www.bauforumstahl.de
IPO Meeting Zürich 14 November 2014
Replacing S235 by S355
1. Start 2015: S355 is economic, sustainable and available.
I. Common pool of arguments, examples for economy and sustainability, design tools
II. Coordiantion with producers and stockholders about availability and additional
costs
III. Press informations, technical papers, webpages, newsletters by all IPOs,
producers, stockholders, fabricators etc.
2. Further Development.
Design tools, cost estimation, information for fabricators etc.
Repeat 1. and 2 with improved arguments and tool.
Ideas for next steps
At mid term S235 shall be replaced by S355 and higher grades.
Strategie for the comming years
- What are our arguments for whom
- What do we need to develop or improve
- Who needs to be involved
Idea for next steps
Savings and Potentials
compared to low grade steel S235 J2
Grade S355 J2 S460 M
Cost +5 % +10 %
Strength +50 % +100 %
Examples
Examples
0
2000
4000
6000
8000
10000
12000
14000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Knicklänge Lcr [m]
Tra
gfä
hig
ke
it N
b,R
d [
kN
]
S 355
S 235
S 420
S 460
S 690
QHP300x16
Typical range of
buckling length
for multy storey
buildings Lcr
Fd
Examples
Köln Fair: lattice girder
Upper chord
Box section with 2 UPE 400
and plates t=10-30 mm S355
Diagonales:
HEB 260, HEA 260 A, IPE 270 S235
Lower chord:
HD 260x114 and HD 260x142 S460
Examples
Carpark Airport Düsseldorf
Car park floor beam Variant 1 Variant 2
Grade S235JR S460M
Profil IPE 600 IPE 500
Weight 2.12 t (100%) 1.61 t (76%)
Cost 100% 83%
Tonnage of all beams 530 t 403 t
Beams per Truck 10 14
Required trucks 25 18
Savings through high strengtn steel ca. 180.000 €
Examples
World Financial Center Shanghai
Hight 492 m | 101 Storys
Dillinger Hütte: 23.000 t, incl. 7.700 t DI-MC 460
ArcelorMittal: 13.000 t, incl. 10.000 t Histar 460
Material saving: ca. 25 %
Cost saving : ca. 15 %
» Beispiel: Neubau des
Penny-Marktes in Werne
» Spannbetonbinder,
Holzleimbinder oder
Lochstegträger?
» Gesamtbilanz
Einsparung 14 .000 €
für Lochstegträger S355
(Außenwand, Innenwand
Glasfassade)
» Besonders effizient:
Hybridträger
Lochstegträger
Welche Stahlgüte ist für Verbundträger wirtschaftlich, S235, S355, S460?
Diplomarbeit Jacek Pilarski, FH Frankfurt
mittlere Kosten [€/m] für Verbundträger (C20 bzw. C40; b=3m; q=5kN/m²; g2=2kN/m²)
Kostenvergleich (C20/25; b=3m)
0
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
9.000
10.000
11.000
12.000
13.000
14.000
201918171615141312111098765
Spannweite [m]
Ko
ste
n [
€]
C20; S235; D22
C20; S355; D22
C20; S460; D22
Kostenvergleich (C40/50; b=3m)
0
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
9.000
10.000
11.000
12.000
13.000
201918171615141312111098765
Spannweite [m]
Ko
ste
n [
€]
C40; S235; D22
C40; S355; D22
C40; S460; D22
S460
Verbundträger
Belastung
1700 kg/m² Eigengewicht
1400 kg/m² Verkehrslast +
SLW60
Bsp. BoA Niederaußem,
Konstruktionen, Kosten, Bauhöhe, Diplomarbeit Jacek Pilarski, FH
Frankfurt
Stahlbeton C30/37 (ausgeführt)
Verbund C30/37, S235
HL-Verbund C50/60, S460
Stahlbeton Verbund
+0,5%HV-Verbund
-1,5 %
Stahlbeton
h=110 cm
Verbund
h=115 cm
HV-Verbund
h=90 cm
VerbundträgerHerstellungskosten | Bauhöhe
l=10m
Bsp. Mercedes Benz Plaza Moskau,Dachdecke über Show Room.
2 14 31516 14 13 12 11 10 9 8 7 6 5
Belastung
180 kg/m² Schnee
+ Schneekeil
VerbundträgerHerstellungskosten
Bsp. Mercedes Benz Plaza Moskau,
Konstruktion, Kosten. Diplomarbeit Jacek Pilarski, FH Frankfurt, jetzt HOCHTIEF
Verbund C30/37, S235 (ausgeführt)
HL-Verbund C50/60, S460
Stahlbeton
Verbund
-2,4%
8.2
7.3
6
7
8
9
1
VerbundHV-Verbund
-14 %
Stahlbeton
VerbundträgerHerstellungskosten
Top Related