Download - Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Transcript
Page 1: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Implementation of best practices to

reduce NRW in the Bahamas

Sofia KanellopoulouNRW Specialist

Page 2: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

The Bahamas

• 700 islands and over 2,000 rocks and cays

• Population 380,000• Capital: Nassau, New

Providence

Page 3: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

NASSAU, NEW PROVIDENCE

▪ Population: approx. 280,000 (70%)

▪ Area: 207 km2 (34 km x 11 km)

▪ Highest Elevation: 98 feet, approx. 30 m

▪ Water Supply Network: 1300 km

▪ Active Customers: 45,000

Page 4: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Water Supply Situation in New Providence (The Bahamas) up to 2012:

▪ Over 90% of the water came from desalination plants

▪ NRW 58% (31,000 m3/day)

▪ Average water price: $2.7 per m3 compared to $0.3 per m3 in the U.S)

▪ For almost three decades Water & Sewerage Corporation (WSC) was coping with increasing levels of water losses.

▪ WSC realized that a long term comprehensive approach should be taken.

Page 5: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Project Overview

10 years Performance Based Project (2012-2021):

holistic approach (design, implementation, and maintenance)

to deliver the results and to ensure maintaining the efficiency of the water network for the long term.

Project size: USD83 Million (USD51M financed by the IDB)

Page 6: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

TARGETS:

▪ To Reduce NRW to 2.5 MIGD (11,360 m3/day) by end of year 5 & To Increase average system pressure to 25 psi (1.72 bar)

▪ To Reduce NRW to 2.0 MIGD (9,090 m3/day) by end of year 7

▪ To Maintain NRW at 2 MIGD (9,090 m3/day) until the end of the project

Page 7: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Strategy and action plan with respect to:

Project outline Baseline Survey

Data gathering, economical analysis, testing and surveys

Water Balance & NRW reduction Strategy Plan

Leak detection and

repair

DMA & Pressure

Management

Infrastructure replacement

Commercial losses (Illegal connections,

Meters)

NRW management

software (NETBASE)

Page 8: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Baseline Survey

▪ 2011 NRW 29,990 m3/day:

– Significantly higher than the RFP (22,720 m3/day) - 2009

– average system pressure also higher – 24.6 psi (1.70 bar)

– N1 (pressure/leakage exponent) – 0.9

▪ 2013 NRW 31,220 m3/day (2012 water balance data)

– average system pressure also higher–25.1 psi (1.73 bar)

– N1 (pressure/leakage exponent) – 0.9

Page 9: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Components of NRW Reduction Strategy (1)

▪ Introduction of improved materials for service connections and leak repairs

▪ Selective service line replacement – 15,000 services

▪ Disconnection of inactive services ~10,000

▪ Selective mains replacement – 25,000 feet (WSC)

▪ Large revenue meter right sizing, replacement

Page 10: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Components of NRW Reduction Strategy (2)

▪ Advanced pressure management

– Control from critical point

– I2O controllers

▪ Replacement of all PRVs and bulk meters

▪ District metering (DMAs)

▪ Control of zone boundaries

▪ Netbase advanced network management

▪ Leak detection and repairs (2 surveys a year)

Page 11: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Components of NRW Reduction Strategy (3)

▪ Clean, exercise system valves

▪ GSM data loggers

▪ Hydraulic modelling

▪ System optimization

▪ SCADA

▪ GIS data improvement

▪ Allocate customers to DMAs

▪ Water efficiency education – schools program

▪ Customer win-back program

Page 12: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

SCADA Implementation

▪ Installed at each WSC plant

▪ Control of Pumps

▪ Monitor pumps, flows, levels, pressures, power

▪ SCADA servers installed in WSC Control Room and in Miya project office (read only)

Page 13: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Netbase – Distribution Management System

✓ Network Information

✓ Configuration Tool

✓ LATIS

✓ Sumdat

✓ Leakage and Water Balance

✓ Campaigns

✓ Events

✓ Levels of Service Pressure

✓ Hydraulic Modeling

✓ Area Performance

✓ Asset Performance

SAP-EAM (Work Order Data)

CSIS (Customer Complaints

GIS (Asset / Maps)

SAP (Billing)

CORPORATE

DATA SOURCE

DMA

BAs/ HAs Gauging Points

TIME SERIES

DATA

DATA WAREHOUSE

NETBASE Spatial Database (Loading,

Updating, Integration)

NETBASEAPPLICATIONS

•Near real-time monitoring of water resources and decision support toolto manage the network resources

•Data mining for leak detection and sensors for precise leak localization

Page 14: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

NRW reduction plan

6,876,42

5,97

4,87

3,77

2,5 2,5

2 2 2

0,45

1,55

2,65

3,653,92 3,92

4,42 4,42 4,42 4,42

25,1

21

22

2525

18

19

20

21

22

23

24

25

26

0

1

2

3

4

5

6

7

8

2013 2014 2015 2016 2017 2018 2019 2020 2021

NRW (Migd) NRW saving acumolative Average Annual Pressure (psi)

Page 15: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

WORKS

Page 16: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Technical Works (2013-2017)

Activities Number of works

Replaced active service connections 17,077

Disconnections of inactive service connections

5,724

Leak repairs on mains 866

Total leaks repaired (ALC) 4,976

Pipes replaced by WSC due to heavy leakage (out of 52,000 ft proposed)

approx. 34,000 ft

Page 17: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Pressure Zones/DMAs (2013-2016)

Activities Number

Pressure Zones 36

• PRVs 33

• Gravity Supplied 1

• Supplied directly by PS 2

DMAs 89

Page 18: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Pressure Zones

Page 19: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Separation into DMAs

Page 20: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Replacement of Large Customers meters(Bulk meters 2” up to 6”)

▪ Replaced 47 old bulk meters with

ARAD ultrasonic meters (OCTAVE)

▪ High precision meter (according to MID R500, Q3/Q1=500)

▪ Body from stainless steel 316

▪ Check valve installed

Page 21: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Intensive Leakage Detection

Causes of Leaks:

▪ Inappropriate materials

Page 22: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

▪ Bad installation (no specifications

followed, pipes very shallow, no

suitable bedding/backfilling materials)

▪ Lack of proactive

maintenance

Page 23: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day
Page 24: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day
Page 25: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Leak Detection (1)

▪ 14 local staff recruited and trained by IWA Water Loss leak detection expert

▪ Team led by experienced local

leakage inspector (14+1)

▪ Work prioritized based on DMAs with highest leakage

▪ Illegal connections, stuck meters, missing meters, disconnected

services etc.

Page 26: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Leak Detection (2)

▪ Difficulties in finding leaks due to

– Low pressure

– Plastic materials

– Heavy traffic (noise)

– Electric interference

▪ Methodology

– Sounding of meters

– Sounding of pipes and pinpointing the leaks

– Step testing to detect the areas of high leakage

– Gas detection (used) & tethered technology (investigator)

– 2 equivalent surveys of New Providence annually

Page 27: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Results&

Conclusions (2018)

Page 28: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

P.Fanner, 2018

Page 29: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Project is Delivering!

KPI 2013 2017

NRW m3/day 31,354 11,680

NRW % 57.8 26.3ILI - 27.5 8.1

NRW l/conn/day 670 236Real Losses I/conn/day 628 173Apparent Losses I/conn/day 42 63

Average Pressure bar 1.73 1.65P.Fanner, 2018

Page 30: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Project is Delivering!

▪ Exceeding initial performance targets

▪ Recovered from dangerous situation due to intermittent supply operation – 2013

– Pressure management savings reduced

▪ WSC pleased with progress

– Now have few breaks to repair!

– Remote control of pressures

– Improved customer service

– Improved infrastructure

– WSC now using the improved materials

– SCADA / Netbase

Page 31: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day

Any Questions?

Many thanks for your [email protected]