Top Related
Claudio Bortolin – CERN. Y. Lesenechal started some tests last week (drill, twisted wire and a lot of patience): Ø ~ 1,2 mm Twisted wire + carbide drill.
Full Scale Thermosiphon Risk Assessment Lukasz Zwalinski PH/DT/PO - Cooling.
02.06.2014Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
nico bortolin · studio 1 project 1 - Intention house vi - Peter Eisenman Assignment: Each student was asked to form groups of 2 and study a particular precedent house to gain knowledge
IBL CO 2 cooling control system development status 19.03.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Petrozuata Bortolin Multifase Bombeo
M. Gomez Marzoa1 WG4 Meeting - 12th December 2012 Update on stave thermal testing Claudio BORTOLIN Enrico DA RIVA Corrado GARGIULO Manuel GOMEZ MARZOA.
MARCO UNICOS based control system CERN 10.09.2012 Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.