HVAC SYSTEMS COMMISSIONING REPORT
PAGE
1 General Comments
Equipment List
INTERNATIONAL CERTIFICATION BOARD / TESTING, ADJUSTING & BALANCING BUREAU
CERTIFYING STAMP
2
3
4
5
PAGE
PAGE
Control Systems ChecklistsPAGE
Manufactures Checklists and Start-Up Reports
PAGE
Start-Up Checklists
Arizona System Analysis Professionals, LLC
Arizona System Analysis Professionals, LLC
INDEX
PROJECT: Sample Project
GENERAL COMMENTS
SMACNAHVAC SYSTEMS COMMISSIONING REPORT
1. The following items were incomplete or unresolved at the time of preparation of this report
A HOA for the boilers needs to be installed B DDC lighting controls not complete C Fire alarm shutdown not verified
1 of 81
PROJECT: Sample Project
UNIT NO. LOCATION AREA SERVEDEQUIPMENT NAME
SMACNAHVAC SYSTEMS COMMISSIONING REPORT
EQUIPMENT LIST
2 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - All Dampers Open
MECHANICAL SERVICE CONNECTIONS - Coil piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up by Manufacturers RepresentativeMech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 101-AIR HANDLING SYSTEM-LIQUID HEAT/COOL
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
3 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Gas Equipment & Venting Completed
MECHANICAL SERVICE CONNECTIONS - Gas piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Gas Train Controls Operational
START-UP INSPECTIONStart-up by Qualified Personnel (Gas Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFiring Sequence VerifiedFlame Safeguard Sequence VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 102 - AIR HANDLING SYSTEM - GAS HEAT
WRITE_COMMENTS_HERE
4 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Refrigeration Section Completed - Balance Dampers Open
MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Water piping & valves installed & tested - Condensate drains clear & complete - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Intergral Controls Operational
START-UP INSPECTIONStart-up by Qualified Personnel (Ref. Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 103 - AIR CONDITIONING or HEAT PUMP SYSTEM - WATER
ITEM COMMENT
WRITE_COMMENTS_HERE
5 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Refrigeration Section Completed
MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Condensate drains clear - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Integral Controls Operational
START-UP INSPECTIONStart-up by Qualified Personnel (Ref. Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 104 - PACKAGED AIR CONDITIONING SYSTEM
WRITE_COMMENTS_HERE
6 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums, Ducts, & Coils Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - Gas Equipment & Venting Complete - Refrigeration Section Completed
MECHANICAL SERVICE CONNECTIONS - Refrigerant piping & valves installed & tested - Gas piping & valves installed & tested - Condensate drains clear & complete - Duct System Complete - Areas Clean - Misc. Components Complete (i.e., Humidifier)
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Safety Controls Operational - Control System Operational (or DDC Program) - Ready to Start & Run Under Control - Refrigeration & Gas System Controls OperationalSTART-UP INSPECTIONStart-up by Qualified Personnel (Ref. & Gas Cert.)Mech., Elect. & Controls Contractors PresentFan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCooling Stages & Temperature Controls VerifiedFiring Sequence & Flame Safety SequencesIntegral & Safety Controls VerifiedFreeze Protection OperationalMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 105 - PACKAGED AIR CONDITIONING SYSTEM - GAS HEAT
ITEM COMMENT
WRITE_COMMENTS_HERE
7 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely - All Manual Dampers Open
MECHANICAL SERVICE CONNECTIONS - Duct System Complete - Areas Clean - Backdraft Dampers Free To Operate
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Ready to Start & Run Under Control
START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 106 - EXHAUST SYSTEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
8 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Fire Dampers Tested - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely
MECHANICAL SERVICE CONNECTIONS - Duct System Complete - (Areas Clean) - Return & Exhaust Dampers Operational
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Supply Fan Interlocks Operational - Ready to Start & Run Under Control
START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedSupply Fan Interlock VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 107 - RETURN AIR SYSTEM
WRITE_COMMENTS_HERE
9 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Filters, Components - Plenums & Ducts Clean and Clear - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely
MECHANICAL SERVICE CONNECTIONS - Duct System Complete - (Areas Clean) - Outdoor Air Dampers Operational
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Fire System Interlocks Operational - Ready to Start & Run Under Control
START-UP INSPECTIONElectrical Contractor PresentFan Rotation Correct (Bump)Electrical Interlocks VerifiedFire System Interlocks VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Local Air Leakage AcceptableVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 108 - PRESSURIZATION FAN SYSTEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
10 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Gas Train - Breeching & Combustion Air - Boiler Inspection & Chemical Treatment
MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Gas Piping & Valves Installed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up By Manufacturer's RepresentativeMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedPump & Flow Interlocks VerifiedSafety Controls & Flame Safeguards VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedLow Water Cutout VerifiedSafety Relief Valve TestedWater Temperature MaintainedCombustion Efficiency & Capacity TestVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 109 - HOT WATER BOILER SYSTEM - GAS
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
WRITE_COMMENTS_HERE
11 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Oil System - Breeching & Combustion Air - Boiler Inspection & Chemical Treatment
MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Oil Piping & Valves Installed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up By Manufacturer's RepresentativeMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedPump & Flow Interlocks VerifiedSafety Controls & Flame Safeguards VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedLow Water Cutout VerifiedSafety Relief Valve TestedWater Temperature MaintainedCombustion Efficiency & Capacity TestVibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 110 - HOT WATER BOILER SYSTEM - OIL
WRITE_COMMENTS_HERE
12 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Preheating & Lubrication - Control Panel - Refrigerant Charge
MECHANICAL SERVICE CONNECTIONS - Condenser & Chilled Water Piping & Valves - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up By Manufacturer's RepresentativeCertificate / Log ProvidedMech., Elect. & Controls Contractors PresentPump & Flow Interlocks VerifiedSafety Controls VerifiedPressure & Temperature Gauges CheckedWater Temperature MaintainedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 111 - CHILLER SYSTEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
NOTE: This checklist is suitable to prepare most typesof chillers for start-up. Start-up Technician should followmanufacturer's equipment specific checklist and submitcopy for report.
13 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Belt Tension, Lubrication - Fan(s) Rotates Freely
MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up - Water Treatment System Installed
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Control Interlocks Operational - Ready to Start & Run Under Control
START-UP INSPECTIONMech., Elect. & Controls Contractors PresentPump & Fan Rotation Correct (Bump)Electrical & Control Interlocks VerifiedLevel Control Tested & AdjustedCapacity Controls VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 112 - COOLING TOWER SYSTEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
14 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely
MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up - Strainer(s) Clean
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Control Interlocks Operational - Ready to Start & Run Under Control
START-UP INSPECTIONMech., Elect. & Controls Contractors PresentPump Rotation Correct (Bump)Electrical & Control Interlocks VerifiedCheck Valve TestedSystem Pressure AcceptableMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 113 - CIRCULATING PUMP SYSTEM
WRITE_COMMENTS_HERE
15 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Gas Train - Breeching & Combustion Air
MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Recirculation Pump Operational - Gas Piping & Valves Installed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up by Qualified Personnel (Gas Cert.)Mech., Elect. & Controls Contractors PresentFiring Sequences VerifiedSafety Controls & Flame Safeguards VerifiedSafety Relief Valve TestedTemperature Gauges CheckedWater Temperature MaintainedWater Recirculation VerifiedCombustion Efficiency & Capacity Test
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 114 - DOMESTIC WATER HEATING SYSTEM - GAS
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
16 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Burner & Oil System - Breeching & Combustion Air
MECHANICAL SERVICE CONNECTIONS - Water Piping & Valves Installed & Tested - Recirculation Pump Operational - Oil Piping & Valves Installed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational (or DDC Program) - Integral Controls Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up by Qualified PersonnelMech., Elect. & Controls Contractors PresentFiring Sequences VerifiedSafety Controls & Flame Safeguards VerifiedSafety Relief Valve TestedTemperature Gauges CheckedWater Temperature MaintainedWater Recirculation VerifiedCombustion Efficiency & Capacity Test
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 115 - DOMESTIC WATER HEATING SYSTEM - OIL
WRITE_COMMENTS_HERE
17 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely - Control Panel
MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational - Ready to Start & Run Under Control
START-UP INSPECTIONMech. & Elect. Contractors PresentPump Rotation Correct (Bump)Float Switches VerifiedLevel Alarms TestedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
ITEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENT
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 116 - SUMP PUMP SYSTEM
WRITE_COMMENTS_HERE
18 of 81
PROJECT: Sample Project UNIT NO:LOCATION: SERVICE:MANUFACTURE: MODEL:
OKPRE-START-UP INSPECTIONPHYSICAL INSTALLATION COMPLETE - Mounting, Isolators, Components - Alignment, Lubrication - Pump(s) Rotates Freely - Control Panel
MECHANICAL SERVICE CONNECTIONS - Piping & Valves Completed & Tested - Valves Positioned For Start-up
ELECTRICAL SERVICE CONNECTIONS - Electrical Connections Completed - Disconnect Switch Installed - Overload Heaters in Place (Sized Correctly)
CONTROL SYSTEMS COMPLETE - Control System Operational - Ready to Start & Run Under Control
START-UP INSPECTIONStart-up by Manufacturer's RepresentativeMech. & Elect. Contractors PresentPump Rotation Correct (Bump)Electrical Interlocks VerifiedCheck Valve TestedStart/Stop Operation VerifiedMotor Amps - Rated _____ Actual _____Motor Volts - Rated _____ Actual _____Vibration & Noise Level Acceptable
PRE START BY: DATE:START-UP BY: DATE:
EQUIPMENT PRE-START & START-UP CHECKLISTSMS 117 - FIRE PUMP SYSTEM
SMACNA
GENERAL COMMENTS:
HVAC SYSTEMS COMMISSIONING - LEVEL 1
COMMENTITEM
WRITE_COMMENTS_HERE
19 of 81