C O D E R E Q U I R E M E N T S
Water Efficiency (WE) WE01 Minimum Water Fixture Efficiency WE02 Sub-metering of Water Supply WE03 Greywater Recycling
The calculation should be done using the calculator
available on this website
http://greenbuilding.web.id
Checklist for all code requirements lists the required
documents is also available on this website
http://greenbuilding.web.id
1
WA
TE
R E
FF
ICIE
NC
Y
table of contents
C O D E R E Q U I R E M E N T01
INTRODUCTION
Water Supply in Jakarta
Flooding and Fresh Water Loss
Groundwater Over-expliotation and Land Subsidence
EFFICIENT FIXTURES
Water Efficient Flushing System
Water Efficient Fixtures
SUB-METERING OF ALL MAJOR WATER CONSUMING SYSTEMS
GREYWATER REUSE
COOLING TOWER WATER EFFICIENCY
CONDENSATE WATER HARVESTING
RAINWATER HARVESTING
Catchment Area
Gutter
First Flusing
ABSORPTION WELL
Bioretention System
WATER EFFICIENT FIXTURES AND EQUIPMENT
ON SITE ALTERNATIVE WATER SOURCE
RAINWATER COLLECTION SYSTEM
SUB-METERING OF WATER SUPPY SYSTEM
OTHER RELATED CODES
14
15
15
16
17
19
22
23
25
25
27
28
2
3
5
5
12
30
33
8
8
8
10
10
11
JAKARTA GREEN BUILDING USER GUIDE
VOL. 5
WATER EFFICIENCY
D E S I G N P R I N C I P L E S
C A S E S T U D Y
02
03
Filter
Storage System
24
25
25
APPENDIX
2
WA
TE
R E
FF
ICIE
NC
Y
Water is an essential resource for life and good health, but about a third
of the global population does not have access to clean water to meet its
daily needs. Although a large portion of our planet contains water, most
of it is salty and thus not consumable. Freshwater comprises only 2.5% of the total water on earth, 70% of which is locked in glaciers and permanent snow cover. This limited sources combined with
massive global demand of fresh water has led to global water scarcity.
The situation is getting worse as needs for water rise along with
population growth, urbanization, urbanization and increases in
household and industrial uses.
Almost one fifth of the world’s population (about 1.2 billion people)
lives in areas with water scarcity. Water scarcity can occur even in
areas with plenty of rainfall or freshwater, if it is not well protected,
used and distributed.
1 Water Resources Institute. (http://www.scienceforums.com)
Global Water Distribution1
F I G U R E . 0 1
0.9%Others (Incl. soil soisture, swamp water, and permafrost)
68.9%Glaciers & Permanent Snow Cover
Out of 100% Global Water in the world, 97.5% of it is unconsumable Salt Water, and oly 2.5% is Freshwater.
29.9%Ground Water
0.3%Freshwater Lakes & River Storage (Only this portion is renewable)
Water Efficiency:An Introduction
3
WA
TE
R E
FF
ICIE
NC
Y
Although Jakarta’s 2010 published per capita water consumption of 78
litres/day3 looks quite good as compared to the average for 22 other
Asian Cities (278 litres/person/day), it does not portray the entire picture.
It represents only the total volume of water sold by the water company,
which does not serve 46% of Jakarta’s water needs. This shortfall is
mostly met by extracting ground water. An unauthorised water supply
system supplies bottled ground water to a large segment of the market.
About 70% of households depend on ground water supply.
2 World Resources Insitute’s Aqueduct. (http://www.wri.org/our-work/project/aqueduct)
3 Siemens Asian Green Cities Index 2013. (http://www.siemens.com/entry/cc/en/greencityindex.htm)
4 Research report by The Asian Development Bank.2004. Water in Asian cities: Utilities’ Performance and Civil Society Views. (http://www.adb.org/sites/default/files/pub/2004/water_asian_cities.pdf)
Global Water Risk2
Jakarta’s Water Supply and Usage
(in percentage)4
F I G U R E . 0 2
F I G U R E . 0 3
Low risk (0-1)
Medium to high (2-3)
High risk (3-4)
Extremely high risk (4-5)
No Data
Low to medium (1-2)
29%Non Domestic
54%Centralized Piped Water Network
46%Ground Water
20%Domestic
51%NRW
Source: The Asian Development Bank.
W A T E R S U P P L Y I N
J A K A R T A
Annual Water Use Water Supply in Jakarta
Jakarta faces multiple challenges related to water management and
efficiency, despite having ample natural supply through rivers and rainfall.
These challenges include diminished freshwater supply, flooding and land
subsidence due to excessive groundwater exploitation.
4
WA
TE
R E
FF
ICIE
NC
Y
Moreover Jakarta loses an estimated 50% of its water supply to
leakage5, one of the highest rates in Asia.
Jakarta is blessed with 13 rivers that could potentially be used for its
water needs. Unfortunately, these rivers get heavily polluted after
entering the city and are not usable for raw water supply. Cleaning up
the rivers and diverting sources of their pollution could provide a viable
source for the city’s growing water needs. According to a 2011 report
by Jakarta Environmental Management Agency (BPLHD), 71% of the
city’s river water is heavily polluted, 20% is partly polluted, and 9% is
lightly polluted.
Piped water supply in Jakarta is characterised by poor levels of access
and quality. Reliability, limited coverage of the piped network, the
low cost of groundwater, and water quality are important factors in
determining consumer preference for groundwater. This preference for
groundwater has led to excessive groundwater use and theft, which is
causing significant land subsidence, pollution and salinization of aquifers
and increased levels of flooding.7
5 Based on source water lost through network.6 The World Bank.7 Law, Environment and Development Journal LEAD Journal, Volume5/L, at www.lead-journal.org
Jakarta Rivers Before and After Entering the City6
F I G U R E . 0 4
5
WA
TE
R E
FF
ICIE
NC
Y
Jakarta experienced floods in 1996, 2002, 2007, and 2013 with
devastating consequences on human life and the socio-economic
conditions. The 2007 flood inundated more than 70% of the city and sent
about 450,000 fleeing their homes. Expenditure in flood control in the
period 1995 - 2001 amounted to about IDR 239 billion (USD 23 million).8
Groundwater extraction in Jakarta significantly exceeds groundwater
recharge, leading to a falling groundwater table and increased land
subsidence. Land subsidence was first identified when cracks were
discovered in the Sarinah bridge in 1978. Within the past 20 years, land
has subsided up to 57 cm in North Jakarta and 28 cm in South Jakarta.
With the alarming average subsidence rate of 10 cm/year, combined with
rising sea water level, it is predicted that roughly 32.5% of Jakarta area
will be under the sea in 2050, displacing millions of people and rendering
most of the north Jakarta area uninhabitable (see Figure 6).
Numerous reasons for the increased flooding have been put forward,
including:
• Drastic reduction in green open spaces resulting in increased water
runoff and sedimentation in rivers. The reduced infiltration is also
primarily responsible for the depleted groundwater table.
• Lack of an adequate garbage disposal system, resulting in pollution
and choking of rivers.
Flooding in Jakarta in 2012-20139
F I G U R E . 0 5
F L O O D I N G & F R E S H W A T E R
L O S S
G R O U N D W A T E R O V E R -
E X P L O I T A T I O N A N D L A N D
S U B S I D E N C E
8 Law, Environment and Development Journal LEAD Journal, Volume5/L, at www.lead-journal.org8 The World Bank.
6
WA
TE
R E
FF
ICIE
NC
Y
Jakarta Topography Condition Prediction
by 205010
F I G U R E . 0 6
Below average sea level
2000Around 5.1% of Jakarta Capital City area is under the average sea level.
2007Around 8.5% of Jakarta Capital City area is under the average sea level.
2012Around 12.1% of Jakarta Capital City area is under the average sea level.
2025Around 20.5% of Jakarta Capital City area will be under the average sea level.
2025Around 32.5% of Jakarta Capital City area will be under the average sea level.
Above average sea level
Unfortunately, most of the high density buildings requiring deep
groundwater supply are located in the critical zones for groundwater.
This highlights the importance of reducing water consumption in
buildings and using reclaimed and alternate water sources to minimize
the negative ecological impacts.
Deep Groundwater Condition in Jakarta in 200310
F I G U R E . 0 7
Critical Zone
Danger Zone
Alert Zone
10 Firdaus, Indonesia Water Institute-2013.
With the assumption of constant subsidience rate from 2000 to 2050 and the sea level rise is 6 mm/year
7
WA
TE
R E
FF
ICIE
NC
Y
Shallow Groundwater Condition in Jakarta in 200210
F I G U R E . 0 8
Critical Zone
Danger Zone
Alert Zone
It is clear the water problems in Jakarta needed to be addressed by an
integrated approach of appropriate utilization & management of surface
water, ground water & rain, waste treated water.
This code attempts to address the water related challenges in Jakarta by:
• Reducing the demand for municipal and ground water (through
efficient fixtures, rainwater harvesting and recycling).
• Reducing the runoff (through rainwater collection and absorption
wells).
10 Firdaus, Indonesia Water Institute-2013.
8
WA
TE
R E
FF
ICIE
NC
Y C
OD
E R
EQ
UIR
EM
EN
T
Faucets/fittings should not exceed the maximum flow rates and flush
capacities listed below.
Recycled water from Sewage Treatment Plant should be used for
secondary water consumption.
Air conditioning condensate harvesting should be used for secondary
water consumption.
Landscape irrigation should use water sources other than groundwater
and municipal water supply (PDAM).
The applications of alternative water sources and its usages should
follow the schematic diagram in Figure 9.
All faucets/fittings should have pressure range from 0.5 to 5.5 bars.
(1)
(1)
(2)
(3)
01 code requirement
C O D E R E Q U I R E M E N T 1Water Efficient Fixtures and Equipment
C O D E R E Q U I R E M E N T 2On site Alternative Water Source
A R T I C L E1 5
A R T I C L E1 7
P R O D U C T S / F I T T I N G S Maximum Flow Rate/Flush Capacity Requirements
Shower Taps & Mixers
Basin Taps & Mixers
Sink/Bip Taps & Mixers
Showerheads
Flushing Cisterns (per Flush)
Urinals & Urinals Flush Valve
(per Flush)
9 litres/min
6 litres/min
8 litres/min
9 litres/min
Dual flush 4.5 litres (full flush)
1.5 litres
Water Fixure Flow Rate/Flush Capacity RequirementsT A B L E . 0 1
9
WA
TE
R E
FF
ICIE
NC
Y C
OD
E R
EQ
UIR
EM
EN
T
Alternatively, instead of having air condensate for graywater system,
it can be connected to the rainwater collection pipes to further reduce
consumption from PDAM and deep groundwater source.
Schematic Diagram of Clean and Recycled Water
System (Alternate 1)
Schematic Diagram of Clean and Recycled Water
System (Alternate 2)
Schematic Diagram of Recycled Water Use
roof rainwater collection
roof rainwater collection
condensate water
condensate water
floor drain, basin
floor drain, basin
WC
WC
condensate water
condensate water
floor drain, basin
floor drain, basin
WC
WC
condensate water
condensate water
ground rainwater collection
ground rainwater collection
floor drain, basin
floor drain, basin
STP
STP
WTP
WTP
solid waste (handled by IPLT)
solid waste (handled by IPLT)
PDAM
PDAM
ground water(if apply)
ground water(if apply)
filter
filter
filter STP
solid waste
collection point
WC
WC
F I G U R E . 0 9
F I G U R E . 1 0
F I G U R E . 1 1
water collection
water collection
raw water storage
raw water storage
absorbtion well/pool
absorbtion well/pool
city drainage
city drainage
clean water storage
clean water storage
treated water storage
treated water storage
clean water
treated water storage
(if out of cappacity)
(if out of cappacity)
recycled water consumption
recycled water consumption
clean water consumption
clean water consumption
grey w
ater
black w
ater
(if applicable)
(for area with high permeability
soil)
(for area with high permeability
soil)
surface irrigation
hand basin
shower bath
clothes washer
cooling towertoilets
10
WA
TE
R E
FF
ICIE
NC
Y C
OD
E R
EQ
UIR
EM
EN
T
Rainwater collection system needs to be provided. The volume of the
rainwater collection system (in m3) shall be 0.05 m (zero point zero five
meter) X ground floor area (in m2).
Absorption wells and absorption pools should be provided as per
Governor Regulation No 20, 2013 on “Absorption Well”, shown in the
following table.
Planning should include planning for placement of measuring tools for
water consumption (water sub-meter) at the following locations:
a. water consumption system from the City Owned Water Supply
Company and/or ground water;
b. water consumption recycling system; and
c. other additional water supply system in the event the two above-
mentioned systems are insufficient.
Increase the size of the rainwater collection system as per the
description below, instead of providing absorption wells and pools in
locations where:
a. Depth of surface of ground water is ≤ 1.5 m (one point five meters) in
wet season; and/or
b. Soil with water permeability < 2cm/hour (two centimeters per hour).
The rainwater collection system planning scheme shall follow the chart
as contained in Figure 9 or Figure 10 above.
(1)
(2)
(2)
(1)
(2)
C O D E R E Q U I R E M E N T 3Rainwater Collection System
C O D E R E Q U I R E M E N T 4Sub-metering of Water Supply Systems
A R T I C L E2 2
A R T I C L E1 6
A R T I C L E2 3
B U I L D I N G C O V E R A G E(m2)
V O L U M E(m3)
50
51 - 99
100 - 149
150 - 199
200 - 299
300 - 399
400 - 499
500 - 599
600 - 699
700 - 799
800 - 899
900 - 999
2
4
6
8
12
16
20
24
28
32
36
40
Volume of Absorption Well Based on Building
Coverage
T A B L E . 0 2
11
WA
TE
R E
FF
ICIE
NC
Y C
OD
E R
EQ
UIR
EM
EN
T
(1)
(2)
(3)
(4)
A P P L I C A B L E S T A N D A R D SOther Related Codes
To meet the requirements, at least 4 sub meters should be installed
following the schematic diagrams shown in Figure 12 below:
A more elaborated water metering system for better water
management and efficiency is discussed in the Design Principles
section of this guideline.
Demand Management, Sub-metering of Water Supply Systems,
Groundwater Extraction Control (Governor Regulation Number 156
Year 2010 on Energy and Water Saving).
Rainwater Harvesting System and Zero Run Off Policy (Governor
Regulation Number 20 Year 2013 on Infiltration Well).
SNI 03-6481 concerning Plumbing System.
SNI 03-7065-2005 concerning Plumbing System Design Guideline.
Schematic Diagram ofSub-metering System
F I G U R E . 1 2
PDAM
PDAM
rainwater
rainwater
ground water
ground water
black & grey water
black & grey water
condensate water
condensate water
water collection
water collection
raw water storage
raw water storage
water storage
water storage
clean water storage
clean water storage
clean water consumption
clean water consumption
recycled water consumption
recycled water consumption
WTP
WTP
STP
STP
filter
filter
M
M
M
M
M
M
M
M
M
water meter
12
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
02 design principles
Understanding water utilization patterns in buildings is important to develop efficient system and effective water management strategies. The charts below show typical water use break down in typical commercial and instutitional facilities in Singapore. The patterns in Jakarta are expected to be fairly similar to these.
Typical Water Use Breakup in Singapore11
F I G U R E . 1 3
Schools
Commercial Office Buildings
Government Office Buildings
Hotels
Toilet
General washing & irrigation
Laundry
General washing & other amenities
Staff/worker
Restaurant
Irrigation
Swimming pool
Guest room
Toilet & pantry usage
Cooling system
53.1%
0.3%
31.0%
28.0%
4.0%37.0%
39.0%12.0%
5.0%1.0%2.0%3.0%
4.0%
34.0%
51.0%
8.0%
41.0%
46.6%
11 Singapore PUB (Public Utilities Board). The National Water Agency of Singapore. 2011. Water Efficient Building Design Guide Book. Singapore: Stallion Press.
13
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
As Figure 13 shows, most water is used for non-potable purposes,
regardless of building types. This indicates a huge water saving
opportunity through reclaimed water system, rain water harvesting and
air conditioning condensate, which are suitable for non-potable uses such
as irrigation, general washing and cooling system.
Using rain water and air conditioning condesate as alternative water
source is particularly interesting as Jakarta is characterized by tropical
climate with relatively high rainfall and relative humidity.
Significant water saving can also be obtained through the utilization of
water efficient fixtures. As indicated in Table 3 below, installing efficient
fixtures and faucets in these areas can lead to substantial water saving.
Reducing water consumption from primary sources (e.g. PAM and deep
well) has multiple benefits. Due to increasing demand and diminishing
supply, cost of water supply is increasing. Any reduction in consumption
directly reduces the building’s water supply costs and wastewater
disposal charges. It can also reduce associated energy costs, such as
treatment, pumping and water heating. Building’s water supply, cleaning
and storage system can also be reduced in size, thus saving capital costs.
Some of the most effective ways of reducing potable water consumption
in buildings are:
1. Efficient Fixtures
2. Sub-metering of all major water consuming systems
3. Grey water reuse
4. Cooling tower water efficiency
5. Condensate water harvesting
6. Rainwater Collection
Areas of Main Improvement Potential12
T A B L E . 0 3
B U I L D I N G T Y P E
Areas with Main Improvement Potential
Toilet KitchenSinks LandscapingShower Heating/CoolingLaundry Pools Streril-
lizationResidential
Hotels
Hospitals
Schools
Offices
Shopping Centres
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
12 Arab Forum for Environment and Development (AFED). 2011. Water Efficiency Handbook, Second Edition.
14
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
E F F I C I E N T F I X T U R E S
Water efficient fixtures are now widely available. Reduction in water
consumption directly reduces the building’s water supply costs and
wastewater disposal charges. For example, 62% reduction in water
usage was achieved at a rest stop that was equipped with ultra-
low-flow toilets and waterless urinals.13 Table 4 below outlines the
recommended maximum flow rate or flush capacity to further reduce
water consumption.
Analysis for various building types in Jakarta has shown savings in
water consumption between 8% and 39% through the use of water
efficient fixtures.
13 American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE). 2006. ASHRAE green guide: The Design, Construction, and Operation of Sustainable Buildings. USA.
14 IFC analysis for Jakarta.
Typical Efficient FixtureT A B L E . 0 4
P R O D U C T S /F I T T I N G S
Maximum Flow Rate/Flush Capacity
Requirement Recommended
Shower Taps & Mixers
Basin taps & mixers
Showerheads
Sink/Bip Taps & mixers
Flushing cisterns
Urinals & urinals flush valve
9 litres/min
6 litres/min
9 litres/min
8 litres/min
4.5 litres (full flush)
1.5 litres
7 litres/min
4 litres/min
7 litres/min
6 litres/min
4 litres (full flush)
1 litres
Potential Saving by Using Water Efficient Fixtures14
F I G U R E . 1 4
5 2515 35 450 2010 30 40
School
Hospital
Office
Apartment
Retail
Hotel
Percentage Reduction in Fresh Water Consumption
35
39
14
24
25
8
15
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
13 The Renovator’s Supply, Inc. How a Dual Flush Toilet is Better than Standard Toilet. (http://www.rensup.com/blog/post/dual-flush-toilets)
Efficiency Using Dual Flush System15
F I G U R E . 1 5
160
140
120
100
80
60
40
20
018.9
litre/flush7.6
litre/flush11.4
litre/flush3.8
litre/flush3.8
litre/flush
Among all the water consuming fixtures in typical commercial and
residential buildings, toilet flushes consume the most amount of potable
water. In some cases, this can add up to 75% of the total water use in
the building. Efficient dual flush systems that use only about 4.5 liters
for a full flush and 3 liters for a half flush, this consumption can be cut
down significantly.
Washing hands and ablution can use up a lot of water in typical
Jakarta buildings. Faucets using up to 23 liters/min are still used in some
buildings, even though efficient faucets that use as little as 7 liters/min
are available. Lower flow rates are possible if the faucets are fitted with
tap aerators. A study done by Singapore Public Utilities Board (PUB)
indicates that flow rates as low as 2 liters per minute may be sufficient
for normal washing purposes in toilets.
Water Efficient Showerhead. A normal showerhead has a flow rate of
up to approximately 12 liters/min. A water efficient showerhead helps to
reduce the water usage without affecting the comfort level of the water
pressure for users.
Flushing of urinals can use a lot of water as well, according to an
estimate up to 20% of the total in a typical commercial building.
Waterless urinals completely eliminate water use in urinals using a one
way valve and a cartridge that prevents backflow and odors. For urinals
that use water, it is recommended to specify them with 1 Litre/flush
or less.
W A T E R E F F I C I E N T F L U S H I N G
S Y S T E M
W A T E R E F F I C I E N T
F I X T U R E
Water Consumption of Typical Toilet Flush System (m3/year)
Single Flush
Dual Flush
16
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
S U B - M E T E R I N G O F A L L M A J O R W A T E R C O N S U M I N G S Y S T E M S
A very important strategy in water management is monitoring
consumption using sub-meters. While metering does not save any
water directly, it has an indirect impact of increasing user awareness of
consumption. Accurately measuring water use can help facility managers
identify areas for targeted reductions and to track progress from water-
efficiency upgrades. Submeters can also help identify leaks and indicate
when equipment is malfunctioning.
Although the code regulates having sub-meters only for the supply
stream if multiple water sources are used, it is recommended to have
sub-meter for the water consuming systems. Metering and recording
water consuming systems assist the building manager in isolating over
consumption and leakage problems in each consuming system. For
example, installation of sub metering system in University of California,
Berkeley campus buildings in USA revealed that 71% of the water
fixtures used 7.6 - 15 liter/flush, more than the rated 6 liter/ flush.
This indicated leakages in the system, and fixing the problem led to
significant water savings.17
An Example of Water Consumption Chart16
F I G U R E . 1 6
1200
1100
1000
900
800
700
600
500
1 5 93 7 112 6 104 8 12
October (2008)
This sudden peak may indicate a leak in the piping system
16 Singapore PUB (Public Utilities Board). The National Water Agency of Singapore. 2011. Water Efficient Building Design Guide Book. Singapore: Stallion Press.
17 The Green Initiative Fund. University of California, Berkeley. Water Metering and Sub-Metering of UC Campus Buildings. (http://tgif.berkeley.edu/index.php/funded-projects/projectstatuses/61-watermetering)
17
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Simple Grey Water Treatment Proses
F I G U R E . 1 8
A Schematic Diagram of the Locations tf Water Meters
Being Installed in Singapore
F I G U R E . 1 7
Source: The Renovator’s Supply, Inc. How a Dual Flush Toilet is Better than Standard Toilet (http://www.rensup.com/blog/post/dual-flush-toilets)
Fire Fighting System
Potable
Hosereel System
East Wiring Cooling TowerPotable
Water
NEWater
Cafetaria/Childcare
Flush Valve System
Landscape
Potable Water
Cooling Tower
M
M
M
M
M
M
M
M
M
M water meter
G R E Y W A T E R R E U S E
In commercial settings where bath, dish, and laundry water is available,
grey water reclamation after solid waste removal can provide a reasonable
payback of investment. The reclaimed greywater can be used for
applications such as toilet flushing, condenser water, and site irrigation.
Greywater is typically not suitable for use as potable drinking water.
Greywater use for irrigation and HVAC condensing water should be
carefully evaluated as harmful chemicals can be used to treat the
reclaimed water.
sewer
collection point
treated water
storage
grey w
ater black w
ater
(if applicable)
(overflow)
surface irrigation
hand basin
shower bath
clothes washer
cooling towertoilets
AQUACELL UNIT
Aero
bic
Screen
ing
Ultrastratio
n
Bio
log
ical T
reatmen
t
Ultravio
let D
isinfectan
t
Ch
lorin
e R
esidu
al P
rotectio
n
18
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Plaza Indonesia Reclaimed Used Water System18
Toilet with Greywater System
F I G U R E . 1 9
F I G U R E . 2 0
Greywater systems require significant design effort and initial cost, and
also bring the risk of contamination and pollution if mismanaged. Running
costs for more complex systems can be high, with system payback
potentially extending for many years. System maintenance and upkeep
also play important factors in choosing this water conservation method.
Filters, pumps, and treating stations all require attention. Grey water
systems are typically cost-effective in hospitality and similar buildings
with high-volume, regular non-biological contamination usage, such as
laundry plants coupled with large non-potable loads like toilet flushing and
landscaping irrigation.
Plumbing system for greywater should be clearly separated from the
blackwater system to prevent contamination.
Residential greywater systems in urban areas are typically limited to the
water from bathrooms. An innovative solution from Japan (Figure 20
below), combines the wash basins with the water cistern.
include using air handler condensate, single-pass cooling water,
rainwater, and foundation groundwater for cooling tower make-up water
and lawn irrigation. Reduced potable water use by more than 33% and
saved more than 6 million m3 of water in total since the program began
in the 1980s.19
The used water from the wash
basin is collected in the cistern
and used for toilet flushing.
University of Texas at Austin
has focused on recovering
and reusing water from onsite
alternative sources to serve non-
potable water needs. Retrofits
18 Firdaus and Indonesian Water Insittute. 2012.19 Water Sense, a US Environmental Protection Agency (EPA) program. 2012.
Watersense at Work: Best Management Practice for Commercial and Institutional Facilities Guidebook.
19
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
C O O L I N G T O W E R W A T E R E F F I C I E N C Y
Cooling tower water use in commercial building located in hot and humid
climate can consume one-third to half of the total building water usage.
Some cooling towers can use greywater (and other kinds of recycled
water) if certain water quality criterion is met.
Two Types of Cooling Tower in term of differences in air stream
direction; Counterflow Cooling Tower (left) and Crossflow
Cooling Tower (Right)20
Two Types of Cooling Tower in term of the differences in
refrigeration circuit; Closed or indirect Cooling Tower (left) and open or dirrect cooling
tower (Right)21
F I G U R E . 2 1
F I G U R E . 2 2
Counterflow Cooling Tower
Closed Cooling Tower
Crossflow Cooling Tower
Open Cooling Tower
To reduce water usage at cooling towers, the designer should focus on
the two factors that can be controlled: drift (water droplets that are carried
out of the cooling tower with the exhaust air) and blowdown (the removal
of circulating water to maintain the amount of dissolved solids and other
impurities at and acceptable level designated by the electrical conductivity
of the water). Evaporation is integral to a cooling tower performance and
cannot be reduced without an acceptable reduction in performance.
warm moist air out
warm moist air out
cold water out
dry air in
dry air in
warm moist air out
warm moist air out
cold water out
cold water out
centrifugal fancentrifugal fan
cold water out
Fill Media
Fill Media
Cold Water Basin
Cold Water Basin
Air Inlet Louvre
Hot Water Distributuon
Hot Water Distributuon
pump
20 Waterhouse Engineered Water. Tower Design. (http://engineeredwater.us/tower_design)
21 Betterbricks Powerful Energy Ideas, Delivered by NEEA. Cooling Tower. (http://www.betterbricks.com/building-operations/cooling-towers#TypesOfCoolingTowers)
20
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Four Ways of Water Leaves Cooling Tower System
F I G U R E . 2 3
Drift can be reduced by baffles or drift eliminators. Reducing blowdown
to the minimum level consistent with good operating practice can
conserve significant volumes of water. Reducing blowdown is the same as
increasing the condenser water cycles of concentration, which can be done
by multitude of ways. One way of increasing the cycle of concentration
while maintaining cooling tower and chiller performance is through
incorporating good water treatment program that includes chemical dosing
and careful monitoring of water parameters.
The relative water efficiency of a cooling tower is commonly measured
by computing the cycles of concentration. To measure cycles of
concentration, divide the conductivity of sump water by the conductivity
of the entering tap water. Many systems operate at two to four cycles
of concentration, while six cycles or more might be possible. Increasing
cycles from three to six reduces cooling tower make-up water by 20
percent and cooling tower blowdown by 50 percent.
Cooling Tower Water Usage at Various
Cycles of Consentration for 100-Ton Tower22
F I G U R E . 2 4
circulated cooling water
make up water suppy
chill
er
3
4 2
1
1
3
2
4
Fill Media
Cold Water Basin
Air Inlet Louvre
Hot Water Distributuon
Drift Loss
Evaporated Water
Blowdown
Leaks & Overflows
Cooling Tower Water Usage at Various Cycles of Concentration for 100-Ton Tower
7.500
7.000
6.500
6.000
5.500
5.000
4.500
4.000
3.500
3.000
1 53 72 64 8 9
Cycles of Concentration
Gal
lon
s p
er D
ay
22 EPA Water Sense. 2012. Best Management Practice for Commercial and Institutional Facilities.
21
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Percent of Make-Up Water Saved by Maximizing Cycles of Concentration23
T A B L E . 0 5
1.5
2.0
2.5
3.0
3.5
4.0
5.0
6.0
53%
30%
16%
7%
-
-
-
-
61%
42%
30%
22%
17%
13%
7%
3%
44%
17%
-
-
-
-
-
-
58%
38%
25%
17%
11%
6%
-
-
63%
44%
33%
25%
20%
16%
10%
6%
33%
-
-
-
-
-
-
-
56%
33%
20%
11%
5%
-
-
-
62%
43%
31%
24%
18%
14%
9%
5%
50%
25%
10%
-
-
-
-
-
60%
40%
28%
20%
14%
10%
4%
-
64%
45%
34%
26%
21%
17%
11%
7%
N E W C O N C E N T R A T I O N R A T I O (CRf)
IN
IT
IA
L C
ON
CE
NT
RA
TI
ON
R
AT
IO
(C
n)
3.5 7.02.5 5.0 9.02.0 4.0 8.03.0 6.0 10.0
These subtle improvements and modifications to the condenser water
system should be incorporated into the installation at the design level
to save significant amounts of water from the onset and provide an
efficient system. Minimizing the condenser water loss, ensuring proper
water treatment, and constant system service will save valuable
amounts of water.
The 1500 m2 Environmental Science Centre in Fort Meade, Maryland,
saved about 2,000 m3 of water and approximately $1,800 by reducing its
cooling tower blowdown.24
In Australia, water efficiency of cooling tower is done by:
• Correct assembly of float valves.
• Install meter conductivity and blow-down automation system at
conductivity level which has been determined in the water which will
be recirculated.
• Implement “performance-based” maintanance.
• Reduce heat load by increasing building energy efficiency.
• Increase whole air conditioning efficiency by system upgrading or
waste water treatment.
Additional Reference :The Australian Institute
of Refrigeration, Air Conditioning and Heating,
Best Practise Guidelines. Water Conservation in
Cooling Towers(http://www.airah.org.au/
imis15_prod/content_files/bestpracticeguides/bpg_
cooling_towers.pdf)
23 Water Sense, a US Environmental Protection Agency (EPA) program. 2012. Watersense at Work: Best Management Practice for Commercial and Institutional Facilities Guidebook.
24 US Environmental Protection Agency. Top 10 Water Management Techniques. (http://www.epa.gov/oaintrnt/water/techniques.htm)
22
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
C O N D E N S A T E W A T E R H A R V E S T I N G
In some airconditioning systems, it is feasible to collect condensate water
for uses such as irrigation, cooling tower make up, and toilet flushing.
In hot-humid climates, condensate from air conditioning can be a good
source of clean, cold water that is well-suited for reuse.
The volume of condensate generated depends upon the cooling load,
local temperature and humidity, make-up air volumes, and target indoor
temperature and humidity. As a rule of thumb, 0.1 to 0.3 gallons/hour of
condensate water can be generated per ton of cooling25. In hot-humid
climates, peak condensate production during summer months can be
assumed to be approximately 0.5 to 0.6 gph/1000 ft2 or 1.9 to 2.27
l/h/93m2 of cooled area.
Rice University in USA captures condensate water from many of its
buildings for use in the central plant’s cooling towers as make up water.
This systems is estimated to save at least 45.4 million liters of water per
year, which is equivalent to about 5 to 6% of Rice University’s annual
water consumption.
Schematic Diagram of Condesate Water for
Makeup Cooling Tower26
F I G U R E . 2 5
25 Guz, Karen. 2005. Condensate Water Recovery. Publised in ASHRAE Journal. (Vol 47, No. 6, June 2005).
26 Lucina and Sekhar, 2012. Energy and water conservation from AHU in hot and humid climate. Energy and Building Journal volume 45.
make up water suppy
make up water suppy
evaporation
COOLING TOWER
COOLING TOWER
AHU
CAP AHU
coo
ling
co
il
pre
-co
olin
g
coil
AHUAHU AHU
evaporation
Fill Media
Cold Water Basin
Air Inlet Louvre
Hot Water Distributuon
con
den
ser
con
den
ser
warm water
warm water
blowdown
blowdown
condensate
con
den
sate
wat
er f
rom
oth
er A
HU
s
condensate pump
pumpcondensatecollector
condensatecollector
23
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
United World College (UWC) South East Asia - East Campus, Singapore,
harvested about 1400m3 of condensate water in the first 5 months
(August - December) of operation. The harvested condensate water
reduces potable water consumption for cooling tower make-up while also
reducing the temperature of condenser water for the HVAC.
The G+20 Floor building’s HVAC system consisting fresh air handling
units typically can produce 2600 liters condensate water in 24 hrs and
78000 liters in a month at an average summer outdoor conditions, which
can be utilized trim down the demand of potable water and saving a
substantial amount of energy and carbon emissions.27
27 Khan, Shahid Ali. 2013. Conservation of Potable Water Using Chilled Water Condensate from Air Conditioning Machines in Hot&Humid Climate. Published in International Journal of Enggineering and Innovative Technology Volume 3, Issue 2.
28 UN. Habitat. Blue Drop Series on Rainwater Harvesting and utilization-Book 2: Beneficiaries and Capacity Building. (http://www.unwac.org/new_unwac/pdf/WATSAN_Normative_Pubs/Blue_Drop_Series_02_-_Capacity_Building.pdf)
29 UN. Habitat. Blue Drop Series on Rainwater Harvesting and utilization - Book 2: Beneficiaries and Capacity Building. (http://www.unwac.org/new_unwac/pdf/WATSAN_Normative_Pubs/Blue_Drop_Series_02_-_Capacity_Building.pdf)
R A I N W A T E R H A R V E S T I N G
Jakarta on an average gets about 1800 mm of rainfall annually, most of it
between November and April. For a roof area of 30 m2, a 5.5 m3 capacity
tank can provide daily reclaimed water supply of about 60 liters. This
highlights the potential of water saving through rain water harvesting.28
Rainwater harvesting can be implemented by collecting water at the
roof (roof catchment), or at the ground (ground catchment). The stored
rainwater can be used for laundry, toilet and urinal flushing, car washing,
and ornamental water features. It can even be used for cooling tower
make-up. The benefit of rain water harvesting is two fold. Firstly, it
reduces the expense of municipal supply or ground water extraction.
Secondly, it also reduces water run off to the city sewage and drainage
system thus mitigating Jakarta’s perennial flooding problems.
Average Rainfall Data for Jakarta29
F I G U R E . 2 6
Precipitation (mm)
Average Rainfall Days
125
100
75
50
25
0
JanuaryM
ay
September
March July
November
February
June
October
April
August
Decem
ber
Per
cip
itat
ion
(m
m)
24
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Roof Footprint Roof FootprintRoof Footprint
Roof Footprint Roof Footprint Roof Footprint
Figure 27 below outlines possible rainwater utilization based on
commercial building types and catchment areas.
Suitability of Commercial Rainwater Use30
Roof Footprint31
F I G U R E . 2 7
F I G U R E . 2 8
The size of the catchment area or roof will determine how much
rainwater that you can harvest. The area is based on the “footprint” of
the roof, which can be calculated by finding the area of the building and
adding the area of the roof’s overhang.
Equation below provides a calculation for rainwater capture potential.
Conversion factor of 0.623 is included to take into account capture
efficiency because some of the rainwater is lost through evaporation,
splashing, or other means.
C A T C H M E N T A R E A
30 Davidson, Guenter Hauber; Water Conservation Group. Supplementing Urban Water Supplies Through Industrial and Commercial Rainwater Harvesting Schemes. (http://www.watergroup.com.au/download/P_RWH-integrUrbWatSuplyGHDv1a070308.pdf)
31 Texas A & M Agrilife Extension. Rainwater Harvesting, Catchment Area. (http://rainwaterharvesting.tamu.edu/catchment-area/)
Possible
Not recommended
Acceptable
R A I N W A T E R(Roof Only)
S T O R M W A T E R(Roof & Ground)
Amenities/BathroomKitchen/Food PreparationHot Water SystemToilet FlushingLaundryIrrigationVehicle WashingCooling TowerPool Top-up WaterOther Process Water
25
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Channels all around the edge of a sloping roof to collect and transport
rainwater to the storage tank. The size of the gutter should be according
to the flow during the highest intensity rain. It is advisable to make them
10 to 15 per cent oversized. As a rule of thumb, one square inch (6.4 cm2)
of downspout area should be provided for every 100 square feet (9.29 m2)
of roof area.
A first flush device is a valve that ensures that runoff from the first spell
of rain is flushed out and does not enter the system. This needs to be
done since the first spell of rain carries a relatively larger amount of
pollutants from the air and catchment surface.
Storage system is used to store rainwater for later uses. It is one of
the most critical, and typically the most expensive component of the
rainwater system. Rainwater storage tank could be made of concrete,
wood, metal, clay or plastic.
The filter is used to remove suspended pollutants from rainwater
collected over roof. A filter unit is a chamber filled with filtering media
such as fibre, coarse sand and gravel layers to remove debris and dirt
from water before it enters the storage tank or recharges structure.
Charcoal can be added for additional filtration. Filter chamber can be
made manually and commercial filters are widely available.
Further discussions on filters can be found on the web such as: • Rainwater Harvesting Org. Components of A Rainwater Harvesting
System. (http://www.rainwaterharvesting.org/Urban/Components.htm)
• Freerain. Commercial Rainwater Harvesting Systems. (http://www.freerain.co.uk/commercial-rainwater-harvesting-systems.html)
For example, with an annual average of 1800 mm rainfall in Jakarta, a
catchment area (e.g. roof) of 5,000 m2, could harvest 1.8 m x 5,000 m2 x
0.623 = 5,607 m3 of rain water annually or equal to an average of 15.36 m2
per day.
To avoid water pollution, walls, roofs and gutters should not use asbestos
or toxic paints.
G U T T E R
F I R S T F L U S H I N G
S T O R A G E S Y S T E M
F I L T E R
Harvested water (m3) = average rainfall depth (m) x catchment area (m2) x 0.623 conversion32
32 Texas A & M Agrilife Extension. Rainwater Harvesting, Catchment Area. (http://rainwaterharvesting.tamu.edu/catchment-area/)
26
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Pumping Station
Supply
Pipe
Tank
Storage tank must be opaque and painted to inhibit algae growth, must be
covered and vents screened, and must be accessible for cleaning (if used
for potable system). The storage tank needs to be placed as close to the
catchment area as possible and the size determined by calculations based
on the demand, frequency of rainfall, surface area, budget and aesthetics.
Some of the elements of a typical rainwater harvesting system are
highlighted in the figure below.
Singapore offers interesting case studies of rainwater harvesting. Because
of low supply and high demand, country’s regulations have a strong
emphasis on rainwater collection. About 84% of the population lives in
high rise apartments. These buildings are required to collect rainwater in
cisterns on the roof. A recent study demonstrated an effective saving of
4% of the water used, the volume of which did not have to be pumped
from the ground floor. As a result of savings in terms of water, energy
costs, and deferred capital, the cost of collected roof water was calculated
to be S$0.96 against the previous cost of S$ 1.17 per cubic meter.
Rainwater Harvesting System for Reuse33
F I G U R E . 2 9
Rainwater Harvesting System at Changi
Airport, Singapore34
F I G U R E . 3 0
33 Toronto and Region Conservation, 2010. Performance Evaluation of Rainwater harvesting Systems. (http://sustainabletechnologies.ca/wp/wp-content/uploads/2013/01/FINAL-RWH-2011_EDIT3.pdf)
34 Rainwaterharvesting.org. Rainwater Harvesting in Singapore. (http://www.rainwaterharvesting.org/international/singapore.htm)
1
3
2
1
3
5
2
4
Collection System/Catchment Area (Such as roof)
Conveyance System (Infratructure that transport the water)
Storage System (Above & below ground cistern) Wrapped in geotextile & impremeable liner
Gutter around the building roof
Smart Pre-filter & First Flush
4
5 overflow to discharge
FOR USEtank access to raw water storage
Inlet Seal
Floating Intake
27
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Singapore’s Changi airport collects rain falling on the runways and the
landscaped areas in two reservoirs, that are used for toilet flushing
and fire fighter drills. This amounts to about 30% municipal water
consumption savings equivalent to about S$ 390,000 per annum.35
A B S O R P T I O N W E L L
Absorption wells are intended to capture, store and recharge
groundwater, while at the same time reduce runoff to the city drainage
system. Absorbtion system is applied to areas that have typically
sandy soils with acceptable permeability rates and with ground water
level below 1.5 m. However, many parts some parts of Jakarta are not
suitable for the application of absorption well. Therefore, results of soil
investigation should be examined before applying absorption well.
Asoprtion system for unconfined aquifer (air tanah dangkal) can be
implemented using apsorption pit (Lubang Resapan Biopori) or shallow
absortion well, while deep apsorption well utilizing injection system can
be used for confined aquifers.
Biopori (left) and Shallow Absorption Well (right)36
F I G U R E . 3 1
35 United Nations Environment Programme, Division of Technology, Industry and Economics. Rainwater Harvesting and Utilization, An Environmentally Sound Approach for Sustainable Urban Water Management: An Introductory Guide for Decision-Makers. (http://www.unep.or.jp/ietc/publications/urban/urbanenv-2/9.asp)
36 Peraturan Menteri Pekerjaan Umum No. 6 tahun 2011 tentang Pedoman Penggunaan Sumber Daya Air.
control pit
absorbtion well
10 - 30 mm
80 -
100
cm
The depth of the well depend on ground water level
gutter
to s
ewer
filter
organic material
COMPOSTING
28
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
Deep Absorbtion Well37
Bioretention System
F I G U R E . 3 2
F I G U R E . 3 3
Pipe
Sand
Gravel
Cement
Clay
Filter
control pit
gutter
absorption well
to s
ewer
from filter
concrete floor
filter
Bio retention systems treat stormwater by filtering runoff through planted
vegetation and percolating (drip feeding) the runoff through a filter
media, such as loamy sand. As the water is percolated through the soil,
pollutants are captured by fine filtration, absorption and biological uptake.
Excess water can be collected by under drain system and discharge to
the storm sewer system or directly into receiving water. Bio infiltration
systems typically are designed to store and treat run off from relatively
small storms. It should be located at least 3 metres away from buildings
to ensure water does not drain into the foundations.
B I O R E T E N T I O N
S Y S T E M S
37 Forum Teknik Sipil dan Arsitektur. Pemanfaatan Air hujan. (http://www.ilmutekniksipil.com/rekayasa-sumber-daya-air/pemanfaatan-air-hujan)
38 An Article about Bioretention System by Riversands. (http://www.riversands.com.au/bioretention-system.php)
Filter Media (sandy loam)
Transition Layer (course sand)
Drainage Layer (course sand/gravel)
Perforated Collection PipePossible Impervious Liner
0,2-0,5 m
1-3 m
0,1 m
0,15-0,2 m
0,3-0,7 m
29
WA
TE
R E
FF
ICIE
NC
Y D
ES
IGN
PR
INC
IPL
ES
A rain garden is a simple form of a bio-infiltration system, that is built in
shallow depressions or low-lying areas, with a planted or stone-covered
bed that is specifically designed to capture and absorb stormwater and
allow it to be slowly absorbed into the soil.
Rain gardens are suitable for sites that are sandy, gravellly, loam, or
a mix with up to 10 per-cent clay.Sites with mostly clay soil are not
suitable. The soil sould be permeable to depth of between 0.6-1.2 m
below the rain garden. The surface of depression should be at least 1 m
above seasonally high shallow groundwater. The rain garden also need
to be as level as posible, to ensure that water does not run over the
lower edge. If possible, slope greater than 12 percent should be avoided.
The placement of the rain garden could be at a low point or at a location
somewhere along the natural flow path.
Rain Garden Variation39
F I G U R E . 3 4
a) Planted with shrubs, tall grasses, ferns, and perennials.
b) Dry creek with pebbles, river stones, boulders, and plants.
All options over sandy to loam soil with organic matter. Infiltration bed under the surface as shown in option a) applies to all options.
c) On a slope, create a depression on the upper side and a berm on the lower side.original slope
39 An Article about Rain Gaden by Canada Mortgage and Housing Corporation. (http://www.cmhc-schl.gc.ca/en/co/grho/grho_007.cfm)
30
WA
TE
R E
FF
ICIE
NC
Y C
AS
E S
TU
DY
03 case study
Saving Clean Water Cost by Processing Used WaterP L A Z A I N D O N E S I A
Management of Plaza Indonesia (PI) has responded to the clean water
crisis faced by Jakarta due to insufficient clean water supply from
public water grid system (PAM Jaya) and relatively high cost of piped
water tariff (Rp. 12,550/m3). The problems of clean water supply for PI,
which has a total area of 404,100 m2, are exacerbated due to the new
regulation restricting deep ground water extraction and increasing tax.
Pergub DKI No 37, 2009 significantly increase deep ground water tax
from Rp. 4,400/m2 to Rp. 23,333/m2. This regulation is necessary to
mitigate the serious problem of land subsidence due to over extraction
of deep ground water in Jakarta.
Following the development and existing business opportunities, PI has
recently built Keraton Residential Tower (48 floors, 88 apartment units,
50,350 m2) and The Plaza Office Tower (47 floors, 62,650 m2), which
is going to increase the need for clean water and also the amount of
liquid waste generated. The facilities need at least 2,200 m3 of clean
water per day.
PI complex consists of Plaza
Indonesia Shopping Center
(4 floors, 62,750 m2), Grand
Hyatt Jakarta Hotel (26
floors, 447 rooms, 67,000
m2), and Plaza Indonesia
Extension (6 floors, 43,300
m2) equipped with an
underground parking facility
(Basement Parking) with an
area of 108,800 m2.
Plaza Indonesia
F I G U R E . 3 5
31
WA
TE
R E
FF
ICIE
NC
Y C
AS
E S
TU
DY
To cope with the high demand of clean water supply, PI management
has decided to reclaim water from its wastewater as an alternative
non-potable water source for toilet flushing, irrigation and cooling
tower. Besides environmental benefit such as reducing wastewater and
mitigating water scarcity and land subsidence issues, reclaiming water
also offers financial benefit to PI.
If the clean water is totally supplied by PAM Jaya, the cost will be at
least Rp. 10.08 billion (365 days/year x 2,200 m3/day x Rp. 12.550/m3)
annually. This figure significantly increases to Rp. 13.54 billion/year,
if 40% of the total requirement is taken from the deep groundwater.
In addition, PI must pay the cost to treat wastewater which by a
conventional system would cost at least Rp. 1.750/m3, leading to a
total cost of wastewater treatment to Rp. 1.12 billion/year (2.200 x 0.8
x 365 x Rp. 1.750/m3). Therefore, total cost for clean water supply and
wastewater treatment is estimated at least Rp. 11.2 billion/year.
By conducting a comprehensive retrofit of the wastewater treatment
systems, at least 1,500 m3 of a total of 2,200 m3 of the PI clean water
needs can be generated from the used water reclamation plant system
employing Membrane Bio Reactor technology (MBR) + Reverse
Osmosis Membrane. Total savings from reduction of clean water cost
is Rp. 2.92 billion/year plus the cost savings from wastewater treatment
at around Rp. 1.12 billion/year. So the total savings made by the
management of the PI is Rp. 4.04 billion/year. The total investment cost
to implement Sewage Treatment Plant (STP) retrofit at Plaza Indonesia
is around Rp. 15 billion with a payback period of about 3.7 years.
Sample of the Clean Water Resulted from the
Processed Wastewater with the Background of MBR Plaza Indonesia40
F I G U R E . 3 6
40 Firdaus, 2013.
32
WA
TE
R E
FF
ICIE
NC
Y C
AS
E S
TU
DY
Payback Period Calculation of Used Water Recycling SystemT A B L E . 0 6
I T E MN O Consumption(m3/Day)
Waterfare(IDR/m3)
Water Cost(Million IDR/Day)
Water Cost per Year (Billion IDR)
Saving Amount(Billion IDR/Year)*
Pam Water
Deep Groundwater
Used Water Treatment Cost
Used Water Treatment Cost
Total Investment Cost of Used
Water Reclamation Plant
Payback Period (Year)
1
2
3
4
5
2,200
2,200
2,200
2,200
12,550
23,333
1,400
7,211
27,61
51,33
3,08
15,86
10,08
18,74
1,12
5,79
4,29
12,95
-
0
15.00
3,5/1,16
*) Note: Relative to the use of water resulted from the used water treatment The calculation above is based on the used water total volume of 2200 m3/day.
Water reclaim system (grey water system) in high rise buildings in Jakarta
not only provides economic benefits (savings) as discussed above, but
also mitigates the problems of water pollution and helps overcome water
deficit in the deep ground water.
33
WA
TE
R E
FF
ICIE
NC
Y C
AS
E S
TU
DY
33
WA
TE
R M
AN
AG
EM
EN
T A
PP
EN
DIX
Water Saving Device and Approaches: Flush Mechanisms41
T A B L E . 0 1
appendix
F L U S H M E C H A N I S M A D V A N T A G E S D I S A D V A N T A G E S
When the handle is pulled, a piston lifts water to start a siphon, which empties the cistern into the toilet bowl. When the cistern is empty the siphon is broken and the cistern refills ready for the next flush.
Siphon MechanismWhen flush is initiated, the air valve lifted on the siphon is open; when flush is complete, the valve closed.
Drop-valve Mechanism
Siphon Mechanism
Push-button Flush, Drop-valve Mechanism
Siphon Mechanism
It may be more effective (and cheaper) to retrofit water saving devices to an existing siphon-operated mechanism than opt for a push-button, flush-valve mechanism because:• Thereislesschanceofleakage;• Afaultymechanismiseasytodetect—the
flush performance is poor;• Low-flushavailable(4.5litre);and• Lowcost.
• Retrofitavailable.• Easytofit.• Savingsofupto30%perflush.• Lowcost.
• Fastflush.• Push-buttonoperatedratherthanaleverfor
flush action.• Separatebuttonsforfullflushandshort-
better understand by user.• Allowslowerflushvolumesbygivinga
higher flow rate.• Lowcost.
• Twoflushvolumes.• Savingsupto30%perflush.• Lowcost.
• Choiceofflushvolumes(e.g.4/2.6,6/3,6/4litres maximum/minimum flush).
• Cannowberetrofittedtocisternsinstalledbefore 1999.
• Lowcost.
• Userstopstheflush(releaseslever)whenpan is clear.
• Savingsofupto30%perflush.• Lowcost.
• Compatibilitywithretrofitdevicedependson cistern design.
• Leveroperatedratherthanbuttons.Dualflush not as well understood by users as push-button flush valves.
• Occasionallyneedtoflushmorethanonceto clear the pan.
• Generally,notveryrobust.• Notalwayscleartouserhowtooperate
the device correctly, so potential for double flushing.
• Savingscanbeveryvariable.
• Valvewilleventuallyleak(whichcanbehard to detect).
• Poorinstallationcancausevalvemechanism to stick.
• Notasrobustasthesiphonmechanism.• Mayrequiremaintenancetoremove
limescale deposits.• Ifproblemsoccur,thevalvecannotbe
replaced with a siphon mechanism.
• Occasionallyneedtoflushmorethanonceto clear the pan.
• Notalwayscleartouserhowtooperatethedevice correctly.
• Poorinstallationcancausethebuttonstobe misaligned, resulting in poor flushing.
• Buttonsneedtobeclearlylabelledtoavoidconfusion and misuse.
• Notalwayscleartofirsttimeuserhowtooperate the device correctly.
• Potentialfordoubleflushing.
S I P H O N M E C H A N I S M
V A R I A B L E F L U S H
P U S H - B U T T O N F L U S H
D U A L F L U S H
I N T E R R U P T I B L E F L U S H
41 Working Together for a World Without Waste, Business Resource Efficiency Guide. Reducing Your Water Consumption. (http://www.wrap.org.uk/sites/files/wrap/WRAP_Reducing_Your_Water_Consumption_0.pdf)
34
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
Water Saving Devices and Approaches: Other42
T A B L E . 0 2
D E V I C E / A C T I V I T Y POTENTIAL WATER SAVINGS A D V A N T A G E S D I S A D V A N T A G E S
Also referred to as cistern displacement devices—CDDs
A flexible synthetic material partitions the cistern
• Low/nocost—canbeobtained from water supplier at little or no extra cost.
• Retrofit.• Easytoinstall.
0.5 to 2 litres per flush.
Up to 30% (between 1 and 3 litres per flush).
Up to 0.5 litres per flush.
• Nowaterinletduringflushing.
• Retrofit.
• Lowcost.• Retrofit.• Easytoinstall.• Powerofflushunaffected.
• Someofthesedevicesdeteriorateovertime and should be regularly checked and replaced if necessary, otherwise water use may increase.
• Volumeadjustersshouldnotbeusedin cisterns which were installed after January 2001, as from this date, all installed cisterns use a 6-litre flush. Using a volume adjuster in these products will result in a poor flush and can induce double flushing.
• Thedelayperiodneedstobechecked.
• Needtoensureagoodseal—canbea problem where limescale builds up.
C I S T E R N V O L U M E A D J U S T E R S ( C V A ’ S )
D E L A Y E D A C T I O N I N L E T V A L V E
C I S T E R N D A M
42 Working Together for a World Without Waste, Business Resource Efficiency Guide. Reducing Your Water Consumption. (http://www.wrap.org.uk/sites/files/wrap/WRAP_Reducing_Your_Water_Consumption_0.pdf)
35
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
The Main Advantages and Disadvantages of Urinal Water Saving Devices43
T A B L E . 0 3
D E V I C E / A C T I V I T Y POTENTIAL WATER SAVINGS A D V A N T A G E S D I S A D V A N T A G E S
A single valve such as a quarter turn ball valve can be installed in the pipework supplying the washroom.
A timer and solenoid valve can be installed on the pipework connected to the urinals, so that water supplied to the cistern is shut off during periods of non use.
• Lowcost.Typically around 70% but can be higher.
Typically around 70% but can be higher.
Typically around 70% but can be higher.
• Retrofitavailable.• Valveremainsclosedwhen
pressure remains unchanged (i.e.when urinal is not being used).
• Lowcost.
• Onlyapplicableifworkhoursare predictable.
• Requiresstaffreliability.
• Flushingisrelatedtooccupancy of washrooms rather than use of urinal.
• Onlyapplicableifworkhours are predictable.
M A N U A L S H U T O F F
P R E S S U R E - S E N S I T I V E H Y D R A U L I C V A L V E
T I M E R A N D S O L E N O I D V A L V E
A motion sensor is placed above the urinal to detect use. This controls a solenoid valve to allow a present volume of water into the cistern per use. When the cistern is full, the auto-siphon will automatically discharge and flush the urinal.
Barrierliquidcartridge/trap—acartridgecontaining a barrier fluid is inserted into the urinal bowl. The urine passes through the oil-based barrier fluid, which forms a seat preventing urine returning.
Deodorisingpad—apadimpregnatedwith a deodorising chemical which is inserted into the urinal outlet.
Chemicalandbiological—acartridgecontaining a chemical and microbial block is fitted into the urinal bowl or through to break down urinal and biofilm.
Chemical and microbiological blocks combinedwithaone—wayvalve—theseproducts are similar to the microbial blocks described above, but with the addition of a one-way valve to seal the waste pipe from the urinal.
Typically around 70% but can be higher.
Can reduce water use by 90%.
• Costeffective—ataround£170 and can be operated by battery (lifetime of between 3 and 4 years) or mains electricity.
• Retrofitavailable.• Easytoinstall.
• Disposeofthebatteryashazardous waste.
• Specialisedcleaning.• Barrierfluidneedstobe
replaced regularly.• Microbialblocksdissolve
and need to be replaced regularly.
P A S S I V E I N F R A R E D ( P I R ) S E N S O R
W A T E R L E S S U R I N A L S
43 Working Together for a World Without Waste, Business Resource Efficiency Guide. Reducing Your Water Consumption. (http://www.wrap.org.uk/sites/files/wrap/WRAP_Reducing_Your_Water_Consumption_0.pdf)
36
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
The Main Advantages and Disadvantages of Urinal Water Saving DevicesT A B L E . 0 3 (continued)
D E V I C E / A C T I V I T Y POTENTIAL WATER SAVINGS A D V A N T A G E S D I S A D V A N T A G E S
Cartridge/trap inserts containing a mechanicalsiphonvalve—thispreventsurine that has passed through it from returning to the bowl.
Vented—individualtrapsarereplacedby a single running trap installed at an angle of 1:18 to allow rapid run off of urine. A low wattage fan provides air flow in the system to remove odours.
Can reduce water use by 90%.
Can reduce water use by 90%.
• Mechanicalvalveremovesthe need for a barrier liquid.
• Nochemicals.• Singletrapeasytoclean.• Fanusesthesamepower
as mains-powered urinal controllers.
• Notavailableforretrofit;intended for use in specifically designed urinal bowls.
• Notsuitableforretrofit.
W A T E R L E S S U R I N A L S (continued)
37
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
Common Types of Device and Approach that are Available to Reduce Water Use through a Tap44
T A B L E . 0 4
I T E M A D V A N T A G E S D I S A D V A N T A G E S
Screwdriver/lever actuatedPrimary function is that of an isolating valve. However, the flow through the valve can be adjusted to reduce flow rate.
The tap nose contains small holes to force water out in the form of a mist or spray.
The design of the nozzle mixes air with the water under pressure. When the water exits the nozzle the air expands, increasing the apparent water flow. Tap aerators are often integrated with a flow regulator as a pressure compensating aerator (PCA).
Percussion taps/push-down tapsTo deliver flow, the user pushes down on the tap head. When the user removes their hand, the pressure generated inside forces the tap up and it automatically closes off the flow (after a delay period set of the time of installation). A delay period of between 15 and 20 second is generally suitable for hand washing.
An infrared sensor is located on the underside of the tap head. The sensor is triggered when the user places their hands under the tap head. The temperature is preset.
Relatively new, also known as ‘click’ or two stage taps. Flow rate typically between 5 and 10 litres per minute until a resistance point is reached. To open the tap any further requires additional force. Full flow setting typically between 10 and 20 litres/minute.
• Watersavingstypicallyaround50%,but dependent on end flow rate.
• Retrofitavailable.• Cheapandeasytoinstall.
• Watersavingstypicallyupto50%,butdependent on end flow rate.
• Canachievetypicalflowratesofbetween 4 and 8 litres/minute.
• Retrofitspray-tapnoseavailable.
• Watersavingstypicallyupto50%if fitted with a flow regulator, but dependent on end flow rate.
• Retrofitavailable.• Nosplashing.• Flowratereducedtobetween2and8
litres/minute.
• Retrofitavailable.• Automaticallyclosesafteruse.• Watersavingsupto50%,but
dependent on end flow rate and flow duration.
• Canachievetypicalflowratesofbetween 4 and 8 litres/minute.
• Paybackperiodcanbeafewmonths.
• Improvedhygiene—tapdoesnotneedto be touched.
• Watersavingsupto70%,butaredependent on the end flow rate and flow duration.
• Canachievetypicalflowratesofbetween 4 and 8 litres/minute.
• Providesuserflexibilitywherefasterfilling is sometimes required.
• Orificemayblockwithscalebuild-up.• Doesnotregulatepressure.
• Requiresmaintenancetopreventblockage.
• ThereisariskofLegionellaifthetapis not operated regularly.
• Doesnotregulatepressure.
• Noteffectiveatpressureoflessthan1bar (100kPa).
• Standardaeratorsdonotregulatepressure.
• Mechanismcanjam(hardwatercanbe a contributor).
• Delaycycleneedstobesetcorrectly.
• Retrofitnotapplicable.• Requiresenergy–mainsorbatteryto
operate.• Scaldingcanbeanissueifthe
temperature control is incorrectly set.• Ifsensorisfouledbysoap,thenwater
flow is continuous.• Coststypicallyaround£300/tap
means longer payback period.
• Fullflowsettingnotpressureregulated.
• Longerpaybackperiods(between£150and£200perunit).
I S O L A T I N G B A L L V A L V E
S P R A Y T A P
T A P A E R A T O R
S E L F - C L O S I N G T A P S
E L E C T R O N I C S E N S O R T A P
M I X E R T A P S F I T T E D W I T H A W A T E R B R A K E
44 Working Together for a World Without Waste, Business Resource Efficiency Guide. Reducing Your Water Consumption. (http://www.wrap.org.uk/sites/files/wrap/WRAP_Reducing_Your_Water_Consumption_0.pdf)
38
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
Common Types of Device and Approach that are Available to Reduce Water Use through a TapT A B L E . 0 4 (continued)
I T E M A D V A N T A G E S D I S A D V A N T A G E S
Changes in water pressure or temperature cause the thermostat element to expand or contract. This in turn moves the slide valve which alters the proportion of hot and cold water entering the TMV, thus maintaining the mixed water temperature.
Avoids long periods of running water to get the desired temperature.
Soap dispenser delivers a ball of foam/mousse.
Relatively new. They allow the user to push a button to override a default lower flow rate setting to provide a higher flow rate delivery mode. The flow rate is controlled by an integrated flow regulator.
Flow regulators are designed to maintain a constant flow independent of supply pressure. Often integral in ‘water efficient’ taps at time of purchase.
• Watertemperatureisset—useslesswater at initial draw-off.
• Onlyonetapmayberequired.• Savingscanvary.
• Useslesswateratinitialdraw-off.• Savingscanvary.
• Smallamountofsoaprequiredperevent (water saving of up to 50%).
• Whenuserrubshandstogether,foam/mousse reduces to a small volume that requires less water to rinse from hands.
• Watersavingstypically50%inwatersaving setting.
• Providesuserflexibilitywherefasterfilling is sometimes required.
• Retrofitavailable,easytofit.• Regulatesflowregardlessofpressure.• Flowregulatorscanbedesignedto
operate at different flow rates.• Lowcost.
• Longerpaybackperiodsforthemoreexpensivevalves(between£50and£200perunit).
• Capitalcostsforinstallationofheater.
• Mayrequirenewsoapdispenser.
• Notalwaysavailableasretrofit,oftenincorporated into existing tap ranges.
• Notwaterefficientintheoverridemode.
T H E R M O S T A T I C M I X E R V A L V E ( T M V )
P O I N T - O F - S O U R C E H E A T E R
F O A M S O A P
E C O - B U T T O N S
T A P F L O W R E G U L A T O R
39
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
Common Types of Device and Approach that are Available to Reduce Water Use through a Shower45
T A B L E . 0 5
I T E M WATER SAVINGS A D V A N T A G E S D I S A D V A N T A G E S
Screwdriver/lever actuatedPrimary function is that of an isolating valve. However, the flow through the valve can be adjusted to reduce flow rate.
The aerator is fitted between the hose and the showerhead. The design of the aerator nozzle allows air to mix with the water under pressure. When the water exits the nozzle the air expands, increasing the apparent water flow. Shower aerators can be integrated with a flow regulator as a pressure compensating aerator (PCA).
The design of the showerhead mixes air with the water under pressure. When the water exits the showerhead the air expands, increasing the apparent water flow.
Changes in water pressure or temperature cause the thermostat element to expand or contract.
This in turn moves the slide valve which alters the proportion of hot and cold water entering the TMV, thus maintaining the mixed water temperature.
• Retrofitavailable.• Cheapandeasytoinstall.
• Retrofitavailable.• Flowratereducedto
between 6 and 10 litres/minute.
• Retrofitavailable.• Flowratereducedto
between 6 and 10 litres/minute.
• Watertemperatureisset—uses less water at initial draw-off.
Typically 50%, but dependent on water pressure.
Typically 50%, but dependent on end flow rate.
Typically between 50% and 70%, but dependent on end flow rate.
Variable.
• Onlyapplicableifworkhoursare predictable.
• Requiresstaffreliability.
• Noteffectiveatpressurebelow 1bar (100kPa).
• Notsuitableforusewithelectrically heated showers.
• Lowflowmaynotprovideusersatisfaction—‘coldfeet’effect.
• Standardaeratorsdonotregulate pressure.
• ThereisariskofLegionellaif the shower is not operated regularly.
• Noteffectiveatpressurebelow 1bar (100kPa).
• Lowflowmaynotprovideusersatisfaction–‘coldfeet’effect.
• Generallynotsuitableforuse with electrically heated showers.
• Retrofitnotavailable.• Longerpaybackperiodsfor
more expensive valves (up to£200perunit).
I S O L A T I N G B A L L V A L V E
S H O W E R A E R A T O R
A E R A T I N G S H O W E R H E A D
T H E R M O S T A T I C M I X E R V A L V E ( T M V )
45 Working Together for a World Without Waste, Business Resource Efficiency Guide. Reducing Your Water Consumption. (http://www.wrap.org.uk/sites/files/wrap/WRAP_Reducing_Your_Water_Consumption_0.pdf)
40
WA
TE
R E
FF
ICIE
NC
Y A
PP
EN
DIX
Common Types of Device and Approach that are Available to Reduce Water Use through a Shower
I T E M WATER SAVINGS A D V A N T A G E S D I S A D V A N T A G E S
Avoids long periods of running water to get the desired temperature.
The regulator is fitted between the hose and the showerhead.
As electromagnetic valve works with a sensor device (infrared). When the sensor is activated the shower runs for a set period of time before shutting off.
• Useslesswateratinitialdraw-off.
• Retrofitavailable,easytofit.
• Regulatesflowregardlessof pressure.
• Flowratesofbetween6and 10 litres/minute can be achieved.
• Lowcost.
• Improvedhygiene—tapdoes not need to be touched.
• Canachieveflowratesofbetween 6 and 8 litres/minute.
Variable.
Typically 50%, but dependent on end flow rate.
• Upto70%,but dependent on the end flow rate and flow duration setting.
• Canachievetypical flow rates of between 6 and 8 litres/minute.
• Capitalcostsforinstallationof heater.
• Notsuitableforusewithelectrically heated showers.
• Requiresenergy—mainsorbattery operated.
• Ifsensorisfouledbysoap then waterflow is continuous.
• Coststypicallyaround£300/tap means longer payback period.
P O I N T - O F - S O U R C E H E A T E R
S H O W E R R E G U L A T O R S
E L E C T R O M A G N E T I C ( S E N S O R ) T A P S
T A B L E . 0 5 (continued)
Mechanical timed flow control. Usually works through controlled bleed from one side of a diaphragm to the other via a pinhole and it is the length of time that water is delivered through the showerhead.
• Automaticallyclosesafteruse.
• Flowratereducedtobetween 6 and 10 litres/minute.
• Cartridgemechanismuses a groove (rather than a pinhole) to pass the water from one side of the diaphragm to the other.
• Actuatingthevalvepushesa rubber washer down the length of the groove, cleaning away any scale deposits or other build-up as it moves.
Typically up to 50%, but dependent on end flow rate.
• Thedelaycycle(‘bleed’)needs to be correctly set.
• Ifthemechanismoperatesthrough the use of a pinhole in a diaphragm, the hole can become blocked by scale build-up.
P U S H - B U T T O N S H O W E R
DINAS PENGAWASANDAN PENERTIBAN BANGUNANPEMERINTAH PROVINSI DKI JAKARTA
Jalan Taman Jati Baru No. 1 Jakarta Barat t. (62-21) 856 342f. (62-21) 856 732
www.dppb.jakarta.go.id
Top Related