H-GAC 2017-2020 TIP and 2040 RTP
January TPC Amendments
Fed/State Local
16313
0523-08-013
TXDOT HOUSTON
DISTRICT (MON)
FM 1488 (EXISTING FM …, FM 1774)
CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION…
R RTP(CONFORM)
Add Add
(2024)
16314
0523-09-018
TXDOT HOUSTON
DISTRICT (MON)
FM 1488 (FM 1774, PROPOSED SH …)
CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION…
R RTP(CONFORM)
Add Add
(2024)
499
0523-09-009
TXDOT HOUSTON
DISTRICT (MON)
FM 1488 (FM 1774, W OF FM 149)
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …
R RTP(CONFORM)
($26.4) -0- Fed Advance
(2025 to 2023)
16315
0523-04-017
TXDOT HOUSTON
DISTRICT (MON)
FM 1488 (W OF JOSEPH …, MONTGOMERY C…)
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …
R RTP(CONFORM)
+ $2.0 -0- Add Add
(2023)
501
0523-08-007
TXDOT HOUSTON
DISTRICT (MON)
FM 1488 (WALLER C/L, FM 1774)
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …
R RTP(CONFORM)
($17.7) -0- Fed Limits Advance
(2025 to 2023)
10133
0976-02-086
TXDOT HOUSTON
DISTRICT (BRA)
FM 518 (FM 865, SH 35)
RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES
R RTP(CONFORM)
Add Add
(2024)
10132
3416-01-012
TXDOT HOUSTON
DISTRICT (BRA)
FM 518 (SH 288, FM 865)
RECONSTRUCT AND WIDEN FROM 4 AND 6 LANES…
R RTP(CONFORM)
Add Add
(2024)
514
3049-01-022
TXDOT HOUSTON
DISTRICT (GAL)
FM 646 (EDMUNDS WAY, FM 1266)
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…
R RTP(CONFORM)
($29.9) -0- Fed Advance
(2024 to 2022)
10920
3049-01-023
TXDOT HOUSTON
DISTRICT (GAL)
FM 646 (FM 1266, FM 3436)
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…
R RTP(CONFORM)
($18.6) -0- Fed Advance
(2025 to 2023)
10144
0978-02-053
TXDOT HOUSTON
DISTRICT (GAL)
FM 646 (FM 3436, SH 146)
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…
R RTP(CONFORM)
($7.4) -0- Fed Advance
(2025 to 2023)
1099
0508-01-359
CITY OF BAYTOWN
(HAR)
IH 10 E (JOHN MARTIN …, GARTH RD)
EB RAMPS REVERSAL
R STIP + $1.0 Cat-1
16328
0500-03-599
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (AT IH 10, )
RECONSTRUCT INTERCHANGE INCLUDING IH 10 …
R RTP(CONFORM)
Add
(NHHIP)
Add
(2025)
16327
0500-03-597
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (AT IH 610, )
RECONSTRUCT INTERCHANGE
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16329
0500-03-601
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (AT IH 69 S, )
RECONSTRUCT INTERCHANGE INCLUDING IH 45 …
R RTP(CONFORM)
+ $856.5 -0- Add
(NHHIP)
Add
(2021)
16330
0500-08-001
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (AT IH 69/IH …, )
RECONSTRUCT INTERCHANGE INCLUDING IH 45,…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2023)
16332
0500-03-560
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (IH 10, IH 610)
RECONSTRUCT MAIN LANES, FRONTAGE LANES A…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16334
0110-06-132
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (S OF WEST RD, N OF BW 8)
RECONSTRUCT MAIN LANES, FRONTAGE LANES A…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
MPOID/CSJ Sponsor/County Project
Proj
Type
Proposed Modifications
TypeFunding (M)
Scope Schedule
Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018
Page 1 of 3
H-GAC 2017-2020 TIP and 2040 RTP
January TPC Amendments
Fed/State LocalMPOID/CSJ Sponsor/County Project
Proj
Type
Proposed Modifications
TypeFunding (M)
Scope Schedule16331
0500-03-446
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 (TIDWELL RD, S OF SHEPHER…)
RECONSTRUCT MAIN LANES, FRONTAGE LANES A…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16333
0500-03-596
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 N (IH 610, TIDWELL RD)
RECONSTRUCT MAIN LANES, FRONTAGE LANES A…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16335
0110-06-139
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 N (S OF SHEPHER…, S OF WEST RD)
RECONSTRUCT MAIN LANES, FRONTAGE LANES A…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16336
0500-03-598
TXDOT HOUSTON
DISTRICT (HAR)
IH 45 S (IH 69, IH 10)
REMOVE EXISTING PIERCE ELEVATED AND CONS…
R RTP(CONFORM)
Add
(NHHIP)
Add
(2026)
16337
0027-13-221
TXDOT HOUSTON
DISTRICT (HAR)
IH 69 (AT MCGOWEN, …, )
RECONSTRUCT 3 BRIDGES
R STIP(CONFORM)
+ $55.8 -0- Add
(NHHIP)
Add
(2020)
7428
0027-13-200
TXDOT HOUSTON
DISTRICT (HAR)
IH 69 S (IH 45, SH 288)
WIDEN FROM 8 TO 12 MAIN LANES AND RECONS…
R RTP(CONFORM)
+ $173.5 -0- Add
(NHHIP)
Add
(2021)
155
0027-13-201
TXDOT HOUSTON
DISTRICT (HAR)
IH 69 S (SH 288, SP 527)
RECONSTRUCT TO 10 MAIN LANES
R STIP(CONFORM)
+ $192.0 -0- Add
(NHHIP)
Add
(2020)
11743 GULF COAST
CENTER (BRA)
LAKE JACKSON/ANG… (VA, VA)
LAKE JACKSON/ANGLETON CAPITAL COST OF CO…
T STIP + $0.2 FTA
5307
Add grant. Add grant.
11744 GULF COAST
CENTER (BRA)
LAKE JACKSON/ANG… (VA, VA)
LAKE JACKSON/ANGLETON CAPITAL ENGINEERIN…
T STIP + $0.9 FTA
5307
Add grant. Add grant.
504
0338-04-060
TXDOT HOUSTON
DISTRICT (MON)
SH 105 (10TH ST, SL 336)
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…
R RTP(CONFORM)
($12.7) -0- Source Advance
(2024 to 2021)
16338
0338-05-028
TXDOT BEAUMONT
DISTRICT (LIB)
SH 105 (MONTGOMERY C…, CLEVELAND BY…)
WIDEN FROM 2 TO 4 LANES
R RTP(CONFORM)
Add Add
(2024)
7705
0338-06-011
TXDOT HOUSTON
DISTRICT (SAN)
SH 105 (MONTGOMERY C…, MONTGOMERY C…)
INFORMATION ONLY (PROJECT IN SAN JACINTO…
R RTP(CONFORM)
($5.9) -0- Source Advance
(2024 to 2022)
7706
0338-07-019
TXDOT HOUSTON
DISTRICT (MON)
SH 105 (SAN JACINTO …, LIBERTY C/L)
WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WI…
R RTP(CONFORM)
($21.3) -0- Advance
(2024 to 2023)
467
0389-07-025
TXDOT HOUSTON
DISTRICT (GAL)
SH 146 (FM 519, SL 197)
CONSTRUCT RR OVERPASS
R RTP(CONFORM)
+ $15.0 -0- Partial Advance
(2030 to 2021)
13841
0389-05-129
TXDOT HOUSTON
DISTRICT (HAR)
SH 146 (N OF FAIRMON…, SPENCER HWY)
CONSTRUCT NEW CONCRETE PAVEMENT TO REMOV…
R RTP(CONFORM)
+ $0.3 -0- Add Add
(2023)
914
0720-02-074
MONTGOMERY
COUNTY (MON)
SH 249 (FM 1774/FM 1…, SPRING CREEK…)
CONSTRUCT 4-LANE TOLLWAY WITH GRADE SEPA…
R STIP(CONFORM)
-0- ($19.9) Description
16349 MONTGOMERY
COUNTY (MON)
SH 249 (FM 1774/FM 1…, SPRING CREEK…)
WIDEN FROM 4-LANE TO 6-LANE TOLLWAY
R RTP(CONFORM)
Add Add
(2035)
Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018
Page 2 of 3
H-GAC 2017-2020 TIP and 2040 RTP
January TPC Amendments
Fed/State LocalMPOID/CSJ Sponsor/County Project
Proj
Type
Proposed Modifications
TypeFunding (M)
Scope Schedule16342
0720-03-133
TXDOT HOUSTON
DISTRICT (HAR)
SH 249 (S OF CHASEWO…, N OF GREGSON…)
WIDEN FROM 6 TO 8 LANES AND RAMP REVERSA…
R STIP(CONFORM)
+ $3.2 -0- Add Add
(2018)
14712
0188-03-022
TXDOT HOUSTON
DISTRICT (BRA)
SH 36 (N OF CR 467/…, SH 35)
GRADE SEPARATION OVER NEW SH 35 AND REST…
R STIP Delay FY2019 to
FY2022.
251
0111-08-100
TXDOT HOUSTON
DISTRICT (BRA)
SH 36 (S OF THE BRA…, FM 1495)
WIDEN FROM 2 TO 4 LANES (SEG 15)
R STIP(CONFORM)
+ $8.5 -0- Add Add
(2019)
14248
3187-02-010
TXDOT BEAUMONT
DISTRICT (CHA)
SH 99 (AT IH 10 E, )
SEG I-1/I-2: CONSTRUCT 4 DCs (TOLL)
R STIP(CONFORM)
Delay
(2020 to 2025)
187
0338-11-028
TXDOT HOUSTON
DISTRICT (MON)
SL 336 (E OF IH 45, FM 3083)
WIDEN FROM 4 TO 6 LANES
R RTP(CONFORM)
Add Add
(2025)
16343
0338-11-056
TXDOT HOUSTON
DISTRICT (MON)
SL 336 (FM 1314, IH 45)
WIDEN FROM 2 TO 4 LANES
R RTP(CONFORM)
Add Add
(2022)
16344
3256-03-096
TXDOT HOUSTON
DISTRICT (HAR)
SL 8 (US 90, S OF IH 10 E)
WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXIST…
R STIP(CONFORM)
+ $0.5 -0- Add Add
(2020)
11740 GULF COAST
CENTER (GAL)
TEXAS CITY/LA MA… (VA, VA)
TEXAS CITY/LA MARQUE CAPITAL COST OF CON…
T STIP + $0.3 FTA
5307
Add grant. Add grant.
11741 GULF COAST
CENTER (GAL)
TEXAS CITY/LA MA… (VA, VA)
TEXAS CITY/LA MARQUE OPERATING ASSISTANC…
T STIP + $0.9 FTA
5307
Add grant. Add grant.
11742 GULF COAST
CENTER (GAL)
TEXAS CITY/LA MA… (VA, VA)
TEXAS CITY/LA MARQUE PLANNING: FY 2017
T STIP + $0.2 FTA
5307
Add grant. Add grant.
16345 METRO (HAR) US 290 (BARKER CYPRE…, W 34TH ST)
OFF-PEAK DIAMOND/HOV LANES WITH DYNAMIC …
R STIP(CONFORM)
-0- + $4.7 Add Add
(2018)
16016
0050-09-089
TXDOT HOUSTON
DISTRICT (HAR)
US 290 (W OF FM 529, W OF LITTLE …)
CONSTRUCT 3-LANE REVERSIBLE MANAGED LANE…
R RTP(CONFORM)
Cancel. Cancel.
16346
0177-03-099
TXDOT BEAUMONT
DISTRICT (LIB)
US 59 (SAN JACINTO …, N END OF CLE…)
CONVERT MAINLANES TO FREEWAY AND CONSTRU…
R RTP(CONFORM)
Add Add
(2022)
16347
0028-04-069
TXDOT BEAUMONT
DISTRICT (LIB)
US 90 (FM 160, SH 61)
RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED …
R RTP(CONFORM)
+ $40.0 -0- Add Add
(2024)
16348
0027-08-180
TXDOT HOUSTON
DISTRICT (FOR)
US 90A (AT SH 99, )
CONSTRUCT GRADE SEPARATION AND INTERSECT…
R RTP(CONFORM)
-0- + $27.0 Add Add
(2021)
Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018
Page 3 of 3
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 1099/0508-01-359 FY 2018
Amendment #JAN-2018 - 1/26/18 - Add $1M of Category-1 funding. ***
Amendment #15 - 12/16/16 - Add to the TIP.
EB RAMPS REVERSAL
HOUSTON HARRIS 0508-01-359 IH 10 C BAYTOWN CITY OF BAYTOWN $4,000,000
JOHN MARTIN RD
GARTH RD
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $4,000,000
Preliminary Engineering: $196,000
Construction Engineering: $240,000
Contingencies: $400,000
Indirects: $203,200
Total Project Cost: $5,039,200
Right Of Way: ---
Bond Financing: ---
1,3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$4,000,000
1099MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
IH 10 ESTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
1-PREV-M: $800,000 $200,000 --- $1,000,000 --- ---
3-LOCAL CONT: --- --- --- $3,000,000$3,000,000 ---
Funding by Share: $800,000 --- $4,000,000$3,000,000 ---$200,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 1
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 1099/0508-01-359 FY 2018
Amendment #15 - 12/16/16 - Add to the TIP.
EB RAMPS REVERSAL
HOUSTON HARRIS 0508-01-359 IH 10 C BAYTOWN CITY OF BAYTOWN $3,000,000
JOHN MARTIN RD
GARTH RD
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $4,000,000
Preliminary Engineering: $196,000
Construction Engineering: $240,000
Contingencies: $400,000
Indirects: $203,200
Total Project Cost: $5,039,200
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$4,000,000
1099MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
IH 10 ESTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-LOCAL CONT: --- --- --- $3,000,000$3,000,000 ---
Funding by Share: --- --- $3,000,000$3,000,000 --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 2
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 11740/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 projects with TDCs in the
TIP.
TEXAS CITY/LA MARQUE CAPITAL COST OF CONTRACTING: FY 2017
HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $300,000
VA
VA
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $300,000
Preliminary Engineering: ---
Construction Engineering: ---
Contingencies: ---
Indirects: ---
Total Project Cost: $300,000
Right Of Way: ---
Bond Financing: ---
5307FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$300,000
11740MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
TEXAS CITY/LA MARQUESTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec. 5307: $300,000 --- --- $300,000 --- ---
Funding by Share: $300,000 --- $300,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 3
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 11740/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 4
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 11741/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 projects with TDCs.
TEXAS CITY/LA MARQUE OPERATING ASSISTANCE: FY 2017
HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $918,392
VA
VA
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $918,392
Preliminary Engineering: ---
Construction Engineering: ---
Contingencies: ---
Indirects: ---
Total Project Cost: $918,392
Right Of Way: ---
Bond Financing: ---
5307FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$918,392
11741MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
TEXAS CITY/LA MARQUESTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec. 5307: $918,392 --- --- $918,392 --- ---
Funding by Share: $918,392 --- $918,392 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 5
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 11741/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 6
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 11742/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.
TEXAS CITY/LA MARQUE PLANNING: FY 2017
HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $200,000
VA
VA
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $200,000
Preliminary Engineering: ---
Construction Engineering: ---
Contingencies: ---
Indirects: ---
Total Project Cost: $200,000
Right Of Way: ---
Bond Financing: ---
5307FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$200,000
11742MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
TEXAS CITY/LA MARQUESTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec. 5307: $200,000 --- --- $200,000 --- ---
Funding by Share: $200,000 --- $200,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 7
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 11742/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 8
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 11743/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.
LAKE JACKSON/ANGLETON CAPITAL COST OF CONTRACTING: FY 2017
HOUSTON BRAZORIA VA T ANGLETON GULF COAST CENTER $200,000
VA
VA
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $200,000
Preliminary Engineering: ---
Construction Engineering: ---
Contingencies: ---
Indirects: ---
Total Project Cost: $200,000
Right Of Way: ---
Bond Financing: ---
5307FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$200,000
11743MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
LAKE JACKSON/ANGLETONSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec. 5307: $200,000 --- --- $200,000 --- ---
Funding by Share: $200,000 --- $200,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 9
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 11743/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 10
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 11744/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.
LAKE JACKSON/ANGLETON CAPITAL ENGINEERING DESIGN: FY 2017
HOUSTON BRAZORIA VA T ANGLETON GULF COAST CENTER $876,665
VA
VA
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $876,665
Preliminary Engineering: ---
Construction Engineering: ---
Contingencies: ---
Indirects: ---
Total Project Cost: $876,665
Right Of Way: ---
Bond Financing: ---
5307FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$876,665
11744MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
LAKE JACKSON/ANGLETONSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec. 5307: $876,665 --- --- $876,665 --- ---
Funding by Share: $876,665 --- $876,665 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 11
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 11744/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 12
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 14712/0188-03-022 FY 2022
Amendment #JAN-2018 - 1/26/18 - Delay out of TIP into FY2022 of the RTP. ***
Amendment #SEP-2017A - 9/22/17 - Change sponsor to TxDOT, delay to FY 2019
and reflect potential use of federal funds.
GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4-LANES
HOUSTON BRAZORIA 0188-03-022 SH 36 WEST COLUMBIA TXDOT HOUSTON DISTRICT $11,073,302
N OF CR 467/HOGG RANCH RD
SH 35
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
14712MPO PROJECT ID:
Project History:
SH 36STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, January 23, 2018
26-JAN-18 Page 13
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 14712/0188-03-022 FY 2019
Amendment #SEP-2017A - 9/22/17 - Change sponsor to TxDOT, delay to FY 2019
and reflect potential use of federal funds.
GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4-LANES
HOUSTON BRAZORIA 0188-03-022 SH 36 C WEST COLUMBIA TXDOT HOUSTON DISTRICT $7,707,000
N OF CR 467/HOGG RANCH RD
SH 35
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $7,707,000
Preliminary Engineering: $377,643
Construction Engineering: $361,458
Contingencies: $576,483
Indirects: $364,541
Total Project Cost: $11,073,302
Right Of Way: $1,686,177
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$7,707,000
14712MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 36STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-PTF: $6,165,600 $1,541,400 --- $7,707,000 --- ---
Funding by Share: $6,165,600 --- $7,707,000 --- ---$1,541,400
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 14
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16345/NA FY 2018
Amendment #JAN-2018 - 1/26/18 - Add operational treatment project to the TIP.
One main lane in each direction will be operated as a diamond/HOV lane in the off-
peak direction (WB in AM, EB in PM).
OFF-PEAK DIAMOND/HOV LANES WITH DYNAMIC MESSAGE SIGNS (1 LANE EACH DIRECTION)
HOUSTON HARRIS US 290 C HOUSTON METRO $4,690,000
BARKER CYPRESS RD
W 34TH ST
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $4,690,000
Preliminary Engineering: $229,810
Construction Engineering: $281,400
Contingencies: $469,000
Indirects: $238,252
Total Project Cost: $5,908,462
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$4,690,000
16345MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
US 290STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-LOCAL: --- --- $4,690,000 $4,690,000 --- ---
Funding by Share: --- $4,690,000 $4,690,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 15
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16345/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 16
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16327/0500-03-597 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the
RTP.
RECONSTRUCT INTERCHANGE
HOUSTON HARRIS 0500-03-597 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $953,431,035
AT IH 610LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16327MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 17
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16327/0500-03-597
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 18
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16328/0500-03-599 FY 2025
Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the
RTP. Express lanes are non-tolled.
RECONSTRUCT INTERCHANGE INCLUDING IH 10 EXPRESS LANES
HOUSTON HARRIS 0500-03-599 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,060,081,286
AT IH 10LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16328MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 19
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16328/0500-03-599
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 20
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16329/0500-03-601 FY 2021
Amendment #JAN-2018 - 1/26/18 - Add NHHIP to the RTP, funding committed by
TxDOT at Mar 2017 Commission meeting.
RECONSTRUCT INTERCHANGE INCLUDING IH 45 & IH 69 MAINLANES
HOUSTON HARRIS 0500-03-601 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,485,488,700
AT IH 69 SLIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16329MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 21
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16329/0500-03-601
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 22
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16330/0500-08-001 FY 2023
Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the
RTP. Express lanes are non-tolled.
RECONSTRUCT INTERCHANGE INCLUDING IH 45, IH 10 & IH 69
MAINLANES AND IH 10 EXPRESS LANES
HOUSTON HARRIS 0500-08-001 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,268,315,436
AT IH 69/IH 10LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16330MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 23
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16330/0500-08-001
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 24
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16331/0500-03-446 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the
RTP.
RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4
ADDITIONAL MANAGED LANES
HOUSTON HARRIS 0500-03-446 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $653,249,875
TIDWELL RD
S OF SHEPHERD DR
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16331MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 25
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16331/0500-03-446
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 26
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16332/0500-03-560 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the
RTP.
RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED
LANES
HOUSTON HARRIS 0500-03-560 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $499,303,972
IH 10
IH 610
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16332MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 27
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16332/0500-03-560
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 28
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16333/0500-03-596 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority to the RTP.
RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED
LANES
HOUSTON HARRIS 0500-03-596 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $567,366,612
IH 610
TIDWELL RD
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16333MPO PROJECT ID:
Project History:
IH 45 NSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 29
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16333/0500-03-596
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 30
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16334/0110-06-132 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP development authority project to
the RTP.
RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED
LANES
HOUSTON HARRIS 0110-06-132 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $492,763,520
S OF WEST RD
N OF BW 8
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16334MPO PROJECT ID:
Project History:
IH 45STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 31
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16334/0110-06-132
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 32
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16335/0110-06-139 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the
RTP.
RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED
LANES
HOUSTON HARRIS 0110-06-139 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $639,936,760
S OF SHEPHERD DR
S OF WEST RD
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16335MPO PROJECT ID:
Project History:
IH 45 NSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 33
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16335/0110-06-139
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 34
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16336/0500-03-598 FY 2026
Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the
RTP.
REMOVE EXISTING PIERCE ELEVATED AND CONSTRUCT PARKWAY CONNECTORS INTO
DOWNTOWN HOUSTON
HOUSTON HARRIS 0500-03-598 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $267,845,342
IH 69
IH 10
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16336MPO PROJECT ID:
Project History:
IH 45 SSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 35
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16336/0500-03-598
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 36
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 155/0027-13-201 FY 2020
Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the TIP. Funding
committed by TxDOT at the Mar 2017 Commission meeting.
RECONSTRUCT TO 10 MAIN LANES
HOUSTON HARRIS 0027-13-201 US 69 C HOUSTON TXDOT HOUSTON DISTRICT $192,000,000
SH 288
SP 527
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $192,000,000
Preliminary Engineering: $9,408,000
Construction Engineering: $7,680,000
Contingencies: $19,200,000
Indirects: $9,753,600
Total Project Cost: $293,241,600
Right Of Way: $55,200,000
Bond Financing: ---
12FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$192,000,000
155MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
IH 69 SSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
12-STRATEGIC: $153,600,000 $38,400,000 --- $192,000,000 --- ---
Funding by Share: $153,600,000 --- $192,000,000 --- ---$38,400,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 37
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 155/0027-13-201
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 38
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 7428/0027-13-200 FY 2021
Amendment #JAN-2018 -1/26/18 - Add NHHIP project segment to the RTP. Funding committed by TxDOT at the Mar 2017 Commission meeting.
WIDEN FROM 8 TO 12 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE
HOUSTON HARRIS 0027-13-200 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $173,500,000
IH 45
SH 288
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $173,500,000
Preliminary Engineering: $8,501,500
Construction Engineering: $6,940,000
Contingencies: $17,350,000
Indirects: $8,813,800
Total Project Cost: $215,105,300
Right Of Way: ---
Bond Financing: ---
12FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$173,500,000
7428MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
IH 69 SSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
12-STRATEGIC: $138,800,000 $34,700,000 --- $173,500,000 --- ---
Funding by Share: $138,800,000 --- $173,500,000 --- ---$34,700,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 39
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 7428/0027-13-200 FY 2021
Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the RTP.
Funding committed by TxDOT at the Mar 2017 Commission meeting.
WIDEN FROM 8 TO 12 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE
HOUSTON HARRIS 0027-13-200 IH 69 HOUSTON TXDOT HOUSTON DISTRICT $239,160,300
IH 45
SH 288
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
7428MPO PROJECT ID:
Project History:
IH 69 SSTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 40
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16337/0027-13-221 FY 2020
Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the TIP. Funding
committed by TxDOT at March 2017 Commission meeting.
RECONSTRUCT 3 BRIDGES
HOUSTON HARRIS 0027-13-221 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $55,800,000
AT MCGOWEN, TUAM AND ELGINLIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $55,800,000
Preliminary Engineering: $2,734,200
Construction Engineering: $2,232,000
Contingencies: $5,580,000
Indirects: $2,834,640
Total Project Cost: $73,680,840
Right Of Way: $4,500,000
Bond Financing: ---
12FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$55,800,000
16337MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
IH 69STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
12-STRATEGIC: $44,640,000 $11,160,000 --- $55,800,000 --- ---
Funding by Share: $44,640,000 --- $55,800,000 --- ---$11,160,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 41
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16337/0027-13-221
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 42
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16342/0720-03-133 FY 2018
Amendment #JAN-2018 - 1/26/18 - Re-striping to eliminate capacity bottleneck.
Project funded under district maintenance program (Cat 1).
WIDEN FROM 6 TO 8 LANES AND RAMP REVERSAL AT SPRING CYPRESS RD (RE-STRIPE EXISTING
PAVEMENT)
HOUSTON HARRIS 0720-03-133 SH 249 C NONE TXDOT HOUSTON DISTRICT $3,200,000
S OF CHASEWOOD PARK DR
N OF GREGSON RD
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $3,200,000
Preliminary Engineering: $156,800
Construction Engineering: $192,000
Contingencies: $320,000
Indirects: $162,560
Total Project Cost: $4,031,360
Right Of Way: ---
Bond Financing: ---
1FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$3,200,000
16342MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 249STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
1-PREV-M: $2,560,000 $640,000 --- $3,200,000 --- ---
Funding by Share: $2,560,000 --- $3,200,000 --- ---$640,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 43
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16342/0720-03-133
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 44
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16344/3256-03-096 FY 2020
Amendment #JAN-2018 - 1/26/18 - Re-striping project to eliminate capacity
bottleneck. Funding committed by TxDOT Houston District (Cat 11)
WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXISTING PAVEMENT)
HOUSTON HARRIS 3256-03-096 SL 8 C NONE TXDOT HOUSTON DISTRICT $500,000
US 90
S OF IH 10 E
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $500,000
Preliminary Engineering: $24,500
Construction Engineering: $45,000
Contingencies: $50,000
Indirects: $25,400
Total Project Cost: $644,900
Right Of Way: ---
Bond Financing: ---
11FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$500,000
16344MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SL 8STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
11-ST DIST DISC: $400,000 $100,000 --- $500,000 --- ---
Funding by Share: $400,000 --- $500,000 --- ---$100,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 45
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16344/3256-03-096
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 46
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 16348/0027-08-180 FY 2021
Amendment #JAN-2018 -1/26/18 - Add locally funded project to the RTP. Funding provided by Fort Bend County.
CONSTRUCT GRADE SEPARATION AND INTERSECTION IMPROVEMENTS
HOUSTON FORT BEND 0027-08-180 US 90A C NONE TXDOT HOUSTON DISTRICT $27,000,000
AT SH 99LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $27,000,000
Preliminary Engineering: $1,323,000
Construction Engineering: $1,080,000
Contingencies: $2,700,000
Indirects: $1,371,600
Total Project Cost: $33,474,600
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$27,000,000
16348MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
US 90ASTREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-LOCAL: --- --- $27,000,000 $27,000,000 --- ---
Funding by Share: --- $27,000,000 $27,000,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 47
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 16348/0027-08-180
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 48
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16338/0338-05-028 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
WIDEN FROM 2 TO 4 LANES
BEAUMONT LIBERTY 0338-05-028 SH 105 CLEVELAND TXDOT BEAUMONT DISTRICT $15,552,107
MONTGOMERY C/L
CLEVELAND BYPASS
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16338MPO PROJECT ID:
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 49
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16338/0338-05-028 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
WIDEN FROM 2 TO 4 LANES
BEAUMONT LIBERTY 0338-05-028 SH 105 CLEVELAND TXDOT BEAUMONT DISTRICT $15,552,107
MONTGOMERY C/L
CLEVELAND BYPASS
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16338MPO PROJECT ID:
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 50
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16346/0177-03-099 FY 2022
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
CONVERT MAINLANES TO FREEWAY AND CONSTRUCT TWO 2-LANE FRONTAGE ROADS
BEAUMONT LIBERTY 0177-03-099 US 59 CLEVELAND TXDOT BEAUMONT DISTRICT $70,265,982
SAN JACINTO C/L
N END OF CLEVELAND BYPASS
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16346MPO PROJECT ID:
Project History:
US 59STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 51
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16346/0177-03-099 FY 2022
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
CONVERT MAINLANES TO FREEWAY AND CONSTRUCT TWO 2-LANE FRONTAGE ROADS
BEAUMONT LIBERTY 0177-03-099 US 59 CLEVELAND TXDOT BEAUMONT DISTRICT $70,265,982
SAN JACINTO C/L
N END OF CLEVELAND BYPASS
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16346MPO PROJECT ID:
Project History:
US 59STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 52
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16313/0523-08-013 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)
HOUSTON MONTGOMERY 0523-08-013 FM 1488 NONE TXDOT HOUSTON DISTRICT $19,088,736
EXISTING FM 1488, W OF MAGNOLIA
FM 1774
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16313MPO PROJECT ID:
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 53
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16313/0523-08-013 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)
HOUSTON MONTGOMERY 0523-08-013 FM 1488 NONE TXDOT HOUSTON DISTRICT $19,088,736
EXISTING FM 1488, W OF MAGNOLIA
FM 1774
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16313MPO PROJECT ID:
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 54
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16314/0523-09-018 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)
HOUSTON MONTGOMERY 0523-09-018 FM 1488 NONE TXDOT HOUSTON DISTRICT $22,120,200
FM 1774
PROPOSED SH 249
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16314MPO PROJECT ID:
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 55
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16314/0523-09-018 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)
HOUSTON MONTGOMERY 0523-09-018 FM 1488 NONE TXDOT HOUSTON DISTRICT $22,120,200
FM 1774
PROPOSED SH 249
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16314MPO PROJECT ID:
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 56
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 10132/3416-01-012 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
RECONSTRUCT AND WIDEN FROM 4 AND 6 LANES TO 6 LANES
HOUSTON BRAZORIA 3416-01-012 FM 518 PEARLAND TXDOT HOUSTON DISTRICT $36,417,010
SH 288
FM 865
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
10132MPO PROJECT ID:
Project History:
FM 518STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 57
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 10132/3416-01-012
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 58
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 10133/0976-02-086 FY 2024
Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.
RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES
HOUSTON BRAZORIA 0976-02-086 FM 518 PEARLAND TXDOT HOUSTON DISTRICT $36,417,010
FM 865
SH 35
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
10133MPO PROJECT ID:
Project History:
FM 518STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 59
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 10133/0976-02-086
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 60
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 187/0338-11-028 FY 2025
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
WIDEN FROM 4 TO 6 LANES
HOUSTON MONTGOMERY 0338-11-028 LP 336 CONROE TXDOT HOUSTON DISTRICT $28,623,358
E OF IH 45
FM 3083
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
187MPO PROJECT ID:
Project History:
LP 336STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 61
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 187/0338-11-028
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 62
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16343/0338-11-056 FY 2022
Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the
RTP.
WIDEN FROM 2 TO 4 LANES
HOUSTON MONTGOMERY 0338-11-056 SL 336 CONROE TXDOT HOUSTON DISTRICT $16,329,023
FM 1314
IH 45
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16343MPO PROJECT ID:
Project History:
SL 336STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 63
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 16343/0338-11-056
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 64
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 914/0720-02-074 FY 2018
Amendment #JAN-2018 - 1/26/18 - Modify scope to reflect initial 4-lane tollway.
Future widening to 6-lanes added to RTP (MPOID 16349).
CONSTRUCT 4-LANE TOLLWAY WITH GRADE SEPARATIONS AT STAGECOACH RD AND
WOODLANDS PARKWAY
HOUSTON MONTGOMERY 0720-02-074 SH 249 C,E,R NONE MONTGOMERY COUNTY $110,000,000
FM 1774/FM 149 IN PINEHURST
SPRING CREEK/HARRIS C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $93,138,739
Preliminary Engineering: $3,539,272
Construction Engineering: $11,968,328
Contingencies: $14,790,432
Indirects: $6,491,770
Total Project Cost: $129,928,541
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$110,000,000
914MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 249STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-TOLL: --- --- $110,000,000 $110,000,000 --- ---
Funding by Share: --- $110,000,000 $110,000,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 65
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 914/0720-02-074 FY 2018
CONSTRUCT 6-LANE TOLLWAY WITH GRADE SEPARATIONS AT STAGECOACH RD AND
WOODLANDS PARKWAY
HOUSTON MONTGOMERY 0720-02-074 SH 249 C,E,R NONE MONTGOMERY COUNTY $129,930,000
FM 1774/FM 149 IN PINEHURST
SPRING CREEK/HARRIS C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $93,138,739
Preliminary Engineering: $3,539,272
Construction Engineering: $11,968,328
Contingencies: $14,790,432
Indirects: $6,491,770
Total Project Cost: $129,928,541
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$129,930,000
914MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 249STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-TOLL: --- --- $129,930,000 $129,930,000 --- ---
Funding by Share: --- $129,930,000 $129,930,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 66
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16349/NA FY 2035
Amendment #JAN-2018 - 1/26/18 - Add 6-lane widening to RTP to retain ultimate
scope. Initial construction as 4-lane tollway is designed for future 6-lane widening.
WIDEN FROM 4-LANE TO 6-LANE TOLLWAY
HOUSTON MONTGOMERY SH 249 MONTGOMERY COUNTY $30,000,000
FM 1774/FM 149 IN PINEHURST
SPRING CREEK/HARRIS C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
16349MPO PROJECT ID:
Project History:
SH 249STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 67
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 16349/NA
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Thursday, August 10, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 68
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 14248/3187-02-010 FY 2025
Amendment #JAN-2018 - 1/26/18 - Delay from FY 2020 to FY 2025.
SEG I-1/I-2: CONSTRUCT 4 DCS (TOLL)
BEAUMONT CHAMBERS 3187-02-010 SH 99 NONE TXDOT BEAUMONT DISTRICT $80,800,000
AT IH 10 ELIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
14248MPO PROJECT ID:
Project History:
SH 99STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, January 23, 2018
26-JAN-18 Page 69
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 14248/3187-02-010 FY 2020
CONSTRUCT 4 DIRECT CONNECTORS (TOLL)
BEAUMONT CHAMBERS 3187-02-010 SH 99 C,E NONE TXDOT BEAUMONT DISTRICT $76,000,000
AT IH 10 ELIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $72,449,952
Preliminary Engineering: $3,550,048
Construction Engineering: $2,897,998
Contingencies: $7,244,995
Indirects: $3,680,458
Total Project Cost: $89,823,451
Right Of Way: ---
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$76,000,000
14248MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 99STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-TOLL: --- $76,000,000 --- $76,000,000 --- ---
Funding by Share: --- --- $76,000,000 --- ---$76,000,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 70
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 16347/0028-04-069 FY 2024
Amendment #JAN-2018 -1/26/18- Add TxDOT BMT District Cat 4 connectivity
project to the RTP.
RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY WITH CONTINUOUS LEFT TURN
LANE
BEAUMONT LIBERTY 0028-04-069 US 90 C DEVERS TXDOT BEAUMONT DISTRICT $40,000,000
FM 160
SH 61
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $40,000,000
Preliminary Engineering: $1,960,000
Construction Engineering: $1,600,000
Contingencies: $4,000,000
Indirects: $2,032,000
Total Project Cost: $49,592,000
Right Of Way: ---
Bond Financing: ---
4FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$40,000,000
16347MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
US 90STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE: $32,000,000 $8,000,000 --- $40,000,000 --- ---
Funding by Share: $32,000,000 --- $40,000,000 --- ---$8,000,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 71
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16347/0028-04-069
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 72
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 499/0523-09-009 FY 2023
Amendment #JAN-2018 - 1/26/18 - ADVANCE TO FY 2023 AND UPDATE CAT 2
FUNDING. *** Amendment #2040-3 - 4/22/16 - Program in FY 2025 with PROP-7
funding.
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE
ACCOMMODATIONS
HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $40,100,000
FM 1774
W OF FM 149
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $40,100,000
Preliminary Engineering: $1,964,900
Construction Engineering: $1,604,000
Contingencies: $4,010,000
Indirects: $2,037,080
Total Project Cost: $54,678,777
Right Of Way: $4,962,797
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$40,100,000
499MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $32,080,000 $8,020,000 --- $40,100,000 --- ---
Funding by Share: $32,080,000 --- $40,100,000 --- ---$8,020,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 73
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 499/0523-09-009 FY 2025
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE
ACCOMMODATIONS
HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $66,474,000
FM 1774
W OF FM 149
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $66,474,000
Preliminary Engineering: $3,257,226
Construction Engineering: $2,658,960
Contingencies: $6,647,400
Indirects: $3,376,879
Total Project Cost: $82,414,465
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$66,474,000
499MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $66,474,000 --- $66,474,000 --- ---
Funding by Share: --- --- $66,474,000 --- ---$66,474,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 74
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 501/0523-08-007 FY 2023
Amendment #JAN-2018 - 1/26/18 - Split off 0523-04-017, advance project to FY
2023 and adjust funding. *** Amendment #2040-3 - 4/22/16 - Program in FY 2025
with PROP-1 funding.
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE
ACCOMMODATIONS
HOUSTON MONTGOMERY 0523-08-007 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $26,900,000
WALLER C/L
FM 1774
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $26,900,000
Preliminary Engineering: $1,318,100
Construction Engineering: $1,076,000
Contingencies: $2,690,000
Indirects: $1,366,520
Total Project Cost: $48,068,620
Right Of Way: $14,718,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$26,900,000
501MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $21,520,000 $5,380,000 --- $26,900,000 --- ---
Funding by Share: $21,520,000 --- $26,900,000 --- ---$5,380,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 75
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 501/0523-08-007 FY 2025
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LFET TURN LANE AND BICYCLE
ACCOMODATIONS
HOUSTON MONTGOMERY 0523-08-007 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $44,592,000
JOSEPH RD
FM 1774
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $44,592,000
Preliminary Engineering: $2,185,008
Construction Engineering: $1,783,680
Contingencies: $4,459,200
Indirects: $2,265,274
Total Project Cost: $55,285,162
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$44,592,000
501MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-1: --- $44,592,000 --- $44,592,000 --- ---
Funding by Share: --- --- $44,592,000 --- ---$44,592,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 76
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 16315/0523-04-017 FY 2023
Amendment #JAN-2018 -1/26/18 - Split segment in Waller Co. from existing
project and advance construction funding to FY2023. No change in scope.
WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LFET TURN LANE AND BICYCLE
ACCOMODATIONS
HOUSTON MONTGOMERY 0523-04-017 FM 1488 C NONE TXDOT HOUSTON DISTRICT $2,000,000
W OF JOSEPH RD
MONTGOMERY C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $2,000,000
Preliminary Engineering: $98,000
Construction Engineering: $120,000
Contingencies: $200,000
Indirects: $101,600
Total Project Cost: $2,519,600
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$2,000,000
16315MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 1488STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $1,600,000 $400,000 --- $2,000,000 --- ---
Funding by Share: $1,600,000 --- $2,000,000 --- ---$400,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 77
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 16315/0523-04-017
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 78
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 514/3049-01-022 FY 2022
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2022, modify
Cat-2 funding and reflect potential use of federal funds. *** Amendment #2040-3 -
4/22/16 - Modify description and program funding.
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN AND RAILROAD OVERPASS
HOUSTON GALVESTON 3049-01-022 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $31,127,000
EDMUNDS WAY
FM 1266
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $31,127,000
Preliminary Engineering: $1,525,223
Construction Engineering: $1,245,080
Contingencies: $3,112,700
Indirects: $1,581,252
Total Project Cost: $44,741,255
Right Of Way: $6,150,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$31,127,000
514MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $24,901,600 $6,225,400 --- $31,127,000 --- ---
Funding by Share: $24,901,600 --- $31,127,000 --- ---$6,225,400
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 79
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 514/3049-01-022 FY 2024
WIDEN FROM 2 TO 4 LANES WITH OVERPASS
HOUSTON GALVESTON 3049-01-022 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $61,003,000
EDMUNDS WAY
FM 1266
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $61,003,000
Preliminary Engineering: $2,989,147
Construction Engineering: $2,440,120
Contingencies: $6,100,300
Indirects: $3,098,952
Total Project Cost: $75,631,519
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$61,003,000
514MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $61,003,000 --- $61,003,000 --- ---
Funding by Share: --- --- $61,003,000 --- ---$61,003,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 80
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 10144/0978-02-053 FY 2023
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2025 to FY 2023, modify
Cat-2 funding and reflect potential use of federal funds. *** Amendment #2040-3 -
4/22/16 - Advance to FY 2025, modify description and program funding.
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN
HOUSTON GALVESTON 0978-02-053 FM 646 C TXDOT HOUSTON DISTRICT $7,000,000
FM 3436
SH 146
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $7,000,000
Preliminary Engineering: $343,000
Construction Engineering: $350,000
Contingencies: $700,000
Indirects: $355,600
Total Project Cost: $12,968,600
Right Of Way: $4,220,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$7,000,000
10144MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $5,600,000 $1,400,000 --- $7,000,000 --- ---
Funding by Share: $5,600,000 --- $7,000,000 --- ---$1,400,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 81
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 10144/0978-02-053 FY 2025
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN
HOUSTON GALVESTON 0978-02-053 FM 646 C TXDOT HOUSTON DISTRICT $14,422,000
FM 3436
SH 146
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $14,422,000
Preliminary Engineering: $706,678
Construction Engineering: $721,100
Contingencies: $1,442,200
Indirects: $732,638
Total Project Cost: $22,244,616
Right Of Way: $4,220,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$14,422,000
10144MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $14,422,000 --- $14,422,000 --- ---
Funding by Share: --- --- $14,422,000 --- ---$14,422,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 82
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 10920/3049-01-023 FY 2023
Amendment #JAN-2018 - 1/26/18 - Advance project from FY 2025 to FY 2023,
modify Cat-2 funding and reflect potential use of federal funds. *** Amendment #
2040-3 - 4/22/16 - Advance to FY 2025, modify description and program funding.
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN
HOUSTON GALVESTON 3049-01-023 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $21,200,000
FM 1266
FM 3436
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $21,200,000
Preliminary Engineering: $1,038,800
Construction Engineering: $1,060,000
Contingencies: $2,120,000
Indirects: $1,076,960
Total Project Cost: $34,895,760
Right Of Way: $8,400,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$21,200,000
10920MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $16,960,000 $4,240,000 --- $21,200,000 --- ---
Funding by Share: $16,960,000 --- $21,200,000 --- ---$4,240,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 83
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 10920/3049-01-023 FY 2025
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN
HOUSTON GALVESTON 3049-01-023 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $39,785,000
FM 1266
FM 3436
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $39,785,000
Preliminary Engineering: $1,949,465
Construction Engineering: $1,591,400
Contingencies: $3,978,500
Indirects: $2,021,078
Total Project Cost: $57,725,443
Right Of Way: $8,400,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$39,785,000
10920MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
FM 646STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $39,785,000 --- $39,785,000 --- ---
Funding by Share: --- --- $39,785,000 --- ---$39,785,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 84
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 504/0338-04-060 FY 2021
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2021, modify
funding source to Cat-4 connectivity. *** Amendment #2040-3 - 4/22/16 - Program
in FY 2024 with PROP-7 funding.
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIANS AND INTERSECTION
IMPROVEMENTS
HOUSTON MONTGOMERY 0338-04-060 SH 105 C CONROE TXDOT HOUSTON DISTRICT $21,400,000
10TH ST
SL 336
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $21,400,000
Preliminary Engineering: $1,048,600
Construction Engineering: $1,070,000
Contingencies: $2,140,000
Indirects: $1,087,120
Total Project Cost: $28,051,690
Right Of Way: $1,305,970
Bond Financing: ---
4FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$21,400,000
504MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE: --- $21,400,000 --- $21,400,000 --- ---
Funding by Share: --- --- $21,400,000 --- ---$21,400,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 85
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 504/0338-04-060 FY 2024
WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIANS AND INTERSECTION
IMPROVEMENTS
HOUSTON MONTGOMERY 0338-04-060 SH 105 C CONROE TXDOT HOUSTON DISTRICT $34,110,000
10TH ST
LP 336
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $34,110,000
Preliminary Engineering: $1,671,390
Construction Engineering: $1,364,400
Contingencies: $3,411,000
Indirects: $1,732,788
Total Project Cost: $42,289,578
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$34,110,000
504MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $34,110,000 --- $34,110,000 --- ---
Funding by Share: --- --- $34,110,000 --- ---$34,110,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 86
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 7705/0338-06-011 FY 2022
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2022 and modify
funding. *** Amendment #2040-3 - 4/22/16 - Not in TMA. Information Only.
INFORMATION ONLY (PROJECT IN SAN JACINTO CO): WIDEN TO 4-LANE DIVIDED RURAL
ROADWAY WITH INTERSECTION IMPROVEMENTS
LUFKIN SAN JACINTO 0338-06-011 SH 105 C NONE TXDOT HOUSTON DISTRICT $10,000,000
MONTGOMERY C/L
MONTGOMERY C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $10,000,000
Preliminary Engineering: $490,000
Construction Engineering: $500,000
Contingencies: $1,000,000
Indirects: $508,000
Total Project Cost: $12,863,760
Right Of Way: $365,760
Bond Financing: ---
4FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$10,000,000
7705MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE: --- $10,000,000 --- $10,000,000 --- ---
Funding by Share: --- --- $10,000,000 --- ---$10,000,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 87
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 7705/0338-06-011 FY 2024
INFORMATION ONLY (PROJECT IN SAN JACINTO CO): WIDEN TO 4-LANE DIVIDED RURAL
ROADWAY WITH INTERSECTION IMPROVEMENTS
LUFKIN SAN JACINTO 0338-06-011 SH 105 C NONE TXDOT HOUSTON DISTRICT $15,939,000
MONTGOMERY C/L
MONTGOMERY C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $15,939,000
Preliminary Engineering: $781,011
Construction Engineering: $796,950
Contingencies: $1,593,900
Indirects: $809,701
Total Project Cost: $21,170,562
Right Of Way: $1,250,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$15,939,000
7705MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $15,939,000 --- $15,939,000 --- ---
Funding by Share: --- --- $15,939,000 --- ---$15,939,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 88
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 7706/0338-07-019 FY 2023
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2023 and modify
funding. *** Amendment #2040-3 - 4/22/16 - Program in FY 2024 with PROP-7
funding.
WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS
HOUSTON MONTGOMERY 0338-07-019 SH 105 C NONE TXDOT HOUSTON DISTRICT $26,900,000
SAN JACINTO C/L
LIBERTY C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $26,900,000
Preliminary Engineering: $1,318,100
Construction Engineering: $1,076,000
Contingencies: $2,690,000
Indirects: $1,366,520
Total Project Cost: $34,074,940
Right Of Way: $724,320
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$26,900,000
7706MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: --- $26,900,000 --- $26,900,000 --- ---
Funding by Share: --- --- $26,900,000 --- ---$26,900,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017
26-JAN-18 Page 89
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 7706/0338-07-019 FY 2024
WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS
HOUSTON MONTGOMERY 0338-07-019 SH 105 C NONE TXDOT HOUSTON DISTRICT $47,181,000
SAN JACINTO C/L
LIBERTY C/L
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $47,181,000
Preliminary Engineering: $2,311,869
Construction Engineering: $1,887,240
Contingencies: $4,718,100
Indirects: $2,396,795
Total Project Cost: $62,895,004
Right Of Way: $4,400,000
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$47,181,000
7706MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 105STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-PROP-7: --- $47,181,000 --- $47,181,000 --- ---
Funding by Share: --- --- $47,181,000 --- ---$47,181,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 90
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 467/0389-07-025 FY 2021
Amendment #JAN-2018 - 1/26/18 - Advance from FY 2030 to FY 2021. TxDOT
Cat-6 (bridge) authorized for $15m.
CONSTRUCT RR OVERPASS
HOUSTON GALVESTON 0389-07-025 SH 146 TEXAS CITY TXDOT HOUSTON DISTRICT $39,165,000
FM 519
SL 197
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
467MPO PROJECT ID:
Project History:
SH 146STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 91
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 467/0389-07-025 FY 2030
CONSTRUCT RR OVERPASS
HOUSTON GALVESTON 0389-07-025 SH 146 TEXAS CITY TXDOT HOUSTON DISTRICT $55,225,258
FM 519
SL 197
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
MTP REFERENCE:
467MPO PROJECT ID:
Project History:
SH 146STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 92
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 13841/0389-05-129 FY 2023
Amendment #JAN-2018 -1/26/18 - Add project to RTP. Project eliminates
bottleneck between existing segment and planning improvements
CONSTRUCT NEW CONCRETE PAVEMENT TO REMOVE BOTTLE NECK
HOUSTON HARRIS 0389-05-129 SH 146 C LA PORTE TXDOT HOUSTON DISTRICT $250,000
N OF FAIRMONT PKWY
SPENCER HWY
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $250,000
Preliminary Engineering: $12,250
Construction Engineering: $22,500
Contingencies: $25,000
Indirects: $12,700
Total Project Cost: $322,450
Right Of Way: ---
Bond Financing: ---
2FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$250,000
13841MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 146STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA: $200,000 $50,000 --- $250,000 --- ---
Funding by Share: $200,000 --- $250,000 --- ---$50,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 93
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 13841/0389-05-129
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 94
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
PROPOSED VERSION
MPOID/CSJ: 251/0111-08-100 FY 2019
Amendment #JAN-2018 -1/26/18 - Add to FY 2019 of the TIP. Funding from Cat 4
(connectivity) in 2018 UTP.
WIDEN FROM 2 TO 4 LANES (SEG 15)
HOUSTON BRAZORIA 0111-08-100 SH 36 C FREEPORT TXDOT HOUSTON DISTRICT $8,500,000
S OF THE BRAZOS RIVER
FM 1495
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $8,500,000
Preliminary Engineering: $416,500
Construction Engineering: $425,000
Contingencies: $850,000
Indirects: $431,800
Total Project Cost: $10,623,300
Right Of Way: ---
Bond Financing: ---
4FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$8,500,000
251MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
SH 36STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE: $6,800,000 $1,700,000 --- $8,500,000 --- ---
Funding by Share: $6,800,000 --- $8,500,000 --- ---$1,700,000
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 95
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
OLD VERSION
MPOID/CSJ: 251/0111-08-100
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 96
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2018 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOID/CSJ: 16016/0050-09-089 CANCELLED
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018
26-JAN-18 Page 97
2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM
2040 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
OLD VERSION
MPOID/CSJ: 16016/0050-09-089 FY 2015
Amendment #PENDING - 12/15/17 - Cancel project. Existing access from 1-lane
reversible HOV will be preserved.
CONSTRUCT 3-LANE REVERSIBLE MANAGED LANE CONNECTOR AND T-RAMP TO METRO PARK &
RIDE
HOUSTON HARRIS 0050-09-089 US 290 C,E,R JERSEY VILLAGE TXDOT HOUSTON DISTRICT $26,000,000
W OF FM 529
W OF LITTLE YORK W
LIMITS FROM:
TIP
DESCRIPTION:
REMARKS:
LIMITS TO:
Total Project Cost Information:
Construction: $17,452,007
Preliminary Engineering: $855,148
Construction Engineering: $698,080
Contingencies: $1,745,201
Indirects: $886,562
Total Project Cost: $26,000,000
Right Of Way: $4,363,002
Bond Financing: ---
3FUNDING CATEGORY:
MTP REFERENCE:
Cost of
Approved
Phases:
$26,000,000
16016MPO PROJECT ID:
Authorized Funding by Category/Share:
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History:
US 290STREET:
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-LOCAL: --- --- $26,000,000 $26,000,000 --- ---
Funding by Share: --- $26,000,000 $26,000,000 --- --- ---
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017
JANUARY 2018 MODIFICATIONS AND PREVIEWS
26-JAN-18 Page 98
Top Related