Page 1 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
CONCRETE WORKSPlain Concrete
1 Plain Concrete 20Mpa-SRC Thick = 50mm m3 26.51 2 Plain Concrete 20Mpa-SRC Thick = 100mm m3 40.90 3 5% Micro Silica m3 - 4 Mass concrete > 100mm m3 50.60
Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)1 Isolated Footing m3 96.52 2 Strip Footing m3 76.72 3 Tie Beams / Grade Beams m3 126.01 4 Column Neck m3 8.51 5 Wall Neck m3
6 Slab On Grade m3 168.67 7 Vapour Barrier 300 micron Polyethylene under slab m2 804.09 8 Damp Proofing m2 2,403.46 9 5% Micro Silica m3
Super Structure Concrete Works - 30Mpa OPC1 Column / Beams / Walls m3 223.07 2 Column / Beams / Walls (with corbel) m3 17.57 3 Suspended Slab (Vary Thick) m3 118.66 4 Concrete Ramps, Step & Landing m3 - 5 Fairface Finish or Concrete ramps, steps & landing m2 - 6 Concrete Screed m3 6.73 7 Concrete Parapet m3 - 8 Concrete Coping Lm 1,399.22 9 Mechanical Pad m3
Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm1 Supply, Cut, Bend & Installation ton 132.33 2 Cut, Bend & Installation ton - 3 Installation only ton - 4 Supply, Cut & Bend only ton -
Page 2 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
Block Works1 200mm thick (CMU) non fire rated m2 - 2 150mm thick (CMU) non fire rated m2 - 3 100mm thick (CMU) non fire rated m2 391.27 4 Additional rate for fire rated solid block m2 - 5 Supply & Apply backing rod Lm -
Plaster Works1 Supply & Install of cement plaster (Internal) m2 - 2 Supply & Install of cement plaster (External) m2 - 3 Galvanized Steel Grooves in Plaster Lm -
Page 3 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
1 Perimeter Fence Type-2 Lm 169.33
1 B2602 - 4, 5 nos 2.00
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 4 of 52
Approved Quantity Remarks
Current To Date
- 26.51 - 40.90 - - - 50.60
- 96.52 - 76.72 - 126.01 - 8.51 - - - 168.67 - 804.09 - 2,403.46 - -
41.35 264.42 - 17.57 14.25 132.91 - - - - - 6.73 - - 44.20 1,443.42 - -
Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm 7.69 140.02 - - - - - -
Page 5 of 52
Approved Quantity Remarks
Current To Date
- - - - - 391.27 - - - -
- - - - - -
Page 6 of 52
Approved Quantity Remarks
Current To Date
- 169.33
- 2.00
(RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 7 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3 3.18
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3 15.86
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3 54.43
2 Strip Footing m3
3 Tie Beam/Grade Beam m3 66.57
4 Column Neck m3 5.36
5 Wall Neck m3
6 m3 107.00
7 Vapor barrier 300microns Polyehtylene sheet m2 279.03
8 Damp proofing m2 960.65
9 5% Micro silica m3
Slab on Grade 30MPa
Page 8 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3 36.69 2.01 8.19 8.19
2 Columns/Beams/Walls with corbel m3 17.57
3 Suspended slab m3 56.71
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3 6.73
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm 116.12 480.00 158.10 97.60 97.60
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton 42.76 3.65 1.87 2.91 2.91
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
Page 9 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
Page 10 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 11 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
1 B2602 - 4, 5 nos
Page 12 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
2007-3 2007-4 2008-1 2008-2 2100
1.67
11.47
38.69
44.03
3.15
41.03
241.69
691.45
Page 13 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
2007-3 2007-4 2008-1 2008-2 2100
8.19 8.19 7.35 7.35 12.02
47.51
97.60 97.60 97.60 97.60
2.91 2.91 2.76 2.76 29.80
Page 14 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 2007-3 2007-4 2008-1 2008-2 2100
Page 15 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
2007-3 2007-4 2008-1 2008-2 2100
Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 16 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
2007-3 2007-4 2008-1 2008-2 2100
Page 17 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
2602-4 2602-5 3202A-3 3202A-6 3202A-13
21.66
1.06
29.00
3.40
32.83
15.41
20.64
174.13
439.30
Page 18 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
2602-4 2602-5 3202A-3 3202A-6 3202A-13
0.40 0.40 26.09
19.73
(Monshri) 51.80 51.80
0.23 0.23 20.10
Page 19 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 2602-4 2602-5 3202A-3 3202A-6 3202A-13
Page 20 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
2602-4 2602-5 3202A-3 3202A-6 3202A-13
Page 21 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
2602-4 2602-5 3202A-3 3202A-6 3202A-13
1.00 1.00
Page 22 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
Lift Sta 3 Lift Sta 7
4.71 7.80
21.60
14.66 29.23
54.62 54.62
156.03 156.03
Fence Type-2
Page 23 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
Lift Sta 3 Lift Sta 7Fence Type-2
54.37 84.98
8.96
8.01 16.21
Page 24 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit Lift Sta 3 Lift Sta 7Fence Type-2
Page 25 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Lift Sta 3 Lift Sta 7Fence Type-2
160.75 230.52
169.33
Page 26 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
Lift Sta 3 Lift Sta 7Fence Type-2
Page 27 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
CONCRETE WORKSPlain Concrete
1 Plain Concrete 20Mpa-SRC Thick = 50mm m3 26.51 2 Plain Concrete 20Mpa-SRC Thick = 100mm m3 40.90 3 5% Micro Silica m3 - 4 Mass concrete > 100mm m3 50.60
Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)1 Isolated Footing m3 96.52 2 Strip Footing m3 76.72 3 Tie Beams / Grade Beams m3 126.01 4 Column Neck m3 8.51 5 Wall Neck m3
6 Slab On Grade m3 168.67 7 Vapour Barrier 300 micron Polyethylene under slab m2 804.09 8 Damp Proofing m2 2,403.46 9 5% Micro Silica m3
Super Structure Concrete Works - 30Mpa OPC1 Column / Beams / Walls m3 223.07 2 Column / Beams / Walls (with corbel) m3 17.57 3 Suspended Slab (Vary Thick) m3 118.66 4 Concrete Ramps, Step & Landing m3 - 5 Fairface Finish or Concrete ramps, steps & landing m2 - 6 Concrete Screed m3 6.73 7 Concrete Parapet m3 - 8 Concrete Coping Lm 1,399.22 9 Mechanical Pad m3
Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm1 Supply, Cut, Bend & Installation ton 132.33 2 Cut, Bend & Installation ton - 3 Installation only ton - 4 Supply, Cut & Bend only ton -
Page 28 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
Block Works1 200mm thick (CMU) non fire rated m2 - 2 150mm thick (CMU) non fire rated m2 - 3 100mm thick (CMU) non fire rated m2 391.27 4 Additional rate for fire rated solid block m2 - 5 Supply & Apply backing rod Lm -
Plaster Works1 Supply & Install of cement plaster (Internal) m2 - 2 Supply & Install of cement plaster (External) m2 - 3 Galvanized Steel Grooves in Plaster Lm -
Page 29 of 52
SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
Item No. Description UnitApproved Quantity
Previous
1 Perimeter Fence Type-2 Lm 169.33
1 B2602 - 4, 5 nos 2.00
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 30 of 52
Approved Quantity Remarks
Current To Date
- 26.51 - 40.90 - - - 50.60
- 96.52 - 76.72 - 126.01 - 8.51 - - - 168.67 - 804.09 - 2,403.46 - -
41.35 264.42 - 17.57 14.25 132.91 - - - - - 6.73 - - 44.20 1,443.42 - -
Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm 7.69 140.02 - - - - - -
Page 31 of 52
Approved Quantity Remarks
Current To Date
- - - - - 391.27 - - - -
- - - - - -
Page 32 of 52
Approved Quantity Remarks
Current To Date
- 169.33
- 2.00
(RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 33 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3 3.18
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3 15.86
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3 54.43
2 Strip Footing m3
3 Tie Beam/Grade Beam m3 66.57
4 Column Neck m3 5.36
5 Wall Neck m3
6 m3 107.00
7 Vapor barrier 300microns Polyehtylene sheet m2 279.03
8 Damp proofing m2 960.65
9 5% Micro silica m3
Slab on Grade 30MPa
Page 34 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3 36.69 2.01 8.19 8.19
2 Columns/Beams/Walls with corbel m3 17.57
3 Suspended slab m3 56.71
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3 6.73
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm 116.12 480.00 158.10 97.60 97.60
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton 42.76 3.65 1.87 2.91 2.91
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
Page 35 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
Page 36 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 37 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 903-1 1601-4 2006 2007-1 2007-2
1 B2602 - 4, 5 nos
Page 38 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
2007-3 2007-4 2008-1 2008-2 2100
1.67
11.47
38.69
44.03
3.15
41.03
241.69
691.45
Page 39 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
2007-3 2007-4 2008-1 2008-2 2100
8.19 8.19 7.35 7.35 12.02
47.51
97.60 97.60 97.60 97.60
2.91 2.91 2.76 2.76 29.80
Page 40 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 2007-3 2007-4 2008-1 2008-2 2100
Page 41 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
2007-3 2007-4 2008-1 2008-2 2100
Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Page 42 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
2007-3 2007-4 2008-1 2008-2 2100
Page 43 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
2602-4 2602-5 3202A-3 3202A-6 3202A-13
21.66
1.06
29.00
3.40
32.83
15.41
20.64
174.13
439.30
Page 44 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
2602-4 2602-5 3202A-3 3202A-6 3202A-13
0.40 0.40 26.09
19.73
(Nahdet) 51.80 51.80
0.23 0.23 20.10
Page 45 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit 2602-4 2602-5 3202A-3 3202A-6 3202A-13
Page 46 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
2602-4 2602-5 3202A-3 3202A-6 3202A-13
Page 47 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
2602-4 2602-5 3202A-3 3202A-6 3202A-13
1.00 1.00
Page 48 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
CONCRETE WORKS
1 Plain Concrete 20MPa Thk=50mm m3
2 Plain Concrete 20MPa Thk=100mm & > 100mm m3
3 5% Micro silica m3
4 Mass concrete > 100mm m3
SUB-STRUCTURE CONCRETE 30MPa
1 Isolated Footing m3
2 Strip Footing m3
3 Tie Beam/Grade Beam m3
4 Column Neck m3
5 Wall Neck m3
6 m3
7 Vapor barrier 300microns Polyehtylene sheet m2
8 Damp proofing m2
9 5% Micro silica m3
Slab on Grade 30MPa
Lift Sta 3 Lift Sta 7
4.71 7.80
21.60
14.66 29.23
54.62 54.62
156.03 156.03
Fence Type-2
Page 49 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
SUPER-STRUCTURE CONCRETE 30MPa
1 Columns/Beams/Walls without corbel m3
2 Columns/Beams/Walls with corbel m3
3 Suspended slab m3
4 Concrete ramps, steps, landing m3
5 Fair face concrete (ramp, steps, landing) m2
6 Concrete Screed m3
7 Concrete Parapet m3
8 Concrete Coping (incl galv acce) Lm
9 Mechanical pad m3
STEEL REINFORCEMENT
1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton
2 Install, Cut, Bend (dia 8,10,12,14,16) ton
3 Install ton
Lift Sta 3 Lift Sta 7Fence Type-2
54.37 84.98
8.96
8.01 16.21
Page 50 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit Lift Sta 3 Lift Sta 7Fence Type-2
Page 51 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
BLOCKWORKS
1 Thk=200mm, non-fire rated m2
2 Thk=150mm, non-fire rated m2
3 Thk=100mm, non-fire rated m2
4 Add'l rate for fire rated solid block m2
5 Backing rod (3cm thick) & fire rated sealant above Lm
PLASTERWORKS
1 Internal m2
2 External m2
3 Galvanized steel grooves in plaster Lm
1 Perimeter Fence Type-2 Lm
FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs
WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs
Lift Sta 3 Lift Sta 7Fence Type-2
160.75 230.52
169.33
Page 52 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT
Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016
SN Description Unit
1 B2602 - 4, 5 nos
Lift Sta 3 Lift Sta 7Fence Type-2
Top Related