Background
Committee Make-up
• District Administration
• District Staff
• Community Citizens
• Parents
Lincoln Consolidated Schools
Committee Tasks To Date
May 20, 2004
August 11, 2004
August 30, 2004
September 16, 2004
October 12, 2004
• April 21, 2004
• June 16, 2004
• August 24, 2004
• September 7, 2004
• October 5, 2004
• Meetings
• Community Survey (Focus Group)
• Studied Enrollment Projections
Lincoln Consolidated Schools
Grades K-5 Enrollment Projection/Capacity
1500
1900
2300
2700
04-05 05-06 06-07 07-08 08-09 09-10
Rev ProjCapacity
Lincoln Consolidated Schools
Grades 6-8 Enrollment Projection/Capacity
1000
1200
1400
1600
1800
2000
04-05 05-06 06-07 07-08 08-09 09-10
ProjectionCapacity
Lincoln Consolidated Schools
Grades 9-12 Enrollment Projection/Capacity
1000
1500
2000
2500
04-05 05-06 06-07 07-08 08-09 09-10
ProjectionCapacity
Lincoln Consolidated Schools
Grades K-12 Enrollment Projection/Capacity
1000150020002500300035004000450050005500600065007000
04-05 05-06 06-07 07-08 08-09 09-10
Rev ProjCapacity
Lincoln Consolidated Schools
Guiding PrinciplesSolution should cover Enrollment relief at all grade levels, and make the Schools feel smaller in size (i.e., school within a school)
1.
Should be a long-term solution and should provide flexibility for the future
2.
Solutions should create a positive image for the District, Solution should maintain a feeling of community spirit, and Solution should have a clear and measurable benefit
3.
Additions and remodeling should be based on "sound" educational reasoning
4.
Note: Last two items were a tie in ranking.
State of Art Technologies5.Solution should be attainable in the public's opinion
Lincoln Consolidated Schools
Final Draft Recommendations
• Construct new High School on current site north of middle school and south of Childs for 2,000 students with capacity of the core space to be 2,500 including outdoor fields.
• High School project includes an Auditorium for 1,000 seats with full fly and supporting space (approx. 36,000 sq. ft.)
• High School project includes an 8 lane x 25 yard competition pool with integral diving well and supporting spaces (approx. 25,000 sf)
New High School
• Renovate Bessie Hoffman into Alternative Education Center• Allocate $3M for technology District Wide
Other Secondary Issues
Lincoln Consolidated Schools
• Remodel classroom to Tech Program rooms
• “Gas, Air, Water at Perimeter” above floor
• New Casework
• Remodel 2 classrooms to Science Ready Rooms
• “Gas, Air, Water at Perimeter” above floor
• New Casework
Major Remodeling
Bessie Hoffman
Lincoln Consolidated Schools
• Move Middle School to existing High School and form 2 middle schools – East & West (Capacity – 1,600)
Final Draft Recommendations
Middle School
Lincoln Consolidated Schools
East Wing – Major Remodel
• 6 classrooms to Science Ready Rooms
• “Gas, Air, Water at Perimeter” Above Floor
• New Casework
West Wing – Major Remodel
• 2 classrooms to Science Ready Rooms
• “Gas, Air, Water at Perimeter” Above Floor
• New Casework
West Wing – Major Remodel
• 4 classrooms to Science Ready Rooms
• “Gas, Air, Water at Perimeter” Above Floor
• New Casework
West Wing – Major Remodel
• Remodel existing pool to accommodate barrier free issues (auto-raising bottom)
West Wing – Minor Remodel
• Remodel original music room suite to new Music Classrooms (storage use now)
8th Grade
7th Grade
6th Grade
West Wing – Minor Remodel
• Remodel facility’s offices to West Wing Administration Area
Lincoln Consolidated Schools
Final Draft Recommendations
Elementary Schools
• Renovate middle school to elementary housing:
multi-age program from Bessie Hoffman
an elementary school the size of Childs
renovate outdoor areas for elementary playgrounds
• Roofing Replacement at Model Elementary
• Reconfigure elementary program to K-5
• Remodeling at Redner for additional Kindergarten classes
• Abatement / ADA Upgrades at Brick Elementary
Lincoln Consolidated Schools
• Remove existing computer labs to enlarge Media Center & create Art Room
• Modify finishes, lighting, HVC
• Supplement Media Center furnishings
Major RemodelingMinor Remodeling
Spare
CompSE
2-3
2-3
4-5
4-5
2-3
2-3
4-5
4-5
T
K-1
K-1
K-1
K-1
Spare 3
3
4
4
CompSE
5
5
Spare
2
2
1
1
SET
2
2
1
1
Spare
5
5
SpareTPare
nt
3
3
4
4
K
Comp
K
K
Ad
mi
n
K
• Remodel 12 classrooms to become 8 Kindergarten classrooms
• Modify finishes and doorways
• New casework; add water
• Remodel 2 classrooms to become Multi-Age Administration
• Modify finishes and doorways
• New casework; modify HVAC
Allows for flexibility of
½ day or all day kindergarten.
Lincoln Consolidated Schools
Redner ElementaryMinor Remodeling
• Remodel 4 classrooms to become 3 Kindergarten classrooms
• Modify finishes and doorways
• New casework; add water
Lincoln Consolidated Schools
• Allocate $2M of bond dollars toward purchase of future land
Final Draft Recommendations
Other
Final cost of February 2005 bond issue
$95 M = .90 mills $2.1 M =Projected Interest
Earnings
$97.1 M Total Project Budget
Lincoln Consolidated Schools
Adjustments since Draft Presentation
• After receiving information from the Community Survey and Public Forum, the Citizens Steering Committee felt it necessary to conceptually include the walking track in the gymnasium for the New High School. Administration and Board Members on the Committee agreed that this would be a good response to input received from the community survey and public forum.
New High School
Elementary Projects• It was also concluded that partial “All Day” kindergarten could be achieved at Childs Elementary by the relocation of one Special Ed classroom to an underutilized existing resource room, eliminating the necessity for the planned addition. Bond allocated monies for the proposed two kindergarten classroom addition will be reallocated to the New High School. Administration and Board Members on the Committee agreed that this would be a good response to input received from the community survey and public forum.
• The District Building and Site Committee has been formulating a list of “Future Projects”. The District Administration has identified some projects from the “Future Projects List” as “Must Do” from the 2005 Bond Issue budget. This includes partial roof replacement at Model Elementary, and abatement / ADA upgrades at Brick Elementary.
Lincoln Consolidated Schools
Summary• Convert Existing HS into 2 - 800 Student MS
• Convert Bessie Hoffman to Alternative Ed
• Convert Existing MS into (2) Elementary Schools • Roof replacement at Model
• Remodel Redner Classrooms for Kindergarten • Build New 2000 Student (2500 Core) High School • Property Acquisition
• District Wide Technology
• Abatement / ADA Upgrades at Brick
Lincoln Consolidated Schools
Next Steps
• Board of Education Approval of Recommendation on scope of project – October 18, 2004• Department of Treasury Approval Process
• Board of Education Action to Schedule Election November 29, 2004• Organize Bond Campaign Committees
• Board of Education Approval of Preliminary Qualification Application – October 25, 2004
Lincoln Consolidated Schools
Citizens Steering Committee
Bond Issue Final Recommendation
October 18, 2004
7:00 p.m.
Top Related