IMT-2020 PROCESSES
TSDSI-TEPC Workshop IMT-2020 Technologies12.02.2020
Advisor, TSDSI
Background ITU-R Study Group 5 Structure
WP 5D is responsible for the overall radio system aspects of the terrestrial component of International Mobile Telecommunications (IMT) systems, comprising the current
IMT-2000, IMT-Advanced and IMT-2020.
SWG Evaluation
SWG IMT Specs.
SWG Coordination
TECHNOLOGY ASPECTSGENERAL ASPECTS SPECTRUM ASPECTS
Chair: WANG Hu
WGs
Yoshio HONDA Ying PENG Y ISHIKAWA
IMT-2020 DevelopmentKey documents
» Recommendation ITU-R M.2083 - Framework and overall objectives of the future development of IMT for 2020 and beyond (September 2015)
» Report ITU-R M.2410 - Key requirements related to the minimum technical performance of IMT-2020 candidate radio interface technologies
» Report ITU-R M.2411 - Requirements, evaluation criteria and submission templates for the development of Recommendations and Reports on IMT-2020, such as the detailed specifications of IMT 2020. It provides the service, spectrum and technical performance requirements for candidate Radio Interface Technologies (RITs)/Set of Radio Interface Technologies (SRITs) for IMT 2020.
» Report ITU-R M.2412 - This Report provides guidelines for the procedure, the methodology and the criteria (technical, spectrum and service) to be used in evaluating the candidate IMT-2020 radio interface technologies (RITs) or Set of RITs (SRITs) for a number of test environments
Detailed schedule Evaluation Steps
STEP 3: WP5D#33 over for TSDSI, Nufront, ETSI DECT on Dec 13, 2019
STEP 3: WP5D#32 deadline July 2019
STEP 4: WP5D#31 Oct 2018 Evaluation starts
STEP 4: WP5D#34 Feb 2020 Evaluation over
Current RITs situation post WP5D#33STEP 3 - RIT Submissions & Acknowledgements to Proponents
RIT Name Document Approved in Mtg.#
3GPP 5D/TEMP/792 # 32/JUL 2019China 5D/TEMP/791 # 32/JUL 2019Korea) 5D/TEMP/795 # 32/JUL 2019ETSI (TC DECT) and DECT Forum 5D/TEMP/1299 # 33/DEC 2019Nufront 5D/TEMP/1300 # 33/DEC 2019TSDSI 5D/TEMP/1301 # 33/DEC 2019
A Total of 6 RITs have completed Submission Process
IEGs Evaluation IntentionsINDEPENDENT EVALUATION GROUPS (IEGS)
3GPPCHINA KOREA TSDSI ETSI (TC DECT)
DECT FORUM NufrontRIT SRIT
IMT-2020/14 IMT-2020/13 IMT-2020/15 IMT-2020/16 IMT-2020/19 IMT-2020/17 IMT-2020/18
5GIA* ✔ ✔ ✔ ✔ATIS WTSC ✔ ✔ Partial PartialChEG ✔ ✔ ✔ ✔CEG Canada ✔ ✔ Partial Partial PartialTCoE India ✔ ✔5GMF Japan ✔ ✔WWRF ✔ ✔ Partial PartialTTA Korea ✔ ✔TPEG Taiwan ✔ ✔ETSI ✔ ✔ ✔5GIF India ✔ Partial ✔ ✔ PartialAEG Africa Partial Partial Partial Partial
* 5G INFRASTRUCTURE ACCESS
Next WP5D steps (4-5-6-7)
EVALUATION
#28 #29 #30 #31 #31bis
#32 #33 #34
SUBM
ISSI
ON
STA
RTS
SUBM
ISSI
ON
DEA
DLIN
E
GAP
S IN
TSD
SI, N
UFR
ON
T, D
ECT
Extn to TSDSI, Nufront, DECT
BY 10 Sep
STEP
3) C
OM
PLET
E
INTERIM
EVLUATIO
N RESU
LTS
IFINAL EVLU
ATION
RESULTS
JUL 19 DEC 19 FEB 20
Consensus on results
#35
DECI
SIO
N P
OIN
T
SUBMISSION
JUN 20
[3][4] [7]
REVIEW, COORDINATION EXTERNAL EVALUATION, COMPLIANCE WITH MINIMUM REQUIREMENTS[5] [6]
OCT 17
Jan
18
Jun
18
Oct
18
Feb
19
Consensus building is performed during Steps 4, 5, 6 and 7 with the objective of achieving global harmonization and having the potential for wide industry support for the radio interfaces that are developed for IMT-2020. This may include grouping of RITs or modifications to RITs to create SRITs that better meet the objectives of IMT-2020
Way forward during Step 4 – 7