input the number of items (quantity).
c) Select code 402 To be retrieved.
d) Check the receiving location (initially specified as the shipping
destination of the product).
e) Select the warehouse. The default value is Gunpo Warehouse.
C. Specify the desired designated date of delivery in the customers comments
field.
Handling cases if the non-delivery reason do not exist.A. Check the non-delivery reason with the person responsible for managing
non-deliveries in the CJ GLS Home Shopping Part.
B. Handle the case based on the feedback of the responsible person.
Errors made by IT Team/Logistics/Telemarketing: Provide the error related data to
8/7/2019 Logistics Delivery Work Manual Final
7/15
Guideline fordelivery services
Delivery management
Page 7/15
Logistics-04 CJO Shopping A4(210297)
the relevant department to handle the case.
(4) Share the above details with the person in charge of non-deliveries in the CJ GLS
Home Shopping Part and manage comprehensively.
2) Managing delivery related SRs
The SRs are managed to promptly take care of customers complaints and insufficient
services arising from delays in deliveries or collections by the courier company.
(1) Search process
Navigate the menu to search: Call Center Order Management SR SRhandling (business/supplier) Search
Processing date/time: Specify the end date/time of the previous day in the startingperiod field and the present date/time in the ending period field.
Type/Subtype: Select the Type to 31 Logistics and the Subtype to 08 Inquiriesfor the Delivery Management Part
Responsible person: Assign the person in the Delivery Management Part tohandle deliveries and input the employee number to populate the persons name.
General customers: To handle delivery related complaints raised by customersother than special (valued) customers.
Special customers: The valued customer management team handles thesescases.
All: This option is used to search and handle all customers.
8/7/2019 Logistics Delivery Work Manual Final
8/15
Guideline fordelivery services
Delivery management
Page 8/15
Logistics-04 CJO Shopping A4(210297)
(2) Rules for handling
All registered cases should be searched in the morning and processed on thatday (when search was made) in principle.
The complaints in the search result should be forwarded to the person in chargeof complaints in the CJ GLS Home Shopping Part.
The person should handle the forward cases on the receiving day and feedbackthe results to the person responsible in the Delivery Management Part.
(3) Handling process by type of complaint
Complaints from delay in deliveryA. Product is in delivery depots
a) Delivery is delayed because the product is in process of being
loaded/unloaded to/from the truck.
b) The case should be handled based on the customers request. If the
customer wishes to receive the product on the day, have the courier
company deliver the product on the day.
c) If the SM cannot deliver the product on the day, arrange the product to
be delivered using quick service distributors from the terminal or the
branch.
d) If the product has been in delivery depots for over 5 days, the case
should be registered as Lost by courier company and requested for
priority shipment to ship the product on the following day
e) In case the product cannot be shipped from being out of stock, ask for a
requested direct delivery to the supplier. N.B. If the supplier also does
not have stocks available, check the date when the delivery can be made
and contact the customer to apologize for the delay and inform the
estimated date of delivery.
f) In case the customer wishes to receive the product on that day, discuss
with the courier company to request for delivery using quick service
distributors.
B. Delivery is delayed from product damage
a) For damaged products, the courier company should scan the barcode of
the shipping invoice to have the product returned to the logistics center.
8/7/2019 Logistics Delivery Work Manual Final
9/15
Guideline fordelivery services
Delivery management
Page 9/15
Logistics-04 CJO Shopping A4(210297)
b) Contact the customer to inform of the delivery delay and ask for an
understanding since it takes time to forward the product to the person in
charge of damaged products and re-ship the product.
C. Delivery is delayed from discretionary consignment
a) Have the SM pick up the product from the consignment place and re-
deliver it to the place designated by the customer.
b) In case the customer could not receive the product from discretionary
consignment, register the case as temporarily missing for which the
courier company is liable.
c) Request priority shipment for cases registered as temporarily missing
and deliver using quick service distributors for the products that must be
delivered on the day.
d) Cancellations can be made for temporarily missing cases if the courier
company finds and returns the product that was missing.
D. Delivery is delayed from CJ not shipping the product
a) Ask the Merchandise Part to check when the product will be available for
shipping.
b) Contact the customer to apologize for the delay and inform the estimated
day of delivery, considering the expected shipping date and the time
taken for the courier company to deliver the product.
c) In case the customer expresses strong dissatisfaction regarding the
above process, have the person responsible for QR in the Customer
Service Team to check the product stock at the supplier warehouse and
ask for a requested direct delivery by the supplier.
Complaints from delays in collectionA. Urge the courier company to collect the products on the day when the SR
search is made.
B. In case the customer and the courier company fails to reach an agreement
regarding the collection process, use quick service distributors to collect the
product if the destination is located in the Seoul or Kyonggi area.
C. Before sending the quick service distributors, contact the customer to politely
apologize that the collection will be made by a quick service distributor and
not the designated courier company and inform the estimated time of visit
8/7/2019 Logistics Delivery Work Manual Final
10/15
Guideline fordelivery services
Delivery management
Page 10/15
Logistics-04 CJO Shopping A4(210297)
and the collection process.
D. If the collection has been delayed forover 5 days, have the incurred charges
borne by the courier company after consultation with the CJ GLS Home
Shopping Part.
Complaints from delays in refund (collection confirmed)A. Product is in delivery depots
a) Check the exact location of the product on the day and have the CJ GLS
Home Shopping Part to get the product back to the logistics center.
b) If it takes time to check the exact location of the product, request a
refund to be made to the customer first by registering an SR (specify the
Type to 03 Credit card related and the Subtype to 02 Prior cash
refund request).
c) Contact the customer to apologize for the delay and inform the status of
the refund process.
B. Product is missing during the return process
a) Register the shipped order to have been lost by the courier company.
b) Navigate the menu to register the reason: Call Center Order
management Order registration
c) Specify the reason to 30 Lost by courier company in the Order shipped
field.
d) The process is same with the order taking process.
e) Specify the payment method as accounts receivable.
f) Contact the customer to politely apologize for the delay and inform the
status of the refund process.
8/7/2019 Logistics Delivery Work Manual Final
11/15
Guideline fordelivery services
Delivery management
Page 11/15
Logistics-04 CJO Shopping A4(210297)
Products returned using other courier companiesA. In case the customer returned the product to the logistics center (or supplier)
using another courier company, ask the customer of the courier company
and return invoice number to locate the product through the internet order-
tracking service.
B. When the product is successfully received at the logistics center, check
whether the ordered product and the returned product are the same.
C. Check whether any components are missing in the returned product and
forward it to the Return Management Part.
D. Not possible to identify the courier company and the return invoice number of
the courier company used by the customer
a) Check all the internet order-tracking services available to see if there are
any returns made to the logistics center or to the supplier.
b) If the product cannot be located through all the possible ways, politely
inform the customer of the fault of not receiving and keeping the receipt
and that the return cannot be processed.
Other companys product being returnedA. Customer wishes to have the product back
a) In case the customer wishes to have the product back, deliver it to the
customer at the companys expense.
b) In case the customer wishes to have the product directed to the
company he/she ordered the product from or to the logistics center of
another home shopping company, check the location and send the
product with shipping charges to be paid on delivery.
B. If the product has been returned to the Return Management Part and not the
Delivery Management Part, identify the person receiving the returned product
and inform the person to handle the case according to the customers
request.
Request for change of receiving/collecting locationA. Customer requests to change the place to receive the product
a) Contact the sales office to change the destination address so that the
product can be delivered to the receiving place desired by the customer.
b) Have the courier company to make sure that the products are delivered
8/7/2019 Logistics Delivery Work Manual Final
12/15
Guideline fordelivery services
Delivery management
Page 12/15
Logistics-04 CJO Shopping A4(210297)
successfully.
B. Customer requests to change the place to collect the product
a) In case of returns, cancel the return already registered in the system and
re-register the return with the address of the changed collecting location
requested by the customer.
b) In case of changes, delete the collection order registered and inform the
sales office to collect the product from the changed location.
c) If it takes time to check the exact location of the product, request a
refund to be made to the customer first by registering an SR (specify the
Type to 03 Credit card related and the Subtype to 02 Prior cash
refund request). Register an SR with the Type field specified to 10 GLS
courier related and the Subtype to 03 Immediate collection for
return/change to enable the courier company to manage the collection
cases.
For cases regarding errors made by the Logistics center/IT Team/Telemarketing,identify and inform the concerned Part of the reason and the customers request.
3) Date Designated Delivery
This is the process of shipping the product according to the custome rs request and the
courier company delivering the product on the date designated by the customer.
(1) Search process
Navigate the menu: Logistics Deliveries by CJHS Shipping order result Shipping order
Warehouse: Gunpo warehouseShipping order date: On the dayDelivering company: 22 CJ GLSDelivery invoice type: Date Designated Delivery (Code No. 103)
8/7/2019 Logistics Delivery Work Manual Final
13/15
Guideline fordelivery services
Delivery management
Page 13/15
Logistics-04 CJO Shopping A4(210297)
(2) Handling process
Search the shipping orders for which Date Designated Delivery must be madeand send the search results to the responsible person in the CJ GLS Home
Shopping Part.
For example, if the customer designated the delivery date to October 25, theshipping order is made on October 24th and the product is shipped and delivered
on the following day (25th).
A. Send the Date Designated Delivery orders to the CJ GLS Home Shopping
Part to make sure that the delivery is made on the designated date.
B. If Date Designated Delivery is not possible, receive the feedback of the
reason from the CJ GLS Home Shopping Part.
(3) Handling cases which Date Designated Deliveries cannot be made
Date Designated Delivery not possible from system errorA. Contact the customer to apologize for the request not being carried out and
ask for another date to receive the product.
B. Feed the error back to the IT Team to prevent the same case from recurring.
Date Designated Delivery not possible from product being out of stockA. Check with the Merchandise Part on the date when the product will be
available.
B. Contact the customer to apologize for the Date Designated Delivery request
not being carried out, ask for another date and make sure that the product is
delivered on that day.
C. In case the customer wishes to cancel the order because the Date
Designated Delivery request has not been fulfilled, make the refund as soon
as possible based on the customers request.
Customer wishes to change the date to receive the productA. Have the sales office keep the product until the changed date and deliver it
on the requested date.
B. If the date designated by the customer is over 10 days from the shipping
date, return the product to the logistics center and ship again on the
requested date.
8/7/2019 Logistics Delivery Work Manual Final
14/15
Guideline fordelivery services
Delivery management
Page 14/15
Logistics-04 CJO Shopping A4(210297)
(4) The CJ GLS Home Shopping Part should feedback the delivery status of Date
Designated Delivery orders to the Delivery Management Part in 2 days from receiving
the list of orders.
4) Handling products returned using other courier companies
In case the customer discretionarily returns the product using other courier company,
check the reason with the customer and process as change, return or A/S based on the
customers request to prevent any more delays. This includes the direct returns to the
logistics center made by the customers living in islands where CJ GLS courier company
does not operate.
(1) Managing products returned using other courier companies
Check the customer information of the returned product to confirm whether thecustomer is same for the order and the return.
Check whether the customers request is specified in the SR and process aschange, return or A/S (partial return) accordingly.
A. Customer wishes to return/change the product
a) Register a return/change and specify the reason to order
shipped/received to prevent collection orders from being made to CJ
GLS courier companies.
b) Input the courier company name, delivery invoice number, receiving date
in the SR to enable the call center agents to respond to customers
inquiring whether the returned product has been received.
c) Specify the details (e.g. order number, customer name, product name,
received date) of the product requested to be returned by the customer
in the list of products returned using other courier companies and send
the physical list using the internal delivery service to the Return Part to
request for confirmation of the collection process.
8/7/2019 Logistics Delivery Work Manual Final
15/15
Guideline fordelivery services
Delivery management
Page 15/15
Logistics-04 CJO Shopping A4(210297)
B. Customer asks for A/S or partial change
a) In case the customer asks for A/S or partial changes, check with the
supplier and send the product back if the supplier can provide A/S or
partial change.
b) If A/S or partial change cannot be provided, inform the reason to the
customer and ask for an understanding and return the product back to
the customer.
c) Specify the courier company name and the return invoice in the SR for
future reference.
If the customers request is not specified in the SR field, contact the customer toidentify the reason for returning the product and process accordingly.
Return the product in case the received product turned out to be a productpurchased from another company.
A. In case the customer wishes to have the product back, deliver it to the
customer at the companys expense.
B. In case the customer wishes to have the product directed to the company
he/she purchased the product from or to the logistics center of another home
shopping company, check the location and send the product to the
concerned location with shipping charges to be paid on delivery.
(2) If the shipping charges have been already paid, specify the fact in the return invoice
and keep it instead of the receipt.