CLIENT
2013
Inspection Report271 Front St. Alert Bay, B.C.
Island Building Inspections
V A N C O U V E R I S L A N D B . C .
Commercial Inspection example, 2013 Page 2
Elevation Photos
For the Property at
271 Front Street
Alert Bay, BC
ELEVATION PICTURES
Front West Elevation
Commercial Inspection example, 2013 Page 3
South Elevation
Commercial Inspection example, 2013 Page 4
Rear East Elevation
Commercial Inspection example, 2013 Page 5
North Elevation
Commercial Inspection example, 2013 Page 6
THE BOTTOM LINEThe building requires new roofs as soon as possible, as roofs were leaking at the time of inspection.
The building gutters and downspouts will require replacement to protect the building envelop.
The rear man door should be repaired as the building is not secure (south end of east side).
The electrical deficiencies should be corrected as soon as possible.
ROOFING
SLOPED ROOFING/ASHPHALT
Condition: Leaking
The roofing materials should be replaced as soon as possible. The shed roof covering east side of building is leaking
severely. The roofs over man doors are leaking. Main roof shingles are past service life. The main gable roof is a 4-
12 pitch 82 feet long and 22 feet up on each side. The shed style roof is a 3-12 pitch 82 feet long and 16 feet wide. The two small gable roofs over doors were approx. 20sp.ft.
• Implications: Chance of water damage to contents, finishes and or structure.
• Location: East
• Task: Replace
• Time: Immediate
• Cost: Major
SLOPED ROOF FLASHINGS/Roof/sidewall flashings
Condition: Leaking
Where roofs connect walls over man doors and along east side (shed roof) flashings require replacement.
Implications: Chance of water damage to contents, finishes and/or structure
• Location: Various
• Task: Repair
• Time: Immediate
• Cost: Major
Commercial Inspection example, 2013 Page 7
EXTERIOR
Roof Drainage/Gutters
Condition: Discharging onto the roof.
Gutters on main structure discharging onto shed roof. This has caused this roof to fail
• Implications: Material deterioration
• Location: East
• Task: Repair
• Time: Immediate
• Cost: Major
Exterior Glass/Exterior Trim
Condition: Paint or stain needed
The wood frames and sills around windows require attention as paint has failed and woods is starting to rot.
• Implication: Chance of water damage to contents, finishes and /or structure/Material deterioration
• Location: Throughout
• Task: Repair or replace
• Time: Less than 3 years
Commercial Inspection example, 2013 Page 8
ELECTRICAL
SERVICE ENTERANCE
Condition: No drip loop
Service entrance attached on the north east corner does not have a drip loop.
• Implication: Electrical shock, fire.
• Location: Main distribution box.
• Task: Correct
• Time: Immediate
DISTRIBUTION SYSTEM/Wiring-damaged or exposed
Condition: Exposed on walls or ceilings
There was unprotected wire through-out building poor connections and exposed wire in outlet boxes and switches.
• Implications: Electric shock
• Location: Various
• Task: Correct
• Time: Immediate
INTERIOR
Doors/Doors and frames
Condition: Damaged
The man door on east side south end was kicked in breaking the door jamb. Requires immediate repair as cannot secure building.
• Implications: Building open to weather, animals, unauthorized personnel.
• Location: Southeast
• Task: Correct
• Time: Immediate
• Cost: Minor
Commercial Inspection example, 2013 Page 9
ROOFINGDESCRIPTION
Sloped roofing material: Asphalt shingles
Probability of leakage:
The roofs over man doors and shed roof on back of building a were leaking at time of inspection
LIMITATIONS:
Roof inspection limited/prevented by: Lack of access (too slippers/fragile)
Inspection preformed: By walking on roof
RECOMMENDATIONS:
SLOPED ROOFING /Asphalt
Condition: Leaking
The roofing materials should be replaced as soon as possible. The shed roof covering east side of building is leaking
severely. The roofs over man doors are leaking. Main roof shingles are past service life. The main gable roof is a 4-
12 pitch 82 feet long and 22 feet up on each side. The shed style roof is a 3-12 itch 82 feet long and 16 feet wide. The two small gable roofs over doors were approx. 20sq.ft.
• Implication: Chance of water damage to contents, finished and /or structure.
• Location: East
• Task: Replace
• Time: Immediate
• Cost: Major
1. Door roofs 2. Damaged shingles
Commercial Inspection example, 2013 Page 10
3.Water draining across shed roof
SLOPED ROOF FLASHINGS/Roof/sidewall flashings
Conditions: Leaking
Where roofs connect to walls over man doors and along east side flashings require replacement.
• Implications: Chance of water damage to contents, finishes and/or structure.
• Location: Various
• Task: Repair
• Time: Immediate
• Cost: Major
Commercial Inspection example, 2013 Page 11
EXTERIORDESCRIPTION
General:
At the rear of the building there were 8 - 45gallon drums – filled with “purged water” as per label dated 2009. The
barrels appear to be rusting and tilting - removal is recommended. There was also a piece of sheet metal sticking out of the ground – it was imbedded in the ground. It is a tripping hazard, it is pointed and its edges are sharp.
4. Drums at rear 5. Metal imbedded in ground
• Gutter & Downspout Material: Aluminum
• Gutter & Downspout Type: Eave mounted
• Gutter & Downspout discharge: Below grade and above grade
• Lot slope: Flat
• Wall surfaces: Stucco, Fiber cement shingles
• Driveway: Gravel
• Walkway: Concrete – covered with moss – condition was difficult to determine appeared serviceable.
LIMITATIONS:
Upper floors inspected from: Ground level
Commercial Inspection example, 2013 Page 12
RECOMMENDATIONS:
ROOF DRAINAGE/Gutters
• Condition: The gutters on the east side of the building are clogged, damaged and draining onto the roof.
Gutters on west side (front elevation) - MISSING
• Implications: Chance of water damage to contents, finishes and /or structure
6. Gutters damaged
Condition: Discharging onto roof
Gutter on main structure discharging onto shed roof. This has caused this roof to fail
• Implication: Material deterioration
• Location: East
• Task: Repair
• Time: Immediate
• Cost: Major
Commercial Inspection example, 2013 Page 13
7. Gutter discharging onto shed roof
• Condition: Discharging onto roof
• Implications: Material deterioration
• Locations: East
• Task: Further evaluation Remodel
• Time: Immediate
8. Clogged gutters – vegetation growing in gutters
WALLS / Soffits and fascia
Condition: Damage
There are numerous holes in exterior that require repair.
• Implications: The damaged building envelop leads to water damage and /or structure damage.
• Location: Various Exterior Wall
Commercial Inspection example, 2013 Page 14
• Task: Repair
9. Damaged wall northwest corner
Condition: Paint or stain needed
Implications: Cosmetic defects / Chance of water damage to contents, finishes, and /or structure/
shortened life expectancy of material
• Location: Throughout
• Task: Improve
• Time: Less than 2 years
EXTERIOR GLASS / Glass (glazing) Condition: Broken
There were six broken windows on the west side of building, the windows and the door on the south side
were boarded up and on the east side two windows boarded up.
• Implication: Change of water entering building/ Chance of pests entering building/ Increased
heating and cooling costs
• Location: Various
• Task: Repair
• Time: Immediate
EXTERIOR GLASS/ Exterior trim Condition: Paint or stain needed
The wood frames and sills around window require attention as paint has failed and wood is starting to rot
• Implication: Chance of water damage to contents, finishes and /or structure/ Material
deterioration
Commercial Inspection example, 2013 Page 15
• Location: Throughout
• Task: Repair or replace
• Time: Less than 2 years
10.Window sill deteriorating – boarded up window
LANDSCAPING/ Lot grading
Condition: Various locations around building the grad is too high which will result in rot. There are fish nets on east wall that have vegetation growing from the netting.
• Location: Various
• Task: Correct
• Time: Less than 1 year.
11.Grade too high
Commercial Inspection example, 2013 Page 16
STRUCTUREDESCRIPTION
There is a steel inner frame (80 feetx46 feet) with supports the framed roof structure. Outside the steel frame 2x6
walls frame rises to the bottom of the wood rafters. There was an addition running along the length of the east side, which was 80 feet by 14 feet.
The building is fundamentally sound, although there have been repairs to the rear wall base of the studs and the sil plates as the result of water damage.
• Configuration: Slab on grade
• Foundation material: Poured concrete
• Exterior wall Construction: wood frame steel frame
• Roof and ceiling framing: Rafters/roof joists, Steel framing, Skip sheathing
LIMITATIONS:
Unable to inspect 28 feet from the north east corner of the addition (interior) as it was locked off.
Commercial Inspection example, 2013 Page 17
ELECTRICALDESCRIPTION:
Service entrance cable and location: Overhead copper
Service size: 100 Amps (240Volts)
Main disconnect/service box rating: 100 Amps
System grounding material and type: Copper – water pipe & ground rod
Distribution panel type and location: Breakers – first floor
Auxiliary panel (subpanel - type and location: There was a second meter on the north east side of the building. Suspect that there is distribution system in locked of section.
Circuit interrupters: Ground Fault (GFCI) & Arc Falut (AFCI): None
Smoke detectors: None noted
LIMITATIONS:
There was no access to the panel were the service entered on the north east corner
RECOMMENDATIONS:
SERVICE DROP AND SERVICE ENTRANCE/ Service drop
• Condition: The service entrance on north east side does not have drip loop
• Implications: water may drain into main service box
• Location: Northeast
• Task: Correct
• Time: Immediate
Commercial Inspection example, 2013 Page 18
12. No drip loop
DISTRIBUTION SYSTEM/Wiring – damaged or exposed
Condition: Exposed on walls or ceilings
There was unprotected wire throughout building poor connections and exposed wired in outlet boxes and switches.
• Implications: Electric shock
• Location: Various
• Task: Correct
• Time: Immediate
13. wire exposed poor connection at box 14. Exposed wires at ceiling outlet
Commercial Inspection example, 2013 Page 19
DISTRIBUTION SYSTEM / Cover plates
Condition: Missing
Cover plates missing various locations
• Implications: Electric Shock
• Location: Various
• Task: Correct
• Time: Immediate
15. No cover plate - typical
Commercial Inspection example, 2013 Page 20
HEATINGDESCRIPTION:
General: There was no heat supply in the structure
INSULATION AND VENTILATIONDESCRIPTION
General: Only area with insulation was walls in small room on south west corner
Attic/roof ventilation: None found
Commercial Inspection example, 2013 Page 21
PLUMBING DESCRIPTION
General: The bath room was not service able requires complete new bathroom toilet sink and hot water tank.
Water supply source: Public
Service piping into building: Plastic
Supply piping in building: Plastic, Galvanized steel, Polybutylene (PB)
LIMITATIONS:
Inspection limited/prevented by Water supply turned off
RECOMMENDATIONS:
General
The water was not on at time of inspection. Bathroom was non-functional. Toilet and sink seemed operational.
Commercial Inspection example, 2013 Page 22
INTERIORDESCRIPTION
Major floor finishes: Concrete
Concrete floor in generally good condition
16. Main room floor
The floor in the addition had trenches in the concrete which were covered with wood.
Major wall and ceiling finishes: Walls and ceiling require replacement
17. Wall damage 18. Wall and ceiling damage
Commercial Inspection example, 2013 Page 23
Windows: Casement
The windows are non-functional and 5 boarded-up, approximately 6 window panes were broken and covered with plywood.
Glazing: Single
Doors:
Exterior doors – type/material:
• Hinged
• Wood
• Garage door – wood
• Garage door – metal
• Metal garage door on north side damaged
19. North elevation garage doors 20. Metal door damage north elevation
RECOMMENDATIONS
DOORS/ Doors and frames
Condition: Damage
The man door on east side south end was kicked in breaking the door jamb. Requires immediate repair as cannot secure building
• Implications: Building open to weather, animals and unauthorized personnel.
• Location: Southeast
• Task: Correct
Commercial Inspection example, 2013 Page 24
• Time: Immediate
• Cost: Minor
21. Damaged door frame east side south end.
END OF REPORT
For information on correcting deficiencies please see maintenance portion of