www.nqminerals.com
LEAD SILVER ZINC GOLD
COBALT* NICKEL*
Under Development*
NQ is listed in London and dual listed on the US OTC MarketsM
AY 2020
Hellyer Polymetallic Tailings Project
Produc�on
2014 2015 2016 2017
NQ Minerals Timeline
2018 2020 2021
NQ Minerals Pty LtdAustralian Company Incorpora�on
2013
NQ Minerals Plc
North QLD Assets
RE-FINANCEPROPOSED LISTING UPGRADE
Barnes Hill
Re-Finance
September July
100% Owned Subsidiary
Gold & Base Metals
Square PostUkalundaGold
NQ Minerals acquires Hellyer Mine
Refurbishment
Project and Pre-Produc�on Finance
Hellyer Underground Rights
Gold MineBeaconsfield
2019
NQ’s flagship project is the Hellyer Gold Mine in Tasmania, Australia. It commenced produc�on in 2018 with an ini�al 10 year mine life. Produc�on is currently running at about 3,000 tonnes of Lead concentrates and 1,500 tonnes of zinc concentrates per month (Q1 2020).
NQ what we do...
Having acquired, refurbished and restarted the minerals reprocessing plant at the company’s flagship Hellyer Lead, Zinc, Gold, Silver Mine in Tasmania Australia, NQ Minerals has transforma�onal expansion plans;.
Extending the life of Hellyer by securing the underground rights to high grade Lead and Zinc deposits at Hellyer.
NQ CorporateGrowth Plans
Beaconsfield Gold Mine
Acquisi�on of synergis�c projects in Tasmania to u�lise pyrite from Hellyer in the low-cost produc�on of Nickel and Cobalt.
Acquisi�on of one of Tasmania’s richest gold mines – the mix of base and precious metals provides a hedge across the full commodity cycle.
Acquisi�on of other mineral reprocessing projects.
NQ Minerals is a producer and supplier of precious and base metals. In addi�on, the company is developing projects to produce the key mineral commodi�es which are utilised in the manufacture of ba�eries for electric vehicle and high tech.
NQ Hellyer Processing Plant
Total Resource at the lower sec�on of Beaconsfield Gold Mine in Tasmania, Australia, increased to 1.454 million tonnes grading 10.3 grams per tonne (g/t) for 483,000 ounces of gold
An addi�onal 67,000 ounces of gold poten�al exists in Tailings Dam #1
Significant addi�onal gold poten�al s�ll to be assessed in the upper sec�on of the old Beaconsfield Mine workings from surface to the 415 metre level plus the orebody remains open at depth below 1,500 metres
“Beaconsfield is a rich gold deposit with genuine scale. The deposit is open at depth and there is significant poten�al to increase these resources with further drilling.” NQ Minerals Plc’s Chairman David Lenigas
JORC Gold Increases to 483,000 ounces at 10.3 g/t
Inferred
Total
Beaconsfield Gold Mine Independent JORC 2012 Mineral Resource Statement – 30 April 2020
(using 3 g/t lower cut-off)
Resource Catergory Tonnes kt Contained Metals Au koz
Measured
Indicated
Gold grade Au g/t
485 11.4 177
492 11.2 177
477 8.4 129
1454 10.3 483
Beaconsfield Gold Mine NQ Management& Board
NQ has an extensive network of advisors & consultants to support the board.
NQ Minerals has a highly experienced board with considerable exper�se across the mineral and resource sectors.
Hellyer Processing PlantPROJECT REVENUE IN EXCESS OF USD$706M OVER 10 YEARS** Note: Highlights are based on most recent management evalua�on of the projects poten�al
Hellyer JORC COMPLIANT RESOURCE
RESOURCE* - 9.25mt
764,000 oz 2.57 g/t
27,000,000 oz 93 g/t
277,000 tons 3.05%
GOLD SILVER
RESERVES* - 8.04mt
664,300 oz 2.57 g/t
24,153,000 oz 93 g/t
245,400 tons 3.05%
205,000 tons 2.55%
217,000 tons 2.55%
LEAD ZINC
www.nqminerals.com
All suppor�ng informa�on, disclaimers, JORC Compliant resource reports and technical data is available on NQ Minerals Plc website @ nqminerals.com
This document is not intended to solicit buying in NQ’s shares on any of the trading pla�orms that NQ trades. Please consult a professional authorised financial adviser if you are considering buying NQ Mineral’s shares.