Webinar on

Innovations in PQ interventions

21st May 2015

Amit Raje

Managing Director,

Aartech Solonics Limited

Page 2: Innovations in PQ

• Put your logo

here

PQ in India – An Overview

2

Ref: http://eoimages.gsfc.nasa.gov/images/imagerecords/55000/55167/earth_lights.jpg

Page 3: Innovations in PQ

• Put your logo

here

Discussion Points

3

• Key PQ Real Time Issues for Industries /

High End Consumers

• Some Innovations in PQ in India including

Real Life Examples and Case Studies

Page 4: Innovations in PQ

• Put your logo

here

Connecting the Dots…

• Does this look familiar…

– Process Trips / Downtimes ?

– Equipment Damage – Out of Spec Use ?

– Safety Violating Incidents / Accidents ?

– Unanticipated Bills to Pay ?

– Unproductive Efficiency Building / Cost Cutting

Measures ?

4

Page 5: Innovations in PQ

• Put your logo

here

5

PQ Real Time Issues for Industries /

High End Consumers • Process Continuity

– Seamless Transfer to Online Standby Source

– Reliability of Backups

– Uninterrupted Power Systems

– ‘Spurious Trips’

• Safety / Operational Flexibility

– Short Circuit Levels

• Tariff / Regulatory Compliance

– Dynamic Reactive Power Compensation

– Harmonic Filtering

Page 6: Innovations in PQ

• Put your logo

here

Process Continuity –

Fast Bus Transfer Systems Power Generation / Continuous Process Industries

BTS 2000 Fast Bus Transfer Systems - Aartech

30+ Years of Rich Experience, R&D

400+ Bus Transfer Systems executed all over India.

Total Installation Impact > 50000 MW

6

BTS

M

M

GT

GENERATOR

GTB EHV BUS STB

ST

ST I/C

UNIT

BOARD

TIE-1 TIE-2

(NC)

UAT

UAT I/C

STATION

BOARD

Fig. 1. Thermal power plant: Main-Tie BTS configuration.

Page 7: Innovations in PQ

• Put your logo

here

7

Spin down characteristics of an open circuit motor bus

MOTOR BUS

VOLTAGE PHASOR

(VBUS)

NORMAL SOURCE

VOLTAGE PHASOR

(VNORMAL)

VOLTAGE COLLAPSE

AND PHASE DECAY

CHARACTERISTICS

OF THE MOTOR BUS

Page 8: Innovations in PQ

• Put your logo

here

Reliable Engine Starting Railways, Defense, Heavy Earth Moving Equipment, Marine, DG Sets, Fire

Pumping Engines, Fleet Applications

8

Page 9: Innovations in PQ

• Put your logo

here

9

Page 10: Innovations in PQ

• Put your logo

here

10

Page 11: Innovations in PQ

• Put your logo

here

Uninterrupted Power Data Centers, Textile, CNC Machining, Fire Protection,

• PureWave™ Offline Medium Voltage

UPS Solutions for Whole Facility

Protection from M/s S&C Electric, USA

– Data Centres

– Mission Critical Applications

• FaraDigm® Short Duration UPS

– Discrete DC/AC UPS solutions for 5-30

second backup before Safe Shut Down /

Ride-through for Power Quality Events such

as Voltage Sags / Changeovers

11

Page 12: Innovations in PQ

• Put your logo

here

Fault Current Limiting Power T&D, Cement, WHR Generation, Wind

• CLiP® Current Limiting

Protectors

Fault Current Limiters –

M/s G&W Electric Co. USA

12

Page 13: Innovations in PQ

• Put your logo

here

Dynamic Reactive Power Management PureWave® DSTATCOM

– S&C Electric Co. USA

13

Source DSTATCOM

L

+

+

-

-

Vs Vdstat

I

+

-

Inverter sizes +1 to +32 MVAR in 1-

MVAR increments

Shunt capacitors or reactors can shift

the range

2-4 millisecond response time

Short-term overload of 330% for 2

seconds

• Mining Operation – 17 x 75-250 HP Motors

=> 8-12% Voltage Flicker

+/- 2MVAR DSTATCOM + 2MVAR Cap Bank

• Wood Processing – 3 x 400 HP Motors

=> 6% Voltage Flicker

+/- 2MVAR DSTATCOM

Page 14: Innovations in PQ

• Put your logo

here

14

+52

+16

0

-16

DSTATCOM Output (MVAR)

Switched Cap Banks

+60

+40

+20

0

Cap Bank 1

Cap Bank 3

Total Continuous Output +112

+40

0

-16

Cap Bank 2

Output Comparison SVC vs DSTATCOM with

330% Short-Term Overload

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3

Voltage (p.u.)

MV

AR

DSTATCOM

SVC

Page 15: Innovations in PQ

• Put your logo

here

Case Study..

• FaraDigm® Short Duration UPS –

– Textile OEM supplies Regular Battery Based Online UPS

along with Equipment

– End User has to invest in Battery Replacement every 2-3

years, approx. Rs 60-70k / UPS

– Actual Need is for 15-30 seconds (and not 15-30

minutes) as Safe Shutdown / Diesel Gen Sets are

available as backup – Scope for Innovation !!

– Short Duration Battery Less UPS offers 10 Year Lifetime,

with 3 Year ROI, Compact, Low Footprint, Weight,

Portability, WYSIWYG Solution.

15

Page 16: Innovations in PQ

• Put your logo

here

Case Study…

• BTS 2000 Fast Bus Transfer System

– Helps avoid Power Cuts, Loss of Revenue,

Process Downtime, Material Wastage,

Equipment Stress, Personnel Anxieties and

Safety Hazards…

– Potentially Single Operation ROI !

16

Page 17: Innovations in PQ

• Put your logo

here

ESMI Initiative (Prayas, Pune)

• Finalist at Google Impact Challenge, 2013

• www.watchyourpower.org

17

Page 18: Innovations in PQ

• Put your logo

here

Thanks !