Introducing our Environmental Preservation System
your water. clean water.
1
o Crosswater Solutions manufactures a 4-part patent-pending Environmental Preservation System (EPS) that not only reduces storm water runoff, but can store it and even clean a variety of contaminants out of surface water runoff by using a bio-remediation agent.
o We have partnered with industry leaders AECOM, EnviroSales, & various aggregate companies across the nation to bring our EPS to market.
o Our full line of products and solutions include: • Manufacturing • Planning/Design • Project Management • Green Irrigation and Sewer System Relief • Clean Water Act Compliance (MS4) • Contracting • Installation • Construction Related Service
Our Company
2
• Craig Roeper - 45 years in specialty chemical packaging. 15 years as a private owner and president.
• Clark Hayes - 30 years of construction industry & education. 20 years as a CEO for various federal contracting.
• Robert (Tom) Thomas - 45 years in development (real estate/construction ), along with developing multiple companies.
• Stacy Tricker - 25 years in real estate sales and development .
• D. (Demetrius) Hammett - 20 years experience in senior management with Goodyear Tire & Rubber
• David Komocki – 45+ years in specialty chemical industry focusing on research and development. 20 years as owner of private firm.
Our Team
3
Water Runoff
Erosion
Contamination
MS4
The Global Challenge
4
Crosswater Solutions manufactures a 4-part patent-pending Environmental Preservation System (EPS) that not only reduces storm water runoff, but can store it and even clean a variety of contaminants
out of surface water runoff by using a bio-remediation agent that is LEED compliant with all EPA standards and ground water protocol.
Our Solution
5
Phase 1 Pervious Capstone Since the implementation of the Clean Water Act of 1992, there has not been one green solution to storm water control (MS4) until now. We use our patent-pending, superior permeable pavement to capture and provide entry to storage aggregate at a high rate. We use recycled rubber, recycled concrete and polymers to create the Capstone. Crosswater’s EPS is pending BMP validation by Ohio EPA as facilitated by Battelle Memorial Institute. BENEFITS • Controls surface water runoff • Supports substantial loads • Ideal for cold weather • Eliminates black/surface ice • Eliminates piping & retention basins • 50% less in cost than other systems - installation
similar to asphalt & concrete USES • Parking lots, walkways and bike paths • Tree surrounds • Farmland runoff & industrial containment runoff • Utility pads • River banks Capstone Components 6
Phase 2 Storage Aggregate We incorporate a very high-porosity patent-pending expanded ceramic shale to store and absorb water. Rotary kiln to pyro-process and expand clay, shale or slate BENEFITS • Absorbs up to 50 gallons of water per yd3 • Used in major construction sites • Inert to erosion and deterioration, extremely light-
weight • Supports patented worldwide bio-remediation
agent
USES • Geotechnical fill • Light-weight concrete • Structural and pre-cast concrete • Horticulture/landscaping • Bridge embankments and building materials
7
Phase 3 Bio-Remediation Our EPA-proven bio-remediation agent is tailored to site contamination and gets to work, cleaning or neutralizing most water polluting-contaminants. BENEFITS • Cleans and bio-remediates contaminated storm
water • Remains dormant until needed • Easily replenished through Capstone if needed • Exclusive to Crosswater Solutions USES • Wetlands and marsh cleanup • Industrial sites cleanup • Contaminated parking lot runoff • Users include: Walt Disney World, Cummins Engine,
EPA, Ford Motor Company, CSX Railways, FedEx, General Motors and more Components
8
Phase 3 Cont. Bio-Remediation HOW DOES IT WORK EXACTLY? Bioremediation is an advanced bio-technology for a clean environment. It allows natural processes to clean up harmful chemicals in the environment. Microscopic “bugs” that live in soil and groundwater like to eat certain harmful chemicals, such as those found in gasoline and oil spills. When this bio-remediation agent completely digests these chemicals, they change them into water and harmless gases such as carbon dioxide.
9
Phase 4 Monitoring and Maintenance After installation our 4-part patent-pending EPS system, Crosswater Solutions will provide continued oversight of the project to ensure its success. BENEFITS • Unparalleled cost benefit by using our system • Once completed, the system is sustainable • Our use of 100% recycled materials is green-
technology at it’s best • Meets and exceeds MS4 compliance • The only 100% recycled material and sustainable
solution on the market
10
Value Proposition and Cost/Benefit Analysis
11
Value Proposition • Crosswater Solutions’ 4-part patent-pending Environmental Preservation
System (EPS) does not compete with other surface systems or contaminant elimination systems; it simply performs where they don't.
• Our EPS meets several EPA expectations in one thorough system: o Pervious, Porosity, and Remediation for one price and one installation
• At an average cost of $18.00 per sq. ft., we have produced a green, sustainable
system that works versus the enormous cost for systems that have proven ineffective.
• Any other system will require multiple installations and higher costs due to major construction efforts. These systems will not meet the expectations of the law nor will they meet multiple standards of performance.
12
Cost/Benefit Analysis • Businesses, governmental agencies and foundations operate in accordance
with annual budgets and cost restrictions that impact their bottom line. Because of this, the cost benefit of using Crosswater Solutions’ EPS is achieved through the savings over the years due to the zero to minimal maintenance requirements.
• Once the EPS is installed, the cost for repair, upkeep, replenishment, and/or replacement is eliminated in most cases.
• In almost all scenarios where a comparative process is used, the top surface needs to be replaced every few years. Underground storage tanks and other ill-advised contaminant elimination systems including alternative sewer systems become cost prohibitive as well.
• As a result, the use of our EPS creates a cost benefit through savings of up to 10 times that of any alternative approach.
13
EPS Phase Details
14
Non-Proprietary Ingredients Used • Recycled rubber • Recycled concrete of generic
description and function of proprietary ingredients
• The entire topcoat is patent pending
Capstone Details/Data
Crosswater Capstone Environmental Impact Report • Capstone is environmentally-friendly once cured according to
EPA standards. • Resin we use in the process is non-flammable; however, it has
to have a SDS (safety data sheet) upon transport and during the work process.
15
Strength & Durability • Compression - 47,000 PSI, 2 inches thick • Tensile Strength – Consistent with ASTM
Standards • Traction – Performs better than asphalt
or concrete • Weight – 9# per square foot at 2# thick • Temperature – Burn rate is the same as
rubber. Non-flammable once cured. • Auto ignition is the same temperature as rubber. Greater than
asphalt (ASHCO test #666) • Freeze/Thaw – Pass 270 cycles and counting • Wear/Tear – Better than asphalt. Guarantee up to 15 years • Solar Degradation – Guaranteed up to 15 years in black. Other
color degradation rates will vary based on color chosen.
Capstone Details/Data Cont.
16
Strength & Durability Cont. • Solvent/Oil/Grease/Gasoline
Degradation – complete bio-remediation • Weathering – Guaranteed up to 15 years • Color Durability - Black up to 15 years.
Other colors will vary. • Additional measures comparable to
other competitive substitute paving surfaces – Capstone is equal to or better than any permeable surface.
Capstone Details/Data Cont.
17
Projected Useful Life of Top Layer • Up to 15 years. Eliminates “black ice” and
eliminates the need for complex drainage systems
Particle size range for each layer • Storage aggregate • Recycled rubber • Recycled concrete (Proprietary – Patent Pending) Erosion prevention characteristics • Non-erosion/Hard armor
Life Expectancy & Erosion Details/Data
18
Permeability of top layer per square foot • Greater than 1” per first flush =
(1 in. of rainfall per square ft. per hour) Permeability rates and absorption/saturation rates of storage aggregate layer for water equals 101 gallons of storage per ton for given unit of time • 5,700+ (inches per hour), relative to curve
Permeability Details/Data
19
Absorption/saturation rates of storage aggregate or other sublayers for phosphorus, nitrogen or other key contaminates of storm water than can be treated with absorbents per cubic yard or ton for given unit of time • 250% greater than limestone • Exceeds MS4 saturation Projected useful life of storage aggregate sublayer per each contaminant sought to be absorbed • Indefinite
Absorption Details/Data
20
Chemical Families that can be bio-remediated • All petroleum hydrocarbon solvents and byproducts, chlorides,
envirologics Comparative ability of sublayer of storage aggregate to support bio remediation agent • Unlimited
Comparative ability to deliver bio-remediation agent through top layer • Unlimited/same as water Projected useful life of entire system • Indefinite/self-sustaining
Bio-Remediation Details/Data
21
Maintenance requirements and comparative costs for competitive substitute systems; • No maintenance to storage aggregate. If Capstone is
overwhelmed, it simply needs to be vacuumed clean. Ability to recycle system components • All components are recyclable /non-hazardous.
Maintenance & Recycling
22
Comparative Analysis Capstone
• Meet the new 3rd surface • It doesn’t directly compete
with asphalt, it simply performs where asphalt does not.
• It is superior in functionality to any other pervious pavement.
• Freeze/Thaw – Pass 270 cycles and counting
• Burn rate is the same as rubber. Non-flammable once cured.
• Wear/Tear – Guaranteed up to 15 years
• Meets all EPA ground water protocols
Traditional Asphalt
• Not freeze tolerant • Labor intensive • Inefficient • Inferior
23
Roger Tory Peterson Institute of Natural History
Test Site • Located in Jamestown, New York
• RTPI installed Crosswater Solution’s EPS material around the Roger Tory Peterson Institute of Natural History’s parking lot.
• Our EPS material will capture contaminated storm water and direct it into the storage aggregate where it willl be bioremediated.
• This project will serve as a demonstration area for educating visitors about new conservation technologies.
24
Roger Tory Peterson Institute of Natural History
Goals • Provide bioremediation
from parking lot before entering natural wetland
• Provide educational area to demonstrate pervious pavement and bioremediation technologies
• Installation date will coincide with Crosswater Solutions Presentation and Workshop
25
26
Other Pervious Pavement Systems
Other Topcoats
• Inefficient
• Labor intensive
• Not freeze-tolerant
• Unable to be compared as it relates to cost benefit and functionality because asphalt is inferior
Impervious Pavers with Pervious Surrounds
Hand-Laid Pervious Pavers
Pervious Asphalt/Concrete
27
Other Pervious Pavement Systems
Other Storage Aggregates
• Labor intensive
• Not ideal for bio-remediation agent
28
Topcoat: Pervious material in direct contact with storm water providing an entry point into the storage aggregate Porous vs. Pervious: Typically used interchangeably; however, porosity refers to STORAGE and pervious refers to RATE of transmissivity First Flush: Amount of water leaving a surface after rainfall (1 inch per square foot per hour) Bioremediation: using naturally occurring microbes to consume undesired contaminants
Glossary of Terms
29
Top Related