Page 1: INTERCHANGE CONSTRUCTION PROJECTS · 2016-03-04 · Construct new location toll road; Scheduled completion: 2019 29 I-20/I-820/US 287 INTERCHANGE Reconstruct and widen existing interchange

2 0 1 6 D A L L A S ECONOMIC DEVELOPMENT G U I D E 1 8 7

AROUND THE REGION | 

MAJOR TRANSPORTATION CONSTRUCTION PROJECTS

8

5

2

7

6

2

3

49

34

14

15

19

20

21

22

23

25

44

43

16

28

32

33

12

1135

18

17

10

29 30

36

27

13

39

40

4241

2638

24

1

37

1 I-35E MANAGED LANES PHASE 2

Widen 6 to 8 gen. purpose lanes, 2 to 4 concurrent toll mgd lanes; Scheduled completion: 2024

2 SL 12/I-35EReconstruct and widen highway and add toll managed lanes; Scheduled completion: 2028

3 I-35EReconstruct and widen from 6 to 8 lanes; Scheduled completion: 2028

4 I-35E PEGASUS/ PART OF LOWER STEMMONS

Reconstruct highway and add toll managed lanes; Scheduled completion: 2025

5 I-30 PEGASUS/ THE CANYON

Reconstruct highway and add toll managed lanes; Scheduled completion: 2025

6 I-35E (LOWEST STEMMONS)

Construct 5 collector-distributor roads and reconstruct frontage roads; Scheduled completion: 2025

7 I-35E/US 67 (THE SOUTHERN GATEWAY)

Widen highway and add reversible toll managed lanes; Scheduled completion: 2025

8 I-35Reconstruct and widen highway; Scheduled completion: 2028

9 SH 183/SH114Build remaining portions of ultimate to include 6/8 highway highway lanes and 4/6 toll managed lanes; Scheduled completion: 2035

10 NTE SEGMENT 3A PHASE 2

Widen highway/add toll managed lane connections at downtown

11 NTE SEGMENT 2EBuild ultimate confi guration of phased toll managed lane project; Scheduled completion: 2025

12 DFW CONNECTORConstruct confi guration 3/ultimate project

13 I-30/US 80 (EAST CORRIDOR)

Reconstruct and widen highway and add toll managed lanes; Scheduled completion: 2028

14 I-30Reconstruct and add 2 additional lanes

15 I-30Expand to 6/8 lane highway and add interchange

16 I-35WReconstruct and widen highway and add toll managed lanes; Scheduled completion: 2028

17 I-35W SEGMENT 3C ULTIMATE

Reconstruct and widen highway and add toll managed lanes

18 I-35WAdd 4 additional lanes

19 US 175/SM WRIGHT PHASE II-A

Reconstruct highway to six-lane arterial; Scheduled completion: 2020

20 US 175/SM WRIGHT PHASE II-B

Reconstruct interchange and extend frontage roads; Scheduled completion: 2020

21 I-345 REHABILITATION (PHASE II)

Rehabilitation of existing overhead highway; Scheduled completion: 2017

22 JEFFERSON VIADUCTReconstruct existing viaduct in new location; Scheduled completion: 2023

23 I-635 LBJ FREEWAY EASTReconstruct and widen highway and add toll managed lanes; Scheduled completion: 2025

24 US 75Reconstruct and widen highway; corridor study started 2012; Scheduled completion: 2025

25 US 75Reconstruct and widen highway; Scheduled completion: 2028

26 LOOP 9Construct 6 lane toll road with 4/6 lane frontage roads; Scheduled completion: 2025

27 SH 190 (THE EAST BRANCH)

Construct new location toll road; Scheduled completion: 2022

28 TRINITY PARKWAY (NTTA)Construct new location toll road; Scheduled completion: 2019

29 I-20/I-820/US 287 INTERCHANGE

Reconstruct and widen existing interchange

30 I-20Add 4 lane tollconnection between SH 360 and SH 161

31 I-20Add 2 additional highway lanes

32 SH 170Build 6-lane highway in new location

33 I-820 SEG. 4Reconstruct and widen highway and add toll managed lanes

34 SH 360Add one mainlane each direction, ramp improvements

35 SH 199Expand to 6/8 lane highway and 3 interchanges

36 SH 121Reconstruct and widen 2 to 4 lanes with interchanges; Scheduled completion: 2018

37 SH 161Add toll managed lanes. Reconstruct northbound highway lanes; Scheduled completion: 2019

38 SH 360 SOUTHBuild ultimate confi guration, 6 to 8 lane divided toll road

39 I-30Reconstruct and widen 4 to 6 lanes; Scheduled completion: 2028

40 SH 205Widen 2 lane rural to 4 lane divided (Ultimate 6)

41 US 380/US 377Widen 4 to 6 lane divided urban w/interchange improvements; Scheduled completion: 2020

42 US 380Conduct Feasibility Study; Scheduled completion: 2016

43 SH 5Widen 2 lane rural highway to 4 lane urban (Ultimate 6); Scheduled completion: 2023

44 SH 5Widen 4 lane undivided to 4/6 lane divided; Scheduled completion: 2023

PLANNED HIGHWAY CONSTRUCTION PROJECTS

SOURCE: Texas Departmentof Transportation (TxDOT)

D A L L A S ECONOMIC DEVELOPMENT G U I D E 2 0 1 61 8 6

MAJORTRANSPORTATION CONSTRUCTIONPROJECTSTransportation is essential to Texas’ future. The movement of goods and people in an effi cient manner ensures that the economy remains competitive and economically prosperous. North Texas continues to experience tremendous population growth, and this places increased demand on the region’s transportation infrastructure. Billions of dollars are being invested to maintain existing infrastructure, prevent congestion, and ensure mobility and safety by relieving chokepoints and expanding critical corridors. Dozens of projects are currently under construction with many more planned for the future.

18

20

21

19

1

3

2

4

5

11

11

13

6

8

1

1617

9

7

14

12

10

15

HIGHWAY CONSTRUCTION PROJECTS

SOURCE: Texas Department of Transportation

1 I-35E MANAGED LANESPhase 2: Widen 6 to 8 gen. purpose lanes and 2 to 4 concurrent toll managed lanes; Scheduled completion: 2017

2 NTE SEG. 3AReconstruct highway and add toll managed lanes; reconstruct remainder of I-35W/I-820 interchange; Scheduled completion: 2018

3 NTE SEG. 3BReconstruct highway and add toll managed lanes; Scheduled completion: 2016

4 HORSESHOE Reconstruct I-35E and I-30 bridges over Trinity River; rebuild/widen existing highway; Scheduled completion: 2017

5,6 U.S. 75Reconstruct and widen to 8 lanes and 3 lane frontage roads; Scheduled completion: 2015

7 U.S. 75Reconstruct and widen to 8 lanes and 2 lane frontage roads; Scheduled completion: 2016

8 SH 121 SEG. 13 (DAL)Reconstruct and widen highway; Scheduled completion: 2017

9 I-30 Construct toll managed HOV lanes with wishbone ramps; Scheduled completion: 2016

10 US 67 CLEBURNE EAST LOOPWiden to 4 lane facility; Scheduled completion: 2016

11 MIDTOWN EXPRESSRebuild/widen highway and add toll managed lanes; Scheduled completion: 2018

12 SH 360 (NTTA/TXDOT)Phased 2 to 4 lane new toll road; Scheduled completion: 2017

13 DFW CONNECTOR (FM 2499)Build 2 main lanes below grade; Scheduled completion: 2017

14 I-35E(WAXAHACHIE PHASE I)Reconstruct and widen highway from 4 to 6 lanes; Scheduled completion: 2017

15 I-35E (WAXAHACHIE SOUTH)Build 10’ outside shldr./convert ex. 12’ outside shldr. to 3rd lane in each dir.; Scheduled completion: 2017

16 US 175 (SM WRIGHT FREEWAY)Extend to US 175 to I-45; Scheduled completion: 2018

17 SH 360/I-30 INTERCHANGEReconstruct and widen existing interchange; Scheduled completion: 2020

18 I-35E/US 67 (SOUTHERN GATEWAY)Widen highway and add reversible toll managed lanes; Scheduled completion: 2025

19 I-35W SEG. 3C “SKINNY”Reconstruct and widen highway and add toll managed lanes; Scheduled completion: 2018

20 US 75Reconstruct and widen highway; Scheduled completion: 2018

21 I-635 LBJ FREEWAY EASTReconstruct and widen highway and add toll mgd lanes; Scheduled completion: 2025

CDA/key projects awarded or under constructionPossible CDA in developmentKey projects in development

A comprehensive development agreement (CDA) is a tool TxDOT uses to enable private development by sharing the risks and responsibilities of design and construction.