Installation Guide for Drip Edge Fascia
4 COMMERCE WAY, ARDEN, NC 28704 USA800.892.9173 828.676.1700
OMGEDGESYSTEMS.COM
Drip Edge Fascia
Installation Guide forDrip Edge Fascia
A
B
F
G
E
C
D
12" OC
ROOF SIDE
E. 1-1/2" SS Ring Shank Nailat 12" o.c. (6" from ends) for cleat
at 12" o.c. (6" from ends) for cover (Included & Required)F. Membrane
(By Installer)
B. Concealed Joint Splice4" Lengths(Not required for polymer clad materials)
A. Formed Fascia Cover 10'-0" Lengths
C. Galvanized Anchor Cleat 10'-0" Lengths G. Strip-In Ply
(By Installer)D. Fascia Miter Cover (Outside Corner Shown)
GALV. ANCHORCLEAT
FASCIA
1" M
IN.
STRIP-IN ORCAP SHEET
1-1/2" SSRING SHANKNAILS
MEMBRANE
JOINT SPLICE
NOTES:#1 - Isolate all metal parts from ACQ treated wood or other galvanicallyincompatible material with appropriate membrane material.#2 - Appliance attachments, such as lightning rods, signs, or antennaethat penetrate the edge system, induce a galvanic reaction, or otherwisecompromise the effectiveness of the roof edge system, shall be eliminatedor isolated to prevent problems per ANSI/SPRI/FM4435/ES-1. Lightningprotection systems for example must not be directly affixed to the productprovided by OMG. Consult OMG for alternative attachment suggestions.
ANSI/SPRI/FM4435/ES-1 TESTED FM ApprovedInstallation Guide forDrip Edge Fascia
A
B
F
G
E
C
D
12" OC
ROOF SIDE
E. 1-1/2" SS Ring Shank Nailat 12" o.c. (6" from ends) for cleat
at 12" o.c. (6" from ends) for cover (Included & Required)F. Membrane
(By Installer)
B. Concealed Joint Splice4" Lengths(Not required for polymer clad materials)
A. Formed Fascia Cover 10'-0" Lengths
C. Galvanized Anchor Cleat 10'-0" Lengths G. Strip-In Ply
(By Installer)D. Fascia Miter Cover (Outside Corner Shown)
GALV. ANCHORCLEAT
FASCIA
1" M
IN.
STRIP-IN ORCAP SHEET
1-1/2" SSRING SHANKNAILS
MEMBRANE
JOINT SPLICE
NOTES:#1 - Isolate all metal parts from ACQ treated wood or other galvanicallyincompatible material with appropriate membrane material.#2 - Appliance attachments, such as lightning rods, signs, or antennaethat penetrate the edge system, induce a galvanic reaction, or otherwisecompromise the effectiveness of the roof edge system, shall be eliminatedor isolated to prevent problems per ANSI/SPRI/FM4435/ES-1. Lightningprotection systems for example must not be directly affixed to the productprovided by OMG. Consult OMG for alternative attachment suggestions.
ANSI/SPRI/FM4435/ES-1 TESTED FM Approved
Installation Guide forDrip Edge Fascia
A
B
F
G
E
C
D
12" OC
ROOF SIDE
E. 1-1/2" SS Ring Shank Nailat 12" o.c. (6" from ends) for cleat
at 12" o.c. (6" from ends) for cover (Included & Required)F. Membrane
(By Installer)
B. Concealed Joint Splice4" Lengths(Not required for polymer clad materials)
A. Formed Fascia Cover 10'-0" Lengths
C. Galvanized Anchor Cleat 10'-0" Lengths G. Strip-In Ply
(By Installer)D. Fascia Miter Cover (Outside Corner Shown)
GALV. ANCHORCLEAT
FASCIA
1" M
IN.
STRIP-IN ORCAP SHEET
1-1/2" SSRING SHANKNAILS
MEMBRANE
JOINT SPLICE
NOTES:#1 - Isolate all metal parts from ACQ treated wood or other galvanicallyincompatible material with appropriate membrane material.#2 - Appliance attachments, such as lightning rods, signs, or antennaethat penetrate the edge system, induce a galvanic reaction, or otherwisecompromise the effectiveness of the roof edge system, shall be eliminatedor isolated to prevent problems per ANSI/SPRI/FM4435/ES-1. Lightningprotection systems for example must not be directly affixed to the productprovided by OMG. Consult OMG for alternative attachment suggestions.
ANSI/SPRI/FM4435/ES-1 TESTED FM Approved
Installation Guide forDrip Edge Fascia
A
B
F
G
E
C
D
12" OC
ROOF SIDE
E. 1-1/2" SS Ring Shank Nailat 12" o.c. (6" from ends) for cleat
at 12" o.c. (6" from ends) for cover (Included & Required)F. Membrane
(By Installer)
B. Concealed Joint Splice4" Lengths(Not required for polymer clad materials)
A. Formed Fascia Cover 10'-0" Lengths
C. Galvanized Anchor Cleat 10'-0" Lengths G. Strip-In Ply
(By Installer)D. Fascia Miter Cover (Outside Corner Shown)
GALV. ANCHORCLEAT
FASCIA
1" M
IN.
STRIP-IN ORCAP SHEET
1-1/2" SSRING SHANKNAILS
MEMBRANE
JOINT SPLICE
NOTES:#1 - Isolate all metal parts from ACQ treated wood or other galvanicallyincompatible material with appropriate membrane material.#2 - Appliance attachments, such as lightning rods, signs, or antennaethat penetrate the edge system, induce a galvanic reaction, or otherwisecompromise the effectiveness of the roof edge system, shall be eliminatedor isolated to prevent problems per ANSI/SPRI/FM4435/ES-1. Lightningprotection systems for example must not be directly affixed to the productprovided by OMG. Consult OMG for alternative attachment suggestions.
ANSI/SPRI/FM4435/ES-1 TESTED FM Approved
FACEMIN=3-IN.
MAX=12-IN.
FASCIA CAP FORMED IN 10-FT. LENGTHS
CONCEALED SPLICE, 4-IN. WIDE (NOT REQUIRED FOR TPO COATED)
20GA. CLEAT FORMED IN 10-FT. LENGTHS
FLANGEMIN.=3-IN. MAX.=8-IN.
SEALANT BY OTHERS
MEMBRANE
BLOCKING BY OTHERS
1-1/2-IN. SS RING SHANK NAILS, PROVIDED @12-IN. O.C.
CONTACT OMG FOR APPROPRIATE RECOMMENDATIONS NEEDED TO MEET/EXCEED ANSI/SPRI/FM4435/ES-1 DESIGN CRITERIA
ANSI/SPRI/FM4435/ES-1 TEST PRESSURES UP TO 239 PSF (HORIZONTAL)
1-1/8-IN.
1-IN.
1/2-IN.
FOR MASONRY APPLICATIONS, PLEASE CONTACT OMG.
STEP 1: Installing Anchor CleatPlace the top lip of the continuous anchor cleat squarely on the topedge of the roofing membrane and treated wood nailing plate.Press cleats securely in position and nail through the pre-punchedholes with 1-1/2" ss ring shank nails provided. For miter application,fit into corner as required to maintain a continuous anchor cleat line.Then nail at a min. 6" in each direction from the corner or closer atspecial conditions. Maintain a 1/8" gap between adjacent cleatpieces.
STEP 3: Installing Fascia End Caps and End TermsInstall the fascia end caps and end terms by hooking the drip of thefascia onto the kick out of the cleat and rotate back onto the roof.Fasten with 1-1/2" ss ring shank nails provided in each pre-punchedhole.
STEP 4: Installing Fascia Straight Lengths(For Non Polymer Clad Material)
Place a concealed joint splice in the opposite end of the installedmiter or end cap. Install the fascia by hooking the drip of the fasciaonto the kick out of the cleat and rotate back onto the roof. Fastenwith 1-1/2" ss ring shank nails provided in each pre-punched hole.Allow 1/4" gap between fascia sections for thermalexpansion. Consider lengths of all straight pieces prior to cutting toavoid creating relatively short sections of fascia adjacent to fulllength sections. When complete, skip to step 6.Note: there should be a joint splice at every joint.
ENDCAP
WALLEND
JOINTSPLICE
ENDTERM
STEP 2: Installing Fascia MitersLocate the miters and concealed joint splices for the appropriatecorners. Place a concealed joint splice under each end of the mitersections. Install the miter by hooking the drip of the fascia miteronto the kick out of the cleat and rotate back onto the roof. Fastenwith 1-1/2" ss ring shank nails provided in each pre-punched hole.
OUTSIDE CORNER INSIDE CORNER
JOINTSPLICE
1/4" GAP
JOINTSPLICE
FASCIAMITER
FASCIASTRAIGHTLENGTH
1/4" GAP
ANCHORCLEAT
ROOF SIDE
ROOF SIDEROOFSIDE
ROOFSIDE
ROOF SIDE
OUTSIDE CORNER INSIDE CORNER
1/8" GAP
FOR POLYMER CLAD MATERIAL, GO TO STEP 5
FACEMIN=3-IN.
MAX=12-IN.
FASCIA CAP FORMED IN 10-FT. LENGTHS
CONCEALED SPLICE, 4-IN. WIDE (NOT REQUIRED FOR TPO COATED)
20GA. CLEAT FORMED IN 10-FT. LENGTHS
FLANGEMIN.=3-IN. MAX.=8-IN.
SEALANT BY OTHERS
MEMBRANE
BLOCKING BY OTHERS
1-1/2-IN. SS RING SHANK NAILS, PROVIDED @12-IN. O.C.
CONTACT OMG FOR APPROPRIATE RECOMMENDATIONS NEEDED TO MEET/EXCEED ANSI/SPRI/FM4435/ES-1 DESIGN CRITERIA
ANSI/SPRI/FM4435/ES-1 TEST PRESSURES UP TO 239 PSF (HORIZONTAL)
1-1/8-IN.
1-IN.
1/2-IN.
FOR MASONRY APPLICATIONS, PLEASE CONTACT OMG.
4 COMMERCE WAY, ARDEN, NC 28704 USA800.892.9173 828.676.1700 OMGEDGESYSTEMS.COMCopyright © 2020 OMG, Inc. All rights reserved. EM
1055
Re
v. 0
3162
020
Superior productivity. Superior performance.
STEP 5: Installing Fascia Straight Lengths(For Polymer Clad Material)
Field trim the back return of the drip on the fascia length 3" andoverlap the miters or adjacent section. Install the fascia by hookingthe drip of the fascia onto the kick out of the cleat and rotate backonto the roof. Fasten with 1-1/2" ss ring shank nails provided ineach pre-punched hole. Consider lengths of all straight pieces priorto cutting to avoid creating relatively short sections of fasciaadjacent to full length sections. Laps are to be a minimum of 3".
FASCIAMITER
FASCIASTRAIGHTLENGTH
ROOFSIDE
3" OVERLAP
STEP 6: Installing Approved Roofing MembraneInstall roofing membrane per manufacturer's instructions.
ROOFINGMEMBRANE
BASEPLY
ROOFSIDE