INTRODUCTION TO ECC PT1
January 2016
Some History
ERC established ERC TG1 on UMTS/IMT-2000(the group has held 17 meetings)
1997
TG1 produced first ERC Decisions and developed responses to the first EC Mandates on UMTS
ECC PT1 developed major UMTS/IMT-2000 ECC deliverables implemented by most CEPT countries
ERC PT1 held its 1st meeting in Mainz, Germany
ECC PT1 has held over 50 meetings and continues addressing IMT and MFCN matters
2000 2015
ECC PT1 has been an active contributor to ITU-R (WP5D, JTG 4-5-6-7)
2
2
Mr. Pasi ToivonenFICORAERC TG1:August 1997 – October 2000
Mr. Didier ChauveauANFRECC PT1:October 2009 – present time
Mr. Peter ScheeleBNetzAECC PT1:October 2003 –October 2009
Mr. Jim ConnollyComRegERC/ECC PT1:October 2000 – October 2003
1997 2000 2015
ECC PT1 Chairmen
3
GSM, DECT IMT-2000/UMTS, IMT,
MFCN,Mobile on board Aircraft,
Mobile on board Vessels, M2M 700MHz
Contributions – Deliverables
ECC PT1
CEPTadministrations
Industry
Internationalorganisations
In an average meeting:• 78 participants with ~60
% representing industry• 50 input documents
20+ECC deliverables
10+CEPT Reports
4
2
Participants
5
Mai
nz #
1Pa
ris #
2Bu
dape
st #
3Br
ight
on #
4He
lsin
ki #
5Br
usse
ls #
6Li
sbon
#7
Berli
n #8
Gro
ning
en #
9Du
blin
#10
St. P
eter
sbur
g #1
1He
lsin
ki #
12
Cope
nhag
en #
13M
ainz
#14
Cam
brid
ge #
15Up
psal
a #1
6
Biel
/Bie
nne
#17
Mai
sons
-Alfo
rt #1
8He
lsin
ki #
19Vi
areg
gio
#20
Osl
o #2
1Vi
lniu
s #2
2
Mai
nz #
23 (X
O)
Mai
nz #
24Ta
vira
#25
Buda
pest
#26
Athe
ns #
27He
lsin
ki #
28Du
blin
#29
Paris
#30
Mai
nz #
31
Stoc
khol
m #
32Se
ville
#33
Soph
ia A
ntip
olis
#34
Cope
nhag
en #
35Ta
llinn
#36
Vien
na #
37
Biel
/Bie
nne
#38
Reyk
javi
k #3
9W
rocl
aw #
40
Kris
tians
and
#41
Mar
seill
e #4
2Be
rlin
#43
Ljub
ljana
#44
Rom
e #4
5
Luxe
mbo
urg
#46
Zagr
eb #
47
Edin
burg
h #4
8Vi
lniu
s #4
9M
ontre
ux #
50He
lsin
ki #
51
0
20
40
60
80
100
120
70
78
62
75 7479
68
80
53 54
68
79 80
67 6976
7974
8491
85
70
36
96 9487
70 7279
8275
8279
53
7770
7672
75
86
76
68
78
92
8186 87
9791
8791
Documents
6
Mai
nz #
1Pa
ris #
2Bu
dape
st #
3Br
ight
on #
4He
lsin
ki #
5Br
usse
ls #
6Li
sbon
#7
Berli
n #8
Gro
ning
en #
9Du
blin
#10
St. P
eter
sbur
g #1
1He
lsin
ki #
12
Cope
nhag
en #
13M
ainz
#14
Cam
brid
ge #
15Up
psal
a #1
6
Biel
/Bie
nne
#17
Mai
sons
-Alfo
rt #1
8He
lsin
ki #
19Vi
areg
gio
#20
Osl
o #2
1Vi
lniu
s #2
2
Mai
nz #
23 (X
O)
Mai
nz #
24Ta
vira
#25
Buda
pest
#26
Athe
ns #
27He
lsin
ki #
28Du
blin
#29
Paris
#30
Mai
nz #
31
Stoc
khol
m #
32Se
ville
#33
Soph
ia A
ntip
olis
#34
Cope
nhag
en #
35Ta
llinn
#36
Vien
na #
37
Biel
/Bie
nne
#38
Reyk
javi
k #3
9W
rocl
aw #
40
Kris
tians
and#
41M
arse
ille
#42
Berli
n #4
3Lj
ublja
na #
44Ro
me
#45
Luxe
mbo
urg
#46
Zagr
eb #
47
Edin
burg
h #4
8Vi
lniu
s #4
9M
ontre
ux #
50He
lsin
ki #
51
0
10
20
30
40
50
60
70
80
56
32 31
48
40
61
74
52
43
59
44
55
43 45 47
54
75
50
60 6259
3227
54 55
39
14
35
57
38
47
70
63 65
55 55 55
74
33
48 46
31
37
2833
45
3741
31 30 31
CEPT Members
7
Mai
nz #
1Pa
ris #
2Bu
dape
st #
3Br
ight
on #
4He
lsin
ki #
5Br
usse
ls #
6Li
sbon
#7
Berli
n #8
Gro
ning
en #
9Du
blin
#10
Pete
rsbu
rg #
11He
lsin
ki #
12
Cope
nhag
en #
13M
ainz
#14
Cam
brid
ge #
15Up
psal
a #1
6
Biel
/Bie
nne
#17
Mai
sons
-Alfo
rt #1
8He
lsin
ki #
19Vi
areg
gio
#20
Osl
o #2
1Vi
lniu
s #2
2
Mai
nz #
23 (X
O)
Mai
nz #
24Ta
vira
#25
Buda
pest
#26
Athe
ns #
27He
lsin
ki #
28Du
blin
#29
Paris
#30
Mai
nz #
31
Stoc
khol
m #
32Se
ville
#33
Soph
ia A
ntip
olis
#34
Cope
nhag
en #
35Ta
llinn
#36
Vien
na #
37
Biel
/Bie
nne
#38
Reyk
javi
k #3
9W
rocl
aw #
40
Kris
tians
and#
41M
arse
ille
#42
Berli
n #4
3Lj
ublja
na #
44Ro
me
#45
Luxe
mbo
urg
#46
Zagr
eb #
47
Edin
burg
h #4
8Vi
lniu
s #4
9M
ontre
ux #
50He
lsin
ki #
51
0
5
10
15
20
25
30
15 1514
1618
1716
18
1413 13
14 14 1415
1614
1517
1819
18
12
1920
2119
15
1918
1517
20
15
18 1817
2022 22
21 2122
2321
2426
25
2119
21
ECC PT1 Terms of Reference
The Project Team shall be responsible for implementing the WAPECS concept as appropriate in the context of MFCN and in frequency bands identified by ECC, including collaborating with WG FM on frequency management issues (e.g. cross-border coordination issues, sharing of bands with applications other than MFCN).
______________________________________________________________1 In recent ECC Decisions, spectrum has been designated to MFCN (mobile/fixed communications networks) which includes IMT and other communications networks in the mobile and fixed services" which would include fixed wireless access but not point-to-point links.
1
8
See full ECC PT1 Terms of Reference on the ECC PT1 webpage
ECC PT1 Officials
ChairmanMr. Didier Chauveau,ANFR, DPSAITel: +33 1 45 18 77 04E-mail: [email protected]
Vice-chairmanMr. Pasi ToivonenFICORATel: +358 9 6966 853E-mail:[email protected]
9
SecretaryMr. Antone Borissov,ANFRTel: +33 68 09 38 856E-mail:[email protected]
Vice-chairmanMr. Steve GreenOFCOMTel: +44 207 7834384E-mail: [email protected]
Place of ECC PT1 within ECC
ECC
WG FMFrequency
Management
WG SESpectrum
Engeneering
WG NaNNumbering and
Networks
CPGConference
Preparatory Group
ECO
ECC PT1IMT
Matters
Steering Group
ETSI
SRDoc
FM49, FM51, FM54,
FM55, EFIS/MG
SE7, SE40, STG
3GPP WiMAX Forum
GSMA
Industry
UMTS Forum
10
GTI
ECC PT1 co-operation with external entities
ECC PT1
ECCAPT Wireless Group
(AWG)
CITEL
11
European Commission
ECC PT1 input to the CEPT preparation to the WRCs (pre WRC -2015)
ECC PT1 has contributed to the preparation of the European Common Proposals (ECPs) for the World Radiocommunication Conferences (WRCs) on the following Agenda Items:
WRC-2000:• 1.6.1• 1.6.2
WRC-2003:• 1.22• 1.33 • 1.34
WRC-2007:• 1.4• 1.9
review of spectrum and regulatory issues for advanced mobile applications in the context of IMT‑2000, noting that there is an urgent need to provide more spectrum for the terrestrial component of such applications, and priority should be given to terrestrial mobile spectrum needs, and adjustments to the Table of Frequency Allocations as necessary
identification of a global radio control channel to facilitate multimode terminal operation and worldwide roaming of IMT‑2000to consider progress of ITU‑R studies concerning future development of IMT‑2000 and systems beyond IMT‑2000, in accordance with Resolution 228 (WRC‑2000)to review the results of studies in response to Resolution 539 (WRC‑2000) concerning threshold values for non‑GSO BSS (sound) in the band 2 630‑2 655 MHz, and to take actions as required
to review and revise technical, operational and regulatory provisions, including provisional limits in relation to the operation of high altitude platform stations within IMT‑2000 in the bands referred to in No. 5.388, in response to Resolution 221 (WRC‑2000)
to consider frequency-related matters for the future development of IMT‑2000 and systems beyond IMT‑2000 taking into account the results of ITU‑R studies in accordance with Resolution 228 (Rev.WRC‑03)
to review the technical, operational and regulatory provisions applicable to the use of the band 2 500-2 690 MHz by space services in order to facilitate sharing with current and future terrestrial services without placing undue constraint on the services to which the band is allocated
12
WRC-2015: AI 1.1 and AI 1.2
WRC-2015:• Support CPG_PTD on AI 1.1:to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International Mobile Telecommunications (IMT) and related regulatory provisions, to facilitate the development of terrestrial mobile broadband applications, in accordance with Resolution 233 (WRC 12); • Support CPG_PTD on AI 1.2to examine the results of ITU R studies, in accordance with Resolution 232 (WRC 12), on the use of the frequency band 694-790 MHz by the mobile, except aeronautical mobile, service in Region 1 and take the appropriate measures;
ECC PT1 is paving the way for the future of mobile
ECC PT1/CPG PTD meetings were co-located ensuring efficient organisation and cooperation for drafting CEPT position on AI 1.1 and AI 1.2 in synergy with harmonisation measures under development in ECC 13
ECC PT1 input to the WRC-2015
WRC-2015:• Support CPG_PTA on AI 4 and 10
to further develop the working document on “Proposed action on Resolutions relating to Mobile Service” and the ECP elements
When developing its response to CPG PTA, ECC PT1 addressed contributions from industry on future needs from mobile sectors on frequency ranges above 6 GHz, specific frequency bands to be considered for future IMT-systems , Initial characteristics of systems operating in the bands above 6 GHz, provide initial estimations for spectrum requirements for systems above 6 GHz
14
ECC PT1 is the CEPT entity contributing to ITU-R WP5D
15
Since the establishment of the ITU-R WP5D “IMT Systems” (successor of ITU-R WP8F) in January 2008, ECC PT1 has been contributing to its work by presenting the CEPT positions on the issues on the agenda of WP5D, including:
• Development and update of ITU-R Recommendations and Reports on IMT
• Digital Dividend (790-862 MHz for Region 1) • IMT-Advanced submission and evaluation process• Cognitive Radio Systems (CRS)• Femtocells (home base stations)• 3.5 GHz• 700 MHz • IMT 2020
ECC PT1 is brand recognised at the international level and in the industry
How is ECC PT1 organised?
Sub Working Groups (SWGs) are active during the ECC PT1 plenary meetings
Correspondence Groups (CGs) are active between ECC PT1 plenary meetings
Openingplenary
Closingplenary
Sub working group A
Sub working group C
Plenarymeeting
n
Plenarymeeting
n+1
Correspondence group X
Correspondence group Y
Correspondence group Z
The number of CGs may vary
16
Sub working group E
Presentation of ECC PT1 SWGs
SWG-A – “Spectrum Issues”Chairman: Mr. Michael Kraemer (E-Plus Mobilfunk GmbH)
michael.kraemer @ eplus-gruppe.de
SWG-C – “Compatibility and Sharing Issues”Chairman: Mr. Sverker Magnusson, (Ericsson)
sverker.magnusson @ ericsson.com
SWG-E – “Coordination of CEPT activities in relation to the ITU-R process for the development of IMT-2020”
Chairman: M. Eiman Mohyeldin, (Nokia) eiman.mohyeldin @ nokia.com
17
ECC PT1 current and recent activityThe following presents a list of current and recent activity within ECC PT1:
• ECC DEC (15)01 on 700 MHz MFCN • EC mandate 700 MHz: CEPT Report 53 (tasks 1&2) and current activity (draft CEPT
Report 60 - task 3) • Recommendations on MFCN cross border coordination
• ECC REC(15)01 : 700 MHz, 1452-1492 MHz, 3,4-3,8 GHz• Update of ERC REC(01)01: 1920-1980 MHz and 2110-2170 MHz’
• Update of ECC/DEC(05)05 to improve the harmonised band plan 2.6 GHz and to add relevant technical conditions (BEM)
• “Coverage obligations” : ECC Report 231• “Broadband Mobile Communication On-board Vessels ” : ECC Report 237, revision of
ECC DEC (08)08 • “Machine 2 Machine” 700 MHz 2 X 3 MHz : Draft ECC Report 242 on compatibility
studies with other possible applications in 700 MHz• Mobile Communications on board Aircraft (MCA) : Analysis of usage of MCA without
Network Control Unit and relevant follow up actions • Support to ECO on ECO Report 03: information on “licensing of mobile bands” now
available from EFIS • Possible contributions on IMT 2020 in ITU-R
18
Response to EC mandatesECC PT1 drafted CEPT Reports in response to EC mandates
(example of the last 3 years)
These CEPT reports are the basis either for the update of EC framework or the development of EC framework
MFCN 3.4-3.8 GHz: CEPT Report 049 • Harmonised band plan• New BEM suitable for MFCN with large bandwidthEC Decision 2014/276/EU
Mobile Communications onboard Aircraft (MCA): CEPT Report 048• MCA LTE1800 : 1710-1785 MHz and 1805-1880 MHz• MCA UMTS2100 (FDD): 1920-1980 MHz and 2110-2170 MHzEC Decision 2013/654/EU
MFCN 700 MHz: CEPT Report 53 and an additional draft CEPT Report 60 under development
• MFCN in 700 MHz : 2 X 30 MHz and “zero to 4 blocks of 5 MHz” SDL EC Decision expected in Q1 2016 19
IMT 2020
• ECC PT1 (SWG E) has started work on IMT 2020 to develop CEPT contributions to ITU-R WP 5D on the following topics:1. Technical requirements & Evaluations2. Process and circular letter
• Frequency bands for IMT 2020 will be considered for WRC-19 under Agenda Item 1.13 by ITU-R Task Group 5/1
• ECC PT1 has agreed on an Input to the February 2016 WP 5D meeting inviting WP 5D to send TG 5/1 stable technical and operational characteristics as early as possible, in order for the studies to progress
• ECC PT1 is awaiting guidance from ECC and CPG on how the CEPT work on AI 1.13 should be addressed
• Evaluation methods for IMT 2020 will be considered in more detail at the ECC PT1#52 meeting in April 2016
20
ECC PT1 webpage
The most recent information:http://www.cept.org/ecc/groups/ecc/ecc-pt1
21
For further information on ECC PT1
22
Please refer to the ECC PT1 contacts
Top Related