CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
CASE STUDY OFCASE STUDY OF
HOTEL ISTA, AMRITSARHOTEL ISTA, AMRITSAR
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
LOCATIONLOCATIONHOTEL IS NOW KNOWN AS HYATT HOTEL, AMRITSAR.
THE HOTEL IS LOCATED ON THE MAIN G.T. ROAD IN THE OUTSKIRTS OF THE CITY. WITH THE NEW ELEVATED ROAD COMING UP IN CLOSE PROXIMITY OF THE SITE, ONE CAN REACH TO THE MAIN PUBLIC CENTRES OF THE CITY VERY CONVENIENTLY.
DISTANCES FROM THE HOTEL•AIRPORT 14 KMS..•RAILWAY STATION 6 KMS. •THE GOLDEN TEMPLE 5 KMS..•JALLIANWALA BAGH 5 KMS.
NORTH
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
3
SITE NO. USE NET AREA
(in acres)
MAX. GROUND COVERAGE
FAR HEIGHT
C 3 Hotel 4.00 40% 3.5 22 Storeys
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
4
SITE ZONINGSITE ZONING
TOTAL SITE AREA=10117.14 sq.mt.
TOTAL GROUND COVERAGE =2892.72sq.mt.
GR.COVERAGE (in %) = 28%
NORTH
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
ZONING-GROUND FLOORZONING-GROUND FLOORH
OT
EL
EN
TR
AN
CE
TO BASEMENT PARKING
MAINENTRANCE PORCH
BANQUET ENTRANCE
LOADING/UNLOADING AREA
BACK OF THE HOUSE
BACK OF THE HOUSE
NORTH
ADMNISITATIVE AREA
BANQUET HALLOUTDOOR AREA
RESTAURANT
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
AREA STATEMENT:
•Entrance foyer and lobby = 217.7sq.mt.• Waiting area = 17.2 sq.mt.• Travel desk = 11.2 sq.mt.• Reception = 24.3 sq.mt.• Restaurant = 305.3 sq.mt.• Banquet = 356.4 sq.mt.• Bar lounge = 122.9 sq.mt.• Water body = 163.0 sq.mt.• Restaurant kitchen = 196.8 sq.mt.• Bakery = 65.4 sq.mt.• Banquet pantry = 129.1 sq.mt.• Garbage room = 15.24 sq.mt.• Sale/purchase office = 64.9 sq.mt.• Loading/unloading area = 34.2 sq.mt.•TOTAL AREA
= 1723.64 sq.mt.
RECEPTION AND SITTING IN ENTRANCE LOBBY
•Business area =65.6sq.mt.
INDIAN AND CONTINENTAL RESTAURANT
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
7
GROUND FLOOR PLANGROUND FLOOR PLAN
SERVICE CORRIDOR
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
GROUND FLOORGROUND FLOOR
A MASS PROJECTS OUT OF THE PLAIN
FAÇADE TO FORM THE ENTRANCE PORCH
WHICH AUTOMATICALLY ATTRACTS THE
GUESTS.
KEY PLAN
To banquet hall To restaurant
Entrance Lobby
Water Body
A WIDE ENTRANCE LOBBY WELCOMES THE GUESTS AND THE SCULPTURE POOL ENTERTAINS THE GUEST WITH THE PLAY OF
WATER AND FIRE
Bar Lounge
Mee
ting
Roo
ms
Main Entrance
Reception
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
GROUND FLOORGROUND FLOOR
To banquet hall To restaurant
Entrance Lobby
Water Body
Bar Lounge
Mee
ting
Roo
ms
Main Entrance
Guest Elevators
Reception
•THE GUEST ELEVATORS ARE CLEARLY VISIBLE FROM THE RECEPTION AND WAITING AREA THUS PROVIDING EASE OF MOVEMENT TO THE VISITOR.
•THE MAIN ENTRANCE CONSISTS OF TWO PARTS: •THE GUEST ENTRY AND •LUGGAGE ENTRY. •WHILE THE GUEST GOES TO THE ENTRANCE LOBBY, THE LUGGAGE GOES FROM THE LUGGAGE DOCK TO THE SERVICE LIFTS FROM WHERE IT IS SENT TO THE ROOMS.
Luggage Dock
Service Lifts
THE BAR OFFERS PROVIDES THE VIEWS OF OPEN COURTYARD AND RIPPLING WATER BODIES. THE AREA OF BAR IS 122 SQ.MT AND IT HAS THE CAPACITY OF 40 PERSONS
THE RECEPTION AREA HAS A LARGE RECEPTION DESK
WITH MANAGER’S OFFICE AT THE BACK.
ON THE LEFT OF RECEPTION IS THE TRAVEL DESK AND
WAITING AREA.
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
GROUND FLOORGROUND FLOOR
KEY PLAN
Banquet Hall
Reception
Banquet Entrance
Publ
ic T
oile
ts
Banquet Kitchen
Banquet Hall
AREA BANQUET HALL -356 SQ. MT.356 SQ. MT. IT HAS FACILITY TO CONVERT ONE HALL INTO TWO. AROUND 250 PERSONS CAN ATTEND AN EVENT AT A TIME. THE HALL HAS ITS SEPARATE KITCHEN AND IT IS SERVED THROUGH A 1800MM WIDE SERVICE CORRIDOR.SINCE THE BANQUET HALL HA A SEPARATE ENTRANCE, THEREFORE IT DOESN’T CREATES A RUSH IN THE ENTRANCE LOBBY AND ENSURES A QUITE AND EFFICIENT BUSINESS ENVIRONMENT
SERVICE CORRIDOR
THE PUBLIC TOILETS ARE QUITE FAR FROM THE WAITING AREA,
AND THE PERSON HAS TO CROSS THE BANQUET AREA TO
USE THEM.
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
GROUND FLOORGROUND FLOOR
KEY PLANIndian/Continental
Restaurant
Outdoor Sitting
Outdoor Sitting
Restaurant Entrance
Mee
ting
Roo
ms
Kitchen
Bakery
RESTAURANT AREA- 305 SQ.MT. SITTING FOR 132 PERSONS.IT OFFERS WORLD CUISINE, WITH AN INTERACTIVE. TWO EXCLUSIVE PRIVATE DINNING ROOMS COMPLEMENT THE RESTAURANT AND TO COMPLETE THE SETTINGS IS AN OUTDOOR SEATING AREA SET AMIDST FLOWING WATER BODIES.
THE RESTAURANT IS SERVED DIRECTLY FROM THE MAIN KITCHEN.ANOTHER RESTAURANT ON THE FIRST FLOOR OFFERS CHINESE AND THAI CUISINES AND HAS ITS SEPARATE KITCHEN THERE.SO INSTEAD OF PROVIDING A LARGE KITCHEN SERVING ALL TYPES OF FOOD, THE ARCHITECTS HAVE PROVIDED TWO SPECIALIZED KITCHENS ON DIFFERENT FLOORS, THEREBY DIVIDING THE TRAFFIC.
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
12
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
FIRST FLOORFIRST FLOOR
Restaurant area Private dining areasKitchenOffice areaConference roomService coreVertical circulation
Restaurant cum Dining areas
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
ZONING-First FloorZONING-First Floor
Sauna and steam roomFitness areaAyurveda areaStaff areaVertical circulation
spa area -3500 sq.ft. comprise of 8 beautiful appointed treatment rooms
where a holistic blend of international wellness treatments are offered.
Separate wet areas of men and women include – a vitality pool overlooking spectacular garden views and luxurious steam and sauna.
SPA AREA
spa reception
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
TYPICAL FLOORTYPICAL FLOOR
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
ZONING-Typical FloorZONING-Typical Floor
Hotel has 248 elegantly appointed rooms including 10 suites, situated to ensure panoramic views of a historic city. All the rooms are carefully designed to the highest levels of sensuality, comfort and taste that is the hallmark of the ISTA brand. Rest all of the floors are similar to the second floor.
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
ROOMS LAYOUTROOMS LAYOUT
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
SERVICE FLOORSERVICE FLOOR
TERRACE
TERRACETERRACE
BELOWSWIM
MIN
G P
OO
L
CUT-OUTSITTING BESIDE
POOL
The service floor is above the first floor of the hotel. This floor has space for air heating units which serve the restaurants and dining. Also the pipes coming from the internal vertical ducts of the rooms above become horizontal
on this floor and get transferred to the external ducts. The height of this floor is 2.7mt.
One can approach this floor only through two staircases. The ‘yellow hatched’ portion is the corridor connecting two staircases. No lifts stops on this floor. The swimming pool is present on this floor. However the access to the pool is
from first floor through the staircase. There is a pantry on this floor which serves the guests at the pool side.
Staircase from first floor to the pool
Pantry serving guests at the pool side
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
KITCHENKITCHEN
There are four kitchens in the hotel. • The first one on the ground floor serves Indian and Continental restaurant. • The second one on the first floor caters to the Chinese and Thai restaurant. • The third one in the first basement serves the staff dining. • The fourth one also in the first basement is for meat preparation.The kitchens serving the restaurants also serves the rooms above.
MAIN KITCHEN ON GROUND FLOOR
The area of this kitchen is 195 sq.mt.The area of Thai and Chinese kitchen is 145 sq.mt. R.S.O.
PREPARATION AREA
TROLLEY ARRANGEMENT
1800
MM
SER
VIC
E C
OR
RID
OR
WALK-IN
DISHWASHINGTROLLEYS
BAKERY
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
STAFF AREASSTAFF AREAS
Staff Dining
Lock
ers
Staff Entrance
The staff areas(staff dining and lockers) are located in the first basement of the hotel. These can be accessed through service corridors coming from staff entrance.The staff dining has its own separate kitchen and storage. These areas are planned away from the main activity areas like kitchen, so that the staff can relax a bit.
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
Back of the House Areas- Main Store
Staff Entrance
Main Store
The main store is located in the first basement. It has different areas like:1.Food and vegetable storage2.Wine and liquor storage3.Dry food storage4.Meat storage5.Dairy Storage6.Soft drink storage
• The fresh material is unloaded at truck dock on ground floor.• From there it travels through the service corridor to the service lifts.• From there down to the main store in first basement.
Truck Dock Staff Entrance
First Basement Plan
Ground Floor Plan
Garbage Room All the waste from the kitchens and other areas is stored in bags and kept in garbage room from where it is cleared periodically.
Soft Drink Storage
Truck Dock
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
BUILDING SECTION-1BUILDING SECTION-1
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
BUILDING SECTION-2BUILDING SECTION-2
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
West ElevationWest Elevation
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
Five water tanks are also provided on the lower basement of which, two are the raw water tanks and the other three are the treated water tanks.
Administrative block is provided on the upper basement so that it can provide the complete services to the hotel. A staff cafeteria is also provided on the upper basement for the of administrative staff.
Fire plant room and fire tanks are provided on the upper basement to extinguish or prevent any fire in case it arises.
UPPER BASEMENT LOWER BASEMENT
Basement Floor PlanBasement Floor Plan
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
26
FIRST BASEMENT FLOOR
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
DG SETS BOILER ROOMFIRE TANK RAW WATER TANK
TREATED WATER TANK
AC PLANT ROOM
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
Air conditioning is perhaps a very important aspect of services. It is needed to provide year round comfort with help of economical and efficient air-conditioning system. The mechanical ventilation system is also provided for parking Electrical Sub-station, DG room, AC plant room etc.AC plant has been located in the lower basement. Both the basements contain a number of Ventilation rooms, fresh air and exhaust air shafts etc.
AC DUCT
VENTILATION FAN ROOM
AC PLANT ROOM
Air ConditioningAir Conditioning
CA
SE
ST
UD
Y –
HO
TE
L I
ST
A
A separate sub station for electricity supply is provided outside the hotel to avoid any fire hazard. Two main transformers are used in the sub station. For uninterrupted power supply, DG sets are provided in the lower basement of the hotel.
SUB STATION
PANEL ROOM
DG ROOM
TRANSFORMER
Electricity SupplyElectricity Supply
Top Related