www.hilti.com 1
RE-ORDER POINT AND INVENTORY ANALYSIS
VISALIA DC
Kushaan ShahSummer 2013
www.hilti.com 2
Agenda
● PROJECT BACKGROUND AND GOALS
● DATA COLLECTION
● DATA ANALYSIS AND IMPROVEMENT PLANS
● CONCLUSIONS
● FUTURE OF PROJECT
● QUESTIONS
www.hilti.com 3
● As a global leader of value-added, top-quality products, two of Hilti’s main objectives are to:
• Increase the Quality of Service
• Optimize inventory
BACKGROUND
www.hilti.com 4
BACKGROUND
Increase Service Quality
• One of Hilti’s top objectives is to improve customer satisfaction by delivering customer orders in a punctual and convenient matter
• Logistics uses a metric called COP to measure “Complete Orders delivered from the Primary location”
• A product ordered from Visalia’s region should be shipped from 6150
• 1 point of HNA COP is equivalent to almost $250,000 in freight• Big financial implications
• The target COP rate is 90% for each Distribution Center (Completed Primary Orders/Total Orders)
www.hilti.com 5
BACKGROUND
Optimize Inventory
• Hilti currently uses the SB8 calculation to increase inventory levels in the NDC’s
• In its distribution centers, Hilti is moving from the “Days of Coverage” Method to the more Optimal “ROP” method
• ROP Method is intended to offset inventory increase in NDC’s
• Days of Coverage was a “blanket” approach:• X and Y item from Miami will both have a 9 day average demand
• ROP is a more statistical approach • X and Y item will be distinguished by lead time and average
demand
www.hilti.com 6
• RP1 Calculation = Safety Stock + (Lead Time * Avg. Daily Consumption)
• Optimal for Stable Items and leads to Inventory Reduction• Calculated ROP (System)
• RP2 Calculation = Average Order Size + (Lead Time * Avg. Daily Consumption)
• Average Order Size = Quantity/Frequency• Used for more sporadic items when needed• Manual
• RP3 = Greater Value between RP1 and RP2• Done Manually
www.hilti.com 7
Visalia
• Visalia processes about 1,500 orders a week and is the largest DC after Tulsa and New Jersey
• Visalia accounts for roughly 13.6% of the HNA COP and more than 65% of the West Region
• ROP was implemented in Visalia on Week 24
www.hilti.com 8
GOALS
Project Goals:
• Analyze Hilti objectives in the context of a large distribution center
• Help implement ROP stocking logic within the Visalia DC
• Identify the most effective method to calculate manual ROP values
• Determine Impact of ROP on COP levels for Visalia DC
• Diagnose COP Failures and implement solutions to reduce failures
Ultimate Goal: • -5% Inventory Reduction and +8% Improvement in service quality
www.hilti.com 9
DATA COLLECTION
Data Collection Plan:
• Review COP Failures:• Used Business Analyzer Tool on Excel• Ran weekly query to pull order and material numbers that failed
COP for Visalia
• Root cause analysis on the availability failures:• Used SAP to pull relevant order and material data:
• Sales Order (VA03)• Date of Order, Amount of Material, Location
• Stock and Requirements Situation (MD04)• MRP Type, Purchasing Group, Material Status
• Stocks for Posting Date (MB5B)• Amount of Stock Available on Date of Order
www.hilti.com 10
COP FAILURE ROOT CAUSE PROCESS MAP
www.hilti.com 11
Visalia COP
Failure
Not enough stock
available
Item not on Planning
Cycle (ND)
Item was added after
order completed
Item is Discontinued
and is phasing out
Item is a repair part
(U26)
Item is a special order (U51 – U59)
Stock was available but
order was routed away
www.hilti.com 12
W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W2884.00%
85.00%
86.00%
87.00%
88.00%
89.00%
90.00%
91.00%
92.00%
Visalia COP%
ROP
www.hilti.com 13
No Stock Not Planned RWS Parts Item Added Specials Other Discontinued0
50
100
150
200
250
300
350
400
450
500
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
VISALIA COP PARETO
WEEK 24 – WEEK 28
www.hilti.com 14
Week 24 Week 25 Week 26 Week 27 Week 280
5
10
15
20
25
30
0%
2%
4%
6%
8%
10%
12%
14%
16%
Part Failures - Visalia COP
Week 24 Week 25 Week 26 Week 27 Week 280
5
10
15
20
25
30
35
40
45
50
0%
5%
10%
15%
20%
25%
30%
RWS Failures - COP
• Observation: Spike in Parts Failures after Week 26
• Due to the Harrisburg Spare part project, Visalia Repair Center is no longer shipping customer orders and all repair parts are temporarily routed to Tulsa NDC
• Observation: Spike in RWS Failures after Week 26
• Material Number 387514 is reserved for a large project and will continue to route away until order is complete
www.hilti.com 15
ROP
W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W2884.00%
85.00%
86.00%
87.00%
88.00%
89.00%
90.00%
91.00%
92.00%
0.0028
0.0226
0.0129
0.0198
0.01350.0157
RWS: 387514
Parts
Visalia
www.hilti.com 16
• Roughly 50% of all failures in a week are attributed to availability
• Analyzed “Material Movements” to view schedule of replenishments• Occasionally, a large order will deplete stock
• Also checked for National or Local Outages • A national outage will subsequently route the item to the closest DC
with available stock
• Graph – No Real Trend for Availability Failures as of yet
Week 24 Week 25 Week 26 Week 27 Week 280
20
40
60
80
100
120
140
0%
10%
20%
30%
40%
50%
60%
Availability or “No Stock” Failures - COP
www.hilti.com 17
• Monitored a QRS – UVW chart to check for erratic items
• QRS• Number of Hits in last
6 months• UVW
• Variability from Normal Order Quantity
• Action:• QW and QR changed to
RP2 (Average Order Size)• Result:
• Decrease in QW and QR
• In the future, there are plans to start a process of upstreaming very sporadic items (S) to the NDC’s
www.hilti.com 18
Week 24 Week 25 Week 26 Week 27 Week 280
10
20
30
40
50
60
70
0%
5%10%
15%20%25%
30%35%40%
Not Planned Failures - COP
• Checked weekly for not planned materials with a high frequency• Demand Hits: Items with more than 3 hits in the last 6 months • Hilti currently has a process in place which reviews ND’s monthly
• For these particular items, looked at the TABCD status, material status, and purchasing group
• MRP type is set to Y5 and a manual ROP (RP2) is turned on for items using average order size, daily demand, and lead time
• To date, 24 Items have been turned on for Visalia
• Result: Decrease in “Not Planned” Failures
www.hilti.com 19
Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 283,000,000.00
3,100,000.00
3,200,000.00
3,300,000.00
3,400,000.00
3,500,000.00
3,600,000.00
3,700,000.00
3,800,000.00
3,900,000.00
4,000,000.00
4,100,000.00
Inventory MUSD DC's
• Inventory Value (Provided by Global Team)• Biggest success is the money saved on inventory• 16.8% decrease in Inventory amount – 649,293 in reduction • $77,915.16 in annual savings (based on a 12% carrying cost)
www.hilti.com 20
CONCLUSIONS
• Despite a slight decrease in COP, there is an offsetting savings in inventory carrying costs. What is the impact?
• Visalia DC annual inventory savings: $77,915 • Calculated from carrying cost at 12%
• Visalia DC COP from week 24 -28:• We have seen a .62% decrease in Visalia (if we disregard the
failures due to Harrisburg and item 387514)• Loss of $24,800 annually in transportation costs
• +1% on Visalia COP -> 0.16% rise in HNA COP (+ $40,000)*• -1% on Visalia COP -> 0.16% fall in HNA COP (- $40,000)*
*Based on $250,000 freight cost with all else equal
www.hilti.com 21
• COP relies on many factors outside of ROP and is fluid in nature. • If ROP is helping us save money on inventory regardless of a
slight decrease in COP, its implementation should be encouraged
• Inventory shortage, unpredictable orders, and sporadic demand are all problems that we cannot eliminate but work to reduce. There are many factors of COP that are out of our control
• Manually monitoring COP failures, adjusting ROP levels where needed, and distinguishing materials by their demand nature can help combat some of the shortfalls
• It is recommended to have a manual eye even with automation
• Four or five weeks is not enough to see the full impact • Short-term setbacks can be offset by long-term objectives
• Conclusion: Keep manually monitoring COP and adjusting ROP levels
CONCLUSIONS
www.hilti.com 22
FUTURE
• Will continue analyzing Visalia• Note any changes in Stock Availability
• Replicate project with another large Distribution Center• Toronto Roll-Out is being scheduled
• RP3 Calculation to be automated • Will take the optimal value between RP1 and RP2