Project Overview• The community that nurtures nature in urban living, Lions Park Residences that offers low-rise
condominium units, strategically located near commercial destinations, the Makati and Ortigas business districts as well as the new NAIA 3.
The lush surroundings of this urban community boast of amenities such as a multi-purpose hall, a landscaped park, a resort-type swimming pool and a playground complete with a fish pond and a butterfly garden.
It also has barbeque pits ideal for family picnics and commercial area for all your various personal needs.• Everything you need is just a few steps away from this environment-friendly community, feel secured and
at home as you choose from a Studio, 1-bedroom unit, 2-bedroom unit or 3 bedroom unit. Truly, Lions Park Residences is undoubtedly an excellent investment especially to OFWs and retirees who are looking for a place to stay or a home to retire in Manila.
• To address the needs of the home owners, the Quadrillion Property Management (QPMI), the property management team of Lions Park, offers leasing and professional management .
Realize your dream home today.
Amenities
The Pavilion
Amenities
Lap Pool & Kiddie Pool
Amenities
Central Park
Koi Pond
Children’s Play area
Water Bubblers
How to get there:
At Lions Park Residences, you will not
have to worry for everything is just a
few meters away. This lush community
is strategically located at Sta. Ana
Drive, Sun Valley, Parañaque City. It is
also accessibly situated near business
centers and transportation hubs, only
10-15 minutes to Makati CBD, 25-35
minutes to Ortigas CBD and 5 minutes
to the NAIA 2.
Building Features
Elevated water tanks 24/7 water supply
Underground drainage & sewerage system
2.4 meter-wide corridors
2 meter-wide entrance
Elevator
Generator for common areas
Affordability
Reservation fee starting at P15,000
As low as P10-15,000 monthly amortization
Flexible payment schemes
(down payment – payable up to 16 months; balance – payable up to 30 years through Pag-IBIG)
Financing through in-house, bank or PAG-IBIG.
Unit Features (GOLD)RESIDENTIAL AREAA. Floor Finishes Living, Dining & Kitchen Ceramic tiles with painted baseboard Bedroom Vinyl planks with painted baseboard Toilet Unglazed ceramic tiles
B. Wall Finishes With ficemboard partitions Interior walls Painted Finish Toilet Painted paint cement finish above glazed tiles
C. Ceiling Finishes Living, Dining & Kitchen Painted plain cement finish Bedrooms Painted plain cement finish Toilet Painted ficemboard finish
D. Kitchen Modular Kitchen cabinet with stainlesssink and stainless counter top No overhead cabinet.
E. Door Entrance & Bedroom door Solid finger jointed wood with sheet
laminated and solid wood core doorjambs plus casing
Balcony door (GF only) Aluminum framed sliding glass panel Toilet door PVC door
F. Windows Aluminum windows
G. Finishing Hardware Cylindrical lockset for main and bedroomPrivacy lockset for T&B door
H. Toilet Fixtures Water closet and Lavatory “American Classic Brand” or approved equivalent Shower Faucet Complete set of shower with faucet & fittings
I. Electrical Complete outlet and lighting devices with circuit breaker
Floor Plans
46.08 sq.m, 2 BR & 2 T&B
Floor Plans
Floor Plans
Floor Plans
ALPACA Š GROUND BUILDING LAYOUT with GARDEN UNITS (OLD)
Floor Plans
Floor Plans
Elephant Building
6 storeys Ground floor with trellis facing the parkTypical building layout
ELEPHANT MODEL UNIT
Floor Plans
Commercial BuildingFloor Plan
Terms & Conditions: (dp in 14 months)
Pagibig financing – 10/90 scheme Bank financing – 20/80 scheme In House Financing –20/80 no discount , complete PDCS
Giraffe Building / Commercial Units
Typical Ground Floor Plan (Commercial Units)106.04 49.73 49.73 49.73 61.8475.2062.6062.7546.2243.84
Price is Php 50,000 per square – Thru accredited Bank financing (BPI, Veterans, LBC)
Terms: 20% Downpayment in 18 months, 80% loan financing
Requirements:Submit the following to the Head Office c/o Sales Operations Group
Reservation Fee of Php 30,000 non refundableLetter of Intent indicating nature of businessBusiness Plan
Retail Business NeededBeauty SalonMedical ClinicDay Care CenterWater StationLaundry Coffee ShopBakery
OVERVIEW OF PAVILION& CENTRAL PARK
As of May 2011
As of May 2011
Construction Updates – Pool
SWIMMING POOL BRIDGE OVERKOI POND
Construction Updates – Pavilion
STAIRS GOING UP GROUND FLOOR
2ND FLOOR
Construction Updates – Central Park
ENTRY POINTS
WATER FEATURES (BUBBLERS)
KOI PONDCHILDREN’S PLAY AREA
Construction Updates
BUTTERFLY BLDG.
CAMEL BLDG.
BISON BLDG.
CODFISH BLDG.
ANTELOPE BLDG.
Construction Updates – Dolphin Building
Construction Updates – Dolphin Building
Construction Updates- Fox Parking Lot
Covered walkway ongoing construction
Awarding of Alpaca to CE Construction
Alpaca Building - Topping Off
Led by the ff: LPR Site Engineer Arnel Silvano, LPR Property Manager Ms. Nina Yamson, Marketing Supervisor Ms. Lei Macasaet-Pacheo, LPR Project Director Mr. Mike Pacheo, CDCH Architect Beth
Vidal and CECON Engineer Robert Suggang
Construction Updates – Alpaca Building
As of May 2011
Interior of Alpaca Building
TOILET AND BATH
KITCHEN AREA
FIRE HOSE CABINET ELEVATOR HALLWAY CEILING
Top Related