GOVERNMENT OF KERALA
PUBLIC WORKS DEPARTMENT
(PROJECT MANAGEMENT TEAM)
INVITATION FOR BIDS
Loan Number ……………
KERALA STATE TRANSPORT PROJECT
Upgradation of the Road from Thalassery (Km 1+200) to Valavupara (Km 55+200) of SH-30
Contract No. KSTP/PMT/UG-III
Bill of Quantities
Volume – III (Bill of Quantities for Upgradation)
December 2012
VOLUME III
Bill of Quantities CONTENTS (i) Bill of Quantities (For Upgradation of the Road from Thalassey (Km 1+200) to
Valavupara (Km 55+200) of SH-30 )
BILL OF QUANTITIES
Grand Summary CONTRACT NO. : KSTP/PMT/UG-III
Bill No. Description Amount (Rs)
Bill no. 1 General items (Provisional)
Bill no. 1A General items
Bill no. 2 Site Clearance
Bill no. 3 Earthwork
Bill no. 4 Drains and Walling
Bill no. 5 Non-Bituminous Sub-base and Base
Bill no. 6 Bituminous Bases,Surface courses
Bill no. 7 ROB,Bridges, Culverts and Protective works
Bill no. 8 Miscellaneous items
Bill no. 9 Street lighting
Bill no. 10 Total for 'Daywork (provisional) *
Bill no. 11 Environmental Impact mitigation works
Bill no. 12 Electrical Utility Shifting
Bill no. 13 Water Utility Shifting
BID PRICE( Carried forward to Form of Bid)
BILL OF QUANTITIES
BILL NO. 1 : GENERAL ITEMS (PROVISIONAL SUM)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
120-01 120 Provision of rented site office of about 120 sqm including provision of Furniture and Equipment for site office for the Engineer complete
month 30
120-01a 120 Maintaining Engineers site
office by providing assistance in keeping the office clean and tidy and with supply of water and electricity
month 30
124-01a 124 Procure (purchase) and supply
brand new veh for employer and engineer including registration ,full comprehensive insurance(first yr),no plate,road tax..etc a}mahindra scopio,b)innova Type 1 Vehicle, complete
No 2
124-01b 124 Providing and Maintenance of Type 1 Vehicles
veh-month
60
124-02a 124 Procure (purchase) and supply brand new veh for employer and engineer including registration ,full comprehensive insurance(first yr),no plate,road tax..etc Type 2 Vehicle complete
month 2
124-02b 124 Providing and Maintenance of
Type 2 Vehicles veh-
month 60
Carried Forward
BILL OF QUANTITIES
BILL NO. 1 : GENERAL ITEMS (PROVISIONAL SUM)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
124-03a 124 Procure (purchase) and supply brand new veh for employer and engineer including registration ,full comprehensive insurance(first yr),no plate,road tax..etc Type 3 Vehicle complete
No 3
124-03b 124 Providing and Maintenance of
Type 3 Vehicles veh-
month 90
125-01 125 Supply of video/Tapes/CD
prior to construction and after completion
No. of albums
6
Total Bill no 1 - Carried
Forward to summary
BILL OF QUANTITIES
BILL NO. 1 : GENERAL ITEMS (CONTD.) CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
112-02 112/305 Grading / draining shoulder ( Unit of measurment is for one side of roadway)
lm 2550
112-03 110.1 Loosening and recompacting
the trenches made in shoulder portions complete
lm 50000
112-04 312 Cleaning Culverts No 13
112-05 3006 Cleaning Longitudinal drains lm 2550
112-06 110/170
0 M15 Concrete surround to
under ground Water pipes, including shuttering as required, as instructed on site. Depth not exeeding 1m of excavation.
cum 200
Total Bill no 1A - Carried
Forward to summary
BILL OF QUANTITIES
BILL NO. 2 : SITE CLEARANCE
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
201-01 201 Removal of Stumps & Roots of trees above 300mm-600mm girth
No. 152
201-02 201 Removal of Stumps & Roots of
trees above 600mm-900mm girth No. 102
201-03 201 Removal of Stumps & Roots of
trees above 900mm-1800mm girth.
No. 226
201-04 201 Removal of Stumps & Roots of
trees above 1800mm girth. No. 15
202-01 202 Dismantling Brick/Stone
masonry structures including disposal of resulting material and salvaging useful materials, complete
cum 860
Carried Forward
BILL OF QUANTITIES
BILL NO. 2 : SITE CLEARANCE
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 202-02 202 Same as item no. 202-01, but
for Plain cement concrete, complete
cum 570
202-03 202 Same as item no. 202-01, but
for RCC, complete cum 25
202-04 202 Same as item no. 202-01, but
for Steel structures, complete tonne 2
Total Bill No. 2 carried to
Summary
BILL OF QUANTITIES
BILL NO. 3 : EARTHWORK
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
301-01 301 Roadway excavation in ordinary soil,(as per 301.2.1 (c)&(d) of MORT&H specifications), including haul and tip to all leads, complete and as directed by the Engineer.
cum 248,731
301-02(b) 301 Roadway excavation in Hard
rock, including blasting and haul and tip to all leads & lifts, complete or as directed by the Engineer
cum 12,125
301-03 301 Earth work in excavation for
drain, including haul to tip, complete and as directed by the Engineer.
cum 14,740
301-04 301 Loosening and recompacting
subgrade in all kinds of soil, complete and as directed by the Engineer
cum 150,000
304-01 (a) 304 Earthwork in Excavation of
foundation for structures, in ordinary soil , including haul and tip to all leads,complete and as directed by the Engineer.
cum 68,879
305-01 305 Construction of embankment and shoulder with approved material from excavation of roadway, drains, culverts and other structures complete and as directed by the Engineer
cum 172,238
Carried Forward
BILL OF QUANTITIES
BILL NO. 3 : EARTHWORK
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 305-02 305 Construction of embankment
with approved material from Borrow area, complete and as directed by the Engineer
cum 222,242
305-03 305 Earthwork in fill for footpath
and service duct, complete and as directed by the Engineer.
cum 4,406
305-04 305 Construction of subgrade from road way cut material, complete and as directed by the Engineer
cum 88,100
305-05 305 Construction of subgrade with
approved materials from borrow pits, complete and as directed by the Engineer
cum 187,170
305-06 305 Backfill behind abutment,
wing walls, return walls for bridges, complete and as directed by the Engineer
cum 4,572
307-01 307 Turfing side slope of roads and
islands at major junctions with grass sods, complete and as directed by the Engineer
sqm 57,127
308-01 308 Seeding and Mulching,
complete and as directed by the Engineer
sqm 500
Total Bill No.3 carried to
Summary
BILL OF QUANTITIES
BILL NO. 4 : DRAINS AND WALLING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
309-01(a) 309 PCC M15 bed concrete for covered rectangular drain, complete
cum 210
309-01(b) 309 PCC M20 concrete for bottom
and side wall of covered rectangular drain, complete
cum 118
309-01(d) 309 RCC M20 concrete for Drain,
excluding reinforcement, for the covered rectangular drains, complete
cum 4,291
309-02(a) 309 PCC M15 bed concrete for
Edge strip, complete cum 325
309-02(b) 309 PCC M20 concrete for Edge
strip, complete cum 418
309-03 309 Providing Concrete retaining
wall of M15, complete cum 1,798
704.2-01 704.2 Providing Gabian retaining
wall, complete. cum 43,046
701.3-01 701.3 Providing geotextile filter
membrane behind RCC retaining wall
sqm 8,176
Carried Forward
BILL OF QUANTITIES
BILL NO. 4 : DRAINS AND WALLING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 1600-01 1600 Steel reinforcement (HYSD),
complete tonne 27
309-02 (d) 309 PCC M15 bed concrete for
stone masonary retaining wall,chute drain,transverse drain complete
cum 421
1200-03(b) 1200 Sand bedding as levelling
course below PCC M20 concrete for bottom and side wall of covered rectangular drain as per dwg complete
cum 707
2500-01 2500 Stone pitching on slopes and Culverts and bridges, complete and as directed by the Engineer.
cum 1,297
309-06 309 PCC M20 concrete for chute
drain and tranverse drain in slopes, complete
cum 617
409-02 409 Providing and laying
interlocking blocks for footpath as per IRC:SP-63 as per the approved dwg
sqm 75,791
309-05 309 Gratings for draining water to
drain using 50 x 6 angles and 12mm bars at 70mm spacing complete as per technical specifications and approved drawing
No. 4,998
Carried Forward
BILL OF QUANTITIES
BILL NO. 4 : DRAINS AND WALLING (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 2706-01 2706 Providing Weep holes for
Retaining Wall, completeand as directed by the Engineer.
lm 275
1700-10 1700 Construction of precast RCC
Drain of M20 Grade, aggregate size not exceeding 12 mm, true to line and grade including necessary connection at the intersecting drain, complete as per approved drawings and technical specifications.
lm 65,300
1700-11 1700 Construction of precast RCC
Slab of M20 Grade, aggregate size not exceeding 12 mm, true to line and grade, complete as per approved drawings and technical specifications.
lm 6,532
Total Bill No.4 carried to Summary
BILL OF QUANTITIES
BILL NO. 5 : NON-BITUMINOUS SUBBASE AND BASE
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
401-01 401 Providing and laying Granular Subbase for Pavement, complete and as directed by the Engineer
cum 110,748
406-01 406 Providing and laying Crushed rock wet mix macadam base for pavement including profile correcting course, complete and as directed by the Engineer
cum 153,013
Total Bill No.5 carried to Summary
BILL OF QUANTITIES
BILL NO. 6 : BASE & SURFACE COURSES
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
3004-01 3004 Filling pot holes and patch repairs on existing bituminous carriageway surfacing complete and as per the direction of the Engineer
Sqm 11,130
3004-02 3004.2 Providing and laying fog seal
using bitiminus emulsion complete and as directed by the Engineer
Sqm 37,100
3004-03 3004.5 Providing and laying 3mm
thick slurry seal with emulsified bitumen complete as per and as directed by the engineer
Sqm 3,710
502-01 502 Providing Bituminous Prime
coat over granular surface @ 7 kg. per 10 sqm of surface area,including at raised pedestrain crossing complete and as directed by the Engineer
sqm. 635,044
503-01 503 Providing Bituminous Tack coat @ 2.5 kg. per 10 sqm of surface area including at raised pedestrain crossing, complete and as directed by the Engineer
sqm. 1,258,713
507-01 507 Providing Dense Bituminous Macadam course with bitumen as per approved mix design including profile corrective course, complete and as directed by the Engineer.
cum 37,466
Carried Forward
BILL OF QUANTITIES
BILL NO. 6 : BASE & SURFACE COURSES (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 509-01 509 Providing Bituminous concrete
wearing course with bitumen as per approved mix design, complete and as directed by the Engineer
cum 24,619
512-01 512 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness ,complete and as directed by the Engineer for access to property at retaining wall location and at via duct slip road location
Sqm 11,375
Total Bill No. 6 carried to Summary
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
1600-01 1600 Steel reinforcement (HYSD), complete
tonne 1,712
1700-01 1700 Cement concrete (PCC) M-15 grade in Foundation & Substructure, complete and as directed by the Engineer.
cum 2,572
1700-02 1700 PCC M-20 grade in Footing for Foundation, complete and as directed by the Engineer.
cum 9,536
1700-03 1700 PCC M-20 grade in Pier & Solid Abutment for substructure, complete and as directed by the Engineer.
cum 4,497
1700-04 1700 RCC M-25 grade in Superstructure for Culverts, complete and as directed by the Engineer.
cum 1,502
1700-05 1700 RCC M-30 grade for Superstructure for Bridges, complete and as directed by the Engineer.
cum 300
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
1700-06 1700 PSC/RCC M-45 grade for Superstructure for Bridges, complete and as directed by the Engineer.
cum 496
1700-07 1700 RCC M-35 grade for cum 970
Superstructure for Bridges, complete and as directed by the Engineer.
2500-01 2500 Stone pitching on slopes and Culverts and bridges, complete and as directed by the Engineer.
cum 1,085
2500-02 2500 Providing filter media underneath stone pitching in slopes ,behind Abutments, return/wing walls, complete retaining walls and as directed by the Engineer
cum 3,159
2700-02 2700 RCC hand railing for bridges, complete and as directed by the Engineer
lm. 175
2900-01 2900 Providing ,laying and jointing 1200 mm. dia NP 4 Hume pipe (as per IS:458) complete and as directed by the Engineer
lm. 886
809-01 809 Providing and fixing concrete crash barrier including reinforcement steel as per drawing and as directed by the Engineer
lm. 954
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
2000-01 2005 Providing elastomeric bearing for bridgeand as directed by the Engineer
cubic cm
824,200
2600-02 2600 Providing filler expansion joints for bridges and culverts as directed by the Engineer
lm 480
1100-01 1100 RCC M-35 grade for Pile cap, complete and as directed by the Engineer.
cum. 965
1100-02 1100 RCC M-40 grade for Pile cap, complete and as directed by the Engineer.
cum. 306
1100-03 1100 Providing Bored pile, 1200 mm dia, complete and as directed by the Engineer.
lm. 1,120
1200-01 1200 Providing Steel Liner 8 mm thick for pile including Fabricating and Setting ,
mt 125
complete and as directed by the Engineer.
2705-01 2705 Providing Drainage Spouts using 100 mm dia GI pipe, complete as per IRC specifications and Drawings.
no 150
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
2706-01 2706 Providing Weep holes using 100 mm dia AC pipe, complete and as directed by the Engineer as per IRC specifications and Drawings.
lm 5,114
2815-01 2815 Repair/ cleaning of existing drainage spouts complete and as per the direction of the Engineer
no 44
2817-01 2817 Repair of expansion joints complete and as per the direction of the Engineer
lm 261
2704-01 2704 PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
cum 844
2704-02 2704 Reinforced cement concrete Grade M30 approach slab including reinforcement and formwork complete as per drawing and Technical specification
cum 1,687
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
503-03 503 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.3 kg per sqm on concrete surface treated with primer cleaned with mechanical broom all complete as per Technical specifications and as directed by the Engineer-in-charge.
sqm 8,559
503-04 503 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared nominal bituminous surface cleaned with mechanical broom all complete as per Technical specifications and as directed by the Engineer-in-charge.
sqm 8,559
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
509-03 509 Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification
cum 342
clause No. 509 complete in all respects
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
515-01 515 Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with
sqm 8,559
bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
2500-04 2503 Providing and laying boulders cum 7,695
apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
801-16 801 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
per cm ht per letter
17,400
1700-02 1700 RCC M-25 grade in Foundation for Culverts, complete and as directed by the Engineer.
cum 683
1100-05 1100 Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.
cum 113
1700-07 1700 RCC M-35 grade in Footing for Foundation, complete and as directed by the Engineer.
cum 1,328
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
1113 Pile Load Test on single Vertical Pile in accordance with IS:2911(Part-IV)
MT
1113-01 1113 a) Initial and routine load test MT 7,004 1113-02 1113 b) Lateral load test MT 704 1700-09 1700 RCC M-35 grade in Pier &
Solid Abutment for substructure, complete and as directed by the Engineer.
cum 2,301
1800-01 1800 High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
MT 67
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
2000-02 2006 Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.
tonne capacit
y
4,012
2600-01 2607 Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
Rm 270
Carried Forward
BILL OF QUANTITIES
BILL NO. 7 : BRIDGES, CULVERTS & PROTECTIVE WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
408-01b 408 RCC M-20 grade in Superstructure for kerb, complete
cum 35
and as directed by the Engineer. 2807-01 2807 Guniting concrete surface with
cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specifications.
Sqm 220
1300-02 1300 Providing plastering (1:3 cement mortar) 12mm thick on brick and concrete works and as directed by the Engineer ,complete
Sqm 224
2806-01 2806 Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical specification.
Kg 10
Total Bill No. 7 carried to Summary
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
408-01(a) 408 Providing M-15 bed concrete for concrete kerb section, complete and as directed by the Engineer.
cum 560
408-01(b) 408 Providing M-20 concrete kerb section, complete and as directed by the Engineer.
cum 1,020
801-02 801 Supplying and fixing sign boards made of High Intensity Prismatic grade sheeting as per ASTM D 495609 for Mandatory 900 mm. dia circular signs with single post as per specification and as directed by the Engineer.
No 140
801-03 801 Same as item no 801-02, but for triangular warning sign (900mm side) as per drawing with single post
No 1,255
801-05 801 Same as item no 801-02, but for mandatory octagonal stop sign with supplementary sign as per drawing with two posts
No 220
801-06 801 Same as item no 801-02, but for Give way signs, with supplementary plates as per
No 2
drawing with two posts
Carried Forward
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
801-10 801 Same as item no 801-02, but for Informatory signs as per TA-4 and TA-5 in the drawing with single posts
No 329
801-11 801 Same as item no 801-02, but for Informatory signs as per TA-6 in the drawing with single posts
No 1,370
801-12 801 Same as item no 801-02, but for informatory signs as per the
sqm. 225
drawing for Fig 15.1,Fig 15.2, Fig 15.3, Fig 15.4, Fig 15.5, Fig 15.6 and Fig 15.7 with 2 posts
801-13 801 Same as item no 801-02, but for facility information sign of ( 600 x 800mm) size as per the drawing for with single post
No 143
803-01 803 Pavement marking with hot- applied thermo plastic road marking material for all line marking as per drawing complete as per specification and as directed by the Engineer
sqm. 21,120
Carried Forward
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
803-02 803 Pavement marking with hot- applied thermo plastic road marking material for all other marking as per drawing complete as per specification and as directed by the Engineer
sqm. 8,514
805-01 805 Providing concrete delineator post as per drawing and specification and as directed by the Engineer
No 500
804-01 804 Providing and fixing Hectometre stone, complete and as directed by the Engineer
No 422
804-02 804 Providing and fixing Kilometre stone, complete and as directed by the Engineer
No 84
804-03 804 Providing and fixing 5 Kilometre stone, complete and as directed by the Engineer
No 22
814-01 815 Painting kerb and other concrete structure with black and white paint as per drawing and specification and as directed by the Engineer
sqm. 6,910
Carried Forward
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
810-01 810 Providing and fixing metal beam crash barrier, complete and as directed by the Engineer
lm. 1,810
805-02 805 Providing and fixing RCC guard post as per drawing complete and as directed by the Engineer
No 300
808-01 808 Providing, fixing and erecting 50 mm dia steel pipe railing in 2 rows duly painted 0.825 metres high above ground, 1.125 m centre to centre, complete as per approved drawings ( Hand Rail Type II ) , and as directed by the Engineer
lm 7,861
812-01 812 Providing and fixing unidirectional white Road Studs, spacing and locations as specified in the drawing complete, as per
No 106,724
specifications as directed by the Engineer
813-01 813 Providing Road Hump made of Asphalt as per drawing and as per specification and as directed by the Engineer
lm 1,018
Carried Forward
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
815-01 815 Providing and fixing 20cmx10cm retro reflective tiles and as directed by the Engineer.
sqm 34
806-01 806 Providing and fixing boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting
No 1,128
801-17 Providing and fixing LED blinkers of approved quality and make all complete and as directed by the Engineer.
No 385
801-18 Cantilever Overhead Sign - 4000mm x 1200mm
No 2
801-19 Providing Road Hump made of interlocking tiles as per drawing and as per specification and as directed by the Engineer
No 25
309-07 Providing utility duct using HDPE 300m Dia Pipe at widening road location
lm 3,293
309-10 Utility Duct demarcator using 200mm PVC Pipe 600 mm length protuding 200 mm above ground surrounded with PCC M15 concrete and marked in steel plate as Duct
No 452
Carried Forward
BILL OF QUANTITIES
BILL NO. 8 : MISCELLANEOUS ITEMS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 801-20 Supplying and fixing sign
boards made of High Intensity Prismatic grade sheeting as per ASTM D 495609 for Pedestrian Crossing Sign Board with triangular sign 90 cm and information sign of 80 x 60 cm with single post as per specification and as directed by the Engineer.
No 50
811 Signalisation of junctions Supply, installation and commissioning of Solar powered Signal Lights complete in all respect as per special specification no 811.2 based on traffic study in consultation with the Engineer/Departmental officers.
811-01 Four armed junction No 1 811-02 Three armed junction No 7
816-01 Providing and constructing Rumble strip using BC Conforming to specification 509. ,16mm high at centre ,200mmm wide placed 325mm center to center between main carriageway and paved shoulder at approved locations to control speed marked with white/yellow strips of road marking paint
Lm 77,900
801-21 Epoxy coated Overhead Gantry Sign - board
No. 6
8004-01 8000 Providing and fixing 4 Rope type wire rope safety fence as per Technical specification and drawing at specified locations as directed by the Engineer in charge
Lm 1,000
8004-02 8000 PCC M25 for foundation
concrete and end anchorage for 4 Rope typewire rope safety fence
cum 44
Total Bill No. 8 carried to
Summary
BILL OF QUANTITIES
BILL NO. 9 : STREET LIGHTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
6006-01 6000 Supply, Installation and Commissioning of 60W LED Standalone Solar Street Light mounted on Octagonal epoxy coated Galvanized Pole 7m height above ground.
No 947
Total Bill No. 9 carried to Summary
BILL OF QUANTITIES
BILL NO. 10 : DAYWORK SCHEDULE- LABOUR
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. DESCRIPTION UNIT ESTIMATE
D QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
10.01 Providing labour at site inclusive of all expenses
(i) Ganger hour 100
(ii) Labourer hour 100
(iii) Mason hour 100
(iv) Driver for vehicle upto 10 tons hour 100
(v) Operator for excavator,
dragline,shovel or crane hour 100
(vi) Operator for tractor with dozer
blade or tipper hour 100
(vii) Bitumen labour hour 100
10.02 Allow ………. *percent of
subtotal for Contractor's overhead, profit etc.
TOTAL FOR DAYWORK :
LABOUR
*To be entered by the Bidder
BILL OF QUANTITIES BILL NO. 10 : DAYWORK SCHEDULE -MATERIAL
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. DESCRIPTION UNIT ESTIMATE
D QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
10.03
Providing material at site including transportation and stacking complete in good and clean condition:
1 Asphaltic Concrete using
Rubber modified Bitumen cum 20
2 M35 Concrete conforming to
Technical specification 1700 cum 10
3 M25 Concrete conforming to
Technical specification 1700 cum 10
4 M15 Concrete conforming to
Technical specification 1700 cum 10
5 Cement conforming to IS:8112 tonne 2 6 Rubber modified Bitumen
(bulk) conforming to special specification 7000
tonne 2
7 Rubber modified Bitumen
(drum) conforming to special specification 7000
tonne 2
8 Bitumen (bulk) conforming to
IS: 73 tonne 2
9 Bitumen (drum) conforming to IS: 73
tonne 2
Subtotal
10.04 Allow *percent of subtotal for Contractors overhead profit etc. in accordance with paragraph 4 (b) above
TOTAL DAYWORK:
MATERIAL
BILL OF QUANTITIES BILL NO. 10 : DAYWORK SCHEDULE -CONTRACTOR'S EQUIPMENT
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. DESCRIPTION UNIT ESTIMATE
D QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
10.05 Providing equipment at site with operators, P.O.L. etc. complete in good working condition.
(i) Truck (10/12 tonne) Eqpt
hrs. 100
(ii) Dozer Size 2 Eqpt hrs.
100
(iii) Motor Grader Eqpt hrs.
100
(iv) Roller Static (8-10 tonne) Eqpt
hrs. 100
(v) Roller Vibratory (8-10 tonne
static) Eqpt hrs.
100
(vi) Roller Vibratory (1-2 tonne
width about 1 m) Eqpt hrs.
100
(vii) Pneumatic Tyred Roller (20 tonne)
Eqpt hrs.
100
(viii) Mobile concrete batching/mixing plant (1 cum)
Eqpt hrs.
100
(ix) Wheel Loader (1.5 cum) Eqpt
hrs. 100
Carried Forward
BILL OF QUANTITIES BILL NO. 10 : DAYWORK SCHEDULE -CONTRACTOR'S EQUIPMENT
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. DESCRIPTION UNIT ESTIMATE
D QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
(xi) Truck mounted water tanker(10 tonne)
Eqpt hrs.
100
(xii) Pumping Set (5 hp) Eqpt
hrs. 100
2400-01 2400 Carryout confirmatory bores
upto required depths at each foundation location of bridge complete in all respects including testing and interpretation of the bore data and presentation of the results as per IRC:78-1981 In all type
lm
TOTAL DAYWORK :
EQUIPMENT Carried to summary of Daywork Schedule
BILL OF QUANTITIES
BILL NO.10 : SUMMARY OF DAYWORK SCHEDULE
CONTRACT NO. : KSTP/PMT/UG-III
Sl.No DESCRIPTION AMOUNT (RS.)
1 Total For Daywork : Labour
2 Total For Daywork : Material
3 Total For Daywork : Equipment
TOTAL FOR DAYWORKS Carried over to Summary
BILL OF QUANTITIES BILL NO. 11 : ENVIRONMENTAL IMPACT MITIGATION WORKS
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
11000-02 11000 Demolishing the existing compound wall of public building
cum 3,533
and clearing debris to a designated location as approved by engineer for constructing or raising sound insulating barriers for silence zones as mentioned in the Part II, Vol.III, EMP table titled "EMAP" & MoRTH and as per design drawing.
11000-03 11000 Providing hand pumps including provision made in RAP and as mentioned in the Part II link specific EMP table titled "EMAP".
No 10
Carried Forward
BILL OF QUANTITIES BILL NO. 11 : ENVIRONMENTAL IMPACT MITIGATION WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
11000-04 11000 Constructing bus shelter for all bus laybys as detailed in the design drawing and as mentioned in the Part II link specific EMP table titled "ESMAP".
No 57
11000-05 11000 Providing sign boards
indicating major rivers,tourist location, pilgrim centres and silent zones as mentioned in the Part II link specific EMP table titled "ESMAP" & MoRTH
Sqm 50
11000-06 11000 Preserving and landscaping the
cultural properties like shrines and hyundi as mentioned in the Part II link specific EMP table titled "EMAP"& MoRTH and as per design drawing.
No 12
11000-07 11000 Demolishing the existing open
well and reconstructing the same as mentioned in the Part II, Vol. III EMP table titled "EMAP" and RAP.
No 5
Carried Forward
BILL OF QUANTITIES BILL NO. 11 : ENVIRONMENTAL IMPACT MITIGATION WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
11000-08 11000 Dismantling the existing water taps and providing new water taps as mentioned in the Part II, Vol. III EMP table titled "EMAP" and RAP.
No 25
11000-12 11000 Developing parking space for
the land acquired for auto rickshaws, cars and jeep as identified in the strip plan and as mentioned in the Part II, Vol. III EMP table titled "EMAP" & MoRTH.
sqm 140
Carried Forward
BILL OF QUANTITIES BILL NO. 11 : ENVIRONMENTAL IMPACT MITIGATION WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGUR
UNIT RATE
IN WORD
AMOUNT
E (RS.) S (RS.)
Brought Forward 11000-15 11000 Providing landscaping with
provision of solid waste collection (dust bin), sitting arrangement as per typical design drawings provided in EMP.
No 31
11000-18 11000 Planting of Trees and their
Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year)
No 2,271
11000-19 11000 Planting of trees on inner side
of the sound insulating wall as noise barrier or green barrier for silence zones and maintaining them for four years.
No 200
Carried Forward
BILL OF QUANTITIES BILL NO. 11 : ENVIRONMENTAL IMPACT MITIGATION WORKS (CONTD.)
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
11000-24 11000 Providing and maintaining water sprayer in order to water the construction surface to supress excessive dust in dry season in addition to watering for compaction
Hour 2,520
11000-25 Air quality monitoring at two
sensitive locations along the project road during construction stage.
Nos. 18
11000-26 Water quality monitoring at two major water bodies along the road during construction stage.
Nos. 8
11000-28 Concrete flooring, with slope drains and oil interceptors for hot mix plant area and work shop, vehicle washing and fuel handling area in construction camps as mentioned in the Part
Nos. 4
II, Vol. III EMP table titled "EMAP".
Total Bill No. 11 carried to Summary
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
112-08
Transporting HT PSC/RCC poles as per specifications of KSEB by hand craft for an average distance of 1 km
Nos. 950
112-09
Transporting HT PSC/RCC poles as per specifications of KSEB by hand craft for every additional 1 km
Nos. 950
112-10
Transporting a poles as per
specifications of KSEB for 1 km Nos. 540
112-11
Transporting a pole as per specifications of KSEB for every additional 1 km
Nos. 540
112-12
Fitting and erecting one HT TW/RSJ/Rail/Single pole as per specifications of KSEB in position including fixing cross arm, digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthling (excluding provision of earthing)
Nos. 668
112-13
Fitting and erecting one HT PSC/RCC pole as per specifications of KSEB in position including fixing cross arm, digging and backfilling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthling (excluding provision for earthing)
Nos. 107
112-14
Fitting and erecting one 'A' pole as per specifications of KSEB in position including fixing cross arm, digging and backfilling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthling (Excluding provision of earthing)
Nos. 109
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-15
Fitting and erecting one four legged 'A' type single pole as per specifications of KSEB in position including fixing cross arm, digging and backfilling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthling (Excluding provision of earthling)
Nos. 85
112-16
Fitting and erecting one HT Double pole as per specifications of KSEB structure using TW/RSJ/Rail poles as per specifications of KSEB in position including fixing cross arm, digging and backfilling pit in ordinary soil drawing sufficient length of GI earth leads
Nos. 35
to the ground for earthling (Excluding provision of earthling)
112-17
Fitting and erecting one HT DP RCC/PSC pole as per specifications of KSEB in position including fixing cross arm, digging and backfilling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthling (Excluding provision of earthling)
Nos. 31
112-18
Fitting of HT stay set for 11 KV poles as per specifications of KSEB including digging and backfilling pit ordinary soil
Nos. 120
112-19
Fitting of providing strut for 11KV poles as per specifications of KSEB including digging and backfilling pit in ordinary soil
Nos. 15
112-20
Fitting of providing strut using HT PSC/RCC poles as per specifications of KSEB for 11 KV poles including digging and backfilling pit in ordinary soil.
Nos. 15
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-21
Fitting of HT FLY stay for PSC/RCC poles as per specifications of KSEB including digging and backfilling pit in ordinary soil.
Nos. 48
112-22
Additional rate for excavation of pit for HT poles as per specifications of KSEB/HT stay in Hard Laterite soil.
Nos. 18
112-23
Stringing of one KM 11 KV line with ACSR Racoom conductors (3 NOS) after hitting insulators and giving jumper connections.
km 55
112-24
Fitting of 5 nos. Channel cross arm AB switch D.O fuse, LA, LT/HT connection up to OH line
Nos. 50
112-25 Errection of CT/PT unit Nos. 4 112-26
Erection of 100/150/160 KVA Transformer
Nos. 61
112-27
Erection of 250/315/500 KVA Transformer
Nos. 11
112-28
Installation of one DTR meter box
Nos. 72
112-29 Fitting of one additional Fuse unit Nos. 280 112-30 Providing one earth using GI Pipe Nos. 140 112-31
Providing coil earth using GI Pipe
Nos. 115
112-32 Fitting of 1 set (3 Nos) LA Nos. 120 112-33 Fitting of 1 set (3 Nos) D.O Fuse Nos. 280 112-34
Fitting of 1 set AB switch, LA, D.O Fuse
Nos. 350
112-35
Conveyance of one KM 11 KV line excluding post
km 55
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-36
Fitting of one additional V/Angle/Channel cross arm in existing pole as per specifications of KSEB
Nos. 1,400
112-37
Fitting of one additional V/Angle/Channel cross arm in 11 KV DP pole as per specifications of KSEB
Nos. 1,200
112-38
Fitting of LT 2 line cross arm complete
Nos. 2,000
112-39
Fitting of LT 4 line cross arm complete
Nos. 4,000
112-40
Providing barbed wire anticlimbing protection 2.5m for one 11 KV pole as per specifications of KSEB
Nos. 50
112-41
Renewal of damaged 11 KV TW/RSJ/Rail pole as per specifications of KSEB with new pole in place including excavation of pit & refilling of pit etc.
Nos. 670
112-42
Renewal of damaged 11 KV PSC/RCC poles as per specifications of KSEB with new pole a in place including excavation of pit & refilling of pit etc.
Nos. 100
112-43 Renewal of one HT pin insulator. Nos. 600
112-44
Renewal of one HT Disc insulator
Nos. 400
112-45
Reinstalling LT line on the renewal 11 KV poles as per specifications of KSEB having both HT/LT Lines
Nos. 60
112-46 Renewal of damaged 11 KV Stay Nos. 240 112-47 Renewal of damaged Strut 11 KV Nos. 140 112-48
Dismantling one damaged 11KV/TW/RSJ Rail pole as per specifications of KSEB after discounting stays struts etc
Nos. 668
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-49
Dismantling one damaged 11KV PSC/RCC pole as per specifications of KSEB after discounting stays struts etc
Nos. 100
112-50
Dismantling one damaged 11KV 'A' Type pole as per specifications of KSEB after discounting stays struts etc
Nos. 109
112-51
Dismantling one damaged 11KV 4 legged 'A' Type pole as per specifications of KSEB after disconnecting stays struts etc
Nos. 81
112-52
Dismantling one damaged 11KV Strut PSC/RCC pole as per specifications of KSEB after disconnecting stays struts etc
Nos. 120
112-53
Dismantling one damaged 11KV (3 Nos) pole as per specifications of KSEB after disconnecting stays struts etc
Nos. 40
112-54
Dismantling one damaged cross arm/V cross arm pole as per specifications of KSEB after disconnecting stays struts etc
Nos. 2,100
112-55
Dismantling one damaged AB switch after disconnecting stays struts etc
Nos. 200
112-56
Transporting one LT PSC/RCC pole as per specifications of KSEB for 1 km
Nos. 856
112-57
Transporting additional 1Km one LT PSC/RCC pole as per specifications of KSEB for 1 km
Nos. 55
112-58 Erecting one LT PSC/RCC pole Nos. 856
as per specifications of KSEB 112-59
Erecting stay for LT poles as per specifications of KSEB
Nos. 300
112-60
Erecting stay strut for LT poles as per specifications of KSEB
Nos. 120
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-61
Erecting fly stay for LT poles as per specifications of KSEB
Nos. 48
112-62
Stringing Shackling fitting cross arm etc using ACSR Conductor for one Km LT single phase etc required
Km 55
112-63
Stringing Shackling fitting cross arm etc using ACSR Conductor for one Km 3 phase LT line required
Km 55
112-64 Stringing Shackling fitting cross Nos. 600
arm etc using ACSR Conductor for one no.Section fuse required
112-65
Stringing Shackling fitting cross arm etc using ACSR Conductor for one no.LT LA required
Nos. 840
112-66
Renewal of damaged LT TW/RSJ/Rail poles as per specifications of KSEB with new PSC/RCC poles including necessary conductor (Single Phase)
Nos. 856
112-67
Renewal of damaged LT TW/RSJ/Rail poles as per specifications of KSEB with new PSC/RCC poles including necessary conductor (Three Phase)
Nos. 600
112-68
Dismantling one LT TW/RSJ Rail pole as per specifications of KSEB after disconnecting all connection
Nos. 107
112-69
Dismantling one LT PSC/RCC pole as per specifications of KSEB after disconnecting all connection
Nos. 60
112-70
Dismantling one LT stay after disconnecting all connection
Nos. 120
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-71
Dismantling one LT strut stay after disconnecting all connection
Nos. 60
112-72
Redoing single phase WP connection
Nos. 12,000
112-73 Redoing 3 phase WP connection Nos. 9,000 112-74
Dismantling & refitting 2X40W fluorescent tube light etc as required
Nos. 1,400
112-75
Dismantling & refitting ordinary CFL/LED fitting etc as required
Nos. 400
112-76
Dismantling & refitting SV/MV/MH lamp fitting etc as required
Nos. 800
112-77
Shifting of duplicate LT line including restoring supply
Nos. 400
112-78
Labor charges for fabricating MS angle providing unnecessary holes,bending,cutting,grinding including welding
kg 100,000
112-79
Laying of LT XLPE UG cable as per KSEB specification
m 2,000
112-80
Excavation of tarred/concrete portion and back filling the trench
m 500
112-81
Mounting LT UG Cable including connection etc as required
Nos. 120
Carried Forward
BILL OF QUANTITIES
BILL NO. 12 : ELECTRICAL UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-82
Labor charges for shifting 3X300 sq.mm XLPE HT UG Cable and back filing of trench
m 2,000
112-83
Labor charges for shifting 3X150 sq.mm XLPE HT UG Cable and back filing of trench
m 1,000
112-84
Laying of 3X300 sq.mm XLPE HT UG Cable and back filing of trench
m 6,000
112-85
Laying of 3X150 sq.mm XLPE HT UG Cable and back filing of trench
m 2,000
112-86
Charges for 300/150 Sq.mm cable straight joint
Nos. 400
112-87
Construction of Transformer plinth of size 1.5x1.5x1.5m
Nos. 11
112-88
Providing concrete muffing of size 45x45cmx1.5m
Nos. 180
112-89 Bake lite Fuse unit Nos. 800 112-90
25x3mm Copper strip/32x3mm Copper strip
kg 10,000
Total Bill No. 11 carried to Summary
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
FOR DISMANTLING THE Cl PIPE
112-90 Excavating in Hard soil for trenches for dismantling existing Cl pipe carefully without damaging pipe as per specifications of KWA , including excavation for socket and dressing of sides,ramming of bottom etc. with lift u p to 1.50m, stacking the excavated soil not more than 50 m clear from the edge of excavation and refilling t he trenches in layers not exceeding 20 cm depth including consolidating each layer by ramming, watering etc. complete them and depositing of surplus soil as directed.(PHED.1002)
cum 9409.51
112-91 Fencing 1.5 m height with two
rows or full horizontal bamboos tied with coir yarn on vertical bamboo fixed at 1.50 m interval including all cost and conveyance of all materials labour charges etc complete
m 5000
112-92 Cutting 250 mm C.l Pipe as per
specifications of KWA or all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll04(6)) C l PIPE - 250 MM CL LA
Nos 345
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-93 Cutting 200 mm CI Pipe as per
specifications of KWA of all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll 04(5)) Cl PIPE- 200 MM CL LA
Nos 790
112-94 Cutting 150 mm CI Pipe as per
specifications of KWA of all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc.complete.(Phed.l104(4)) C l PIPE- I50 MM CL LA
Nos 490
112-95 Cutting 100 mm CI Pipe as per
specifications of KWA of all classes diametrically perpendicular to the axis of the
Nos 325
pipe and smoothening the cut ends etc. complete. (Phed. II04(2)) C! PIPE - 100 MM CL LA
112-96 Cutting 80 mm CL Pipe as per specifications of KWA of all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc.complete.. (Phed .l I04( I)) Cl PIPE- 80 MM CL LA
Nos 200
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-97 Dismantling ,Conveying &
Stacking 250 mm Cl Pipes as per specifications of KWA & Specials, including specials and fillings after conveying them with in initial lead, and care fully lowering into site, as per the
m 1722
direction of the dept officer • 100m (Phed. 572) Cl PIPE 250 M M C L LA
112-98 Dismantling .Conveying & Stacking 200 mm C.I Pipes as per specifications of KWA & Specials, including specials and fillings after conveying them with in initial lead, and carefully lowering into site, as per the direction of the dept officer-100m (Phed. 572) Cl PIP'E - 200 MM CL LA
m 3945
112-99 Dismantling, Conveying &
Stacking 150 mm CI Pipes as per specifications of KWA & Specials. including specials and fittings after conveying them with in initial lead, and carefully lowering into site, as per the direction of the dept officer- 100m (Phed. 572) Cl PIPE - I50 MM CL LA
m 2428
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-100 Dismantling, Conveying &
Stacking 100mm CI Pipes as per specifications of KWA & Specials. Including specials and fittings after conveying them with in initial lead, and carefully lowering into site. as per the direction of the dept officer- 100m (PhD. 572) C l PIPE - 100 M M CL LA
m 1610
112-101 Dismantling, Conveying &
Stacking 80mm CI Pipes as per specifications of KWA & Specials. Including specials and fittings after conveying them with in initial lead, and carefully lowering into site. as per the direction of the dept officer- 100m (Phed. 572) C l PIPE - 80 M M CL LA
m 1000
112-102 Demolishing RCC work of Valve
chamber including separately removing and stacking available reinforcement and clearing away
cum 51.84
the debris within a distance of 150m - 10d m3 (PWD.28)
FOR RELAYING OF Cl / DI PIPE
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-103
Excavating in all classes of soil for trenches to lay pipes as per specifications of KWA including excavation for sockets and dressing of sides, ramming of bottom etc with lift up to 1.50m, stacking the excavated soil not more than 50m, clear from the edge of the excavation and refilling the trenches after laying pipes in layers not exceeding 20cm, depth including consolidating each layer by ramming. watering etc complete
cum 38655.65
then and disposing the surplus soil as directed
112-104
Fencing 1.5 m height with two rows or full horizontal bamboos tied with coir yarn on vertical bamboo fixed at 1.50 m interval including all cost and conveyance of all materials labour charges etc complete
m 25000
112-105
Conveying & Laying 250 mm CI/DI Pipes as per specifications of KWA & Specials, including specials and fittings after conveying them with in initial lead, and carefully lowering into trenches, placing in position to lines and levels ready for joint - 100m (Phed.572)
m 1750
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-106
Conveying & Laying 200 mm CI/DI Pipes as per specifications of KWA & Specials, including specials and fittings after conveying them with in initial lead, and carefully lowering into trenches, placing in position to lines and levels ready for joint - 100m (Phed.571)
m 4,000
112-107
Conveying & Laying 150 mm CI/DI Pipes as per specifications of KWA & Specials, including specials and fittings after conveying them with in initial lead, and carefully lowering into trenches, placing in position to lines and levels ready for joint - 100m (Phed.570)
m 2,460
112-108
Conveying & Laying 100 mm CI/DI Pipes as per specifications of KWA & Specials, including specials and fittings after conveying them with in initial lead, and carefully lowering into
m 3,240
trenches, placing in position to lines and levels ready for joint - 100m (Phed.568)
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-109
Conveying 63mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m.
m 7,500
(TC/KWA. I106(4))
112-110
Conveying 75mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m. (TC/KWA. I106(5))
m 1,500
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-111
Conveying & Laying 80 mm CI/DI Pipes as per specifications of KWA & Specials, including specials and fittings after conveying them with in initial lead, and carefully lowering into trenches, placing in position to lines and levels ready for joint - 100m (Phed.567)
m 1,100
112-112
Conveying 90mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m. (TC/KWA. I106(6))
m 20,000
112-113
Conveying 110mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site,
m 18,000
lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-114
Conveying 140mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the
m 1,000
required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m. (TC/KWA. I106(8))
112-115
Conveying 160mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m. (TC/KWA. I106(9))
m 4,050
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN
UNIT RATE
IN
AMOUNT
FIGURE (RS.)
WORDS (RS.)
Brought Forward 112-116
Conveying 200mm dia P.V.C pipes ( 6 kg/cm 2 ) as per specifications of KWA and specials, solvent cement from the stacking place of work site, lowering into trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure, including hire charges for all tool testing equipments. Cost and conveyance of water etc.complete. l00m. (TC/KWA. I106(9))
m 1,880
112-117
(Supplying), Conveying, threading laying and jointing 50mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 513)- for 10m
m 200
112-118
(Supplying), Conveying, threading laying and jointing 65mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 514)- for 10m
m 100
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-119
(Supplying), Conveying, threading laying and jointing 80mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 515)- for 10m
m 100
112-120
(Supplying), Conveying, threading laying and jointing 100mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 517)- for 10m
m 100
112-121
(Supplying), Conveying, threading laying and jointing 125mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 518)- for 10m
m 100
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-122
(Supplying), Conveying, threading laying and jointing 150mm dia G.l pipe as per specifications of KWA with fittings, including trenching and refilling, testing watching lighting etc complete including fencing and providing caution boards.(PH ED 519)- for 10m
m 100
112-123
Cutting 250 mm CI/DI Pipe as per specifications of KWA or all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll04(6))
Nos 50
112-124
Cutting 200 mm CI/DI Pipe as per specifications of KWA or all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll04(5))
Nos 60
112-125
Cutting 150 mm CI/DI Pipe as per specifications of KWA or all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll04(4))
Nos 50
112-126
Cutting 100 mm CI/DI Pipe as per specifications of KWA or all classes diametrically perpendicular to the axis of the
Nos 90
pipe and smoothening the cut ends etc. complete. (Phed.ll04(2))
112-127
Cutting 80 mm CI/DI Pipe as per specifications of KWA or all classes diametrically perpendicular to the axis of the pipe and smoothening the cut ends etc. complete. (Phed.ll04(1))
Nos 40
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-128
Jointing of 80 mm CI/DI Tyton pipes as per specifications of KWA already laid in trenches using rubber gaskets after cleaning the ends of pipes inserting the rubber gaskets inside the groove of sockets and making the joint water tight without causing any damages to the rubber gasket, including cost
Nos 220
of all labours, hire charges for winch and other appliances etc.complete but excluding cost of rubber gasket(TC3 AI)
112-129
Jointing of 100 mm CI/DI Tyton pipes as per specifications of KWA already laid in trenches using rubber gaskets after cleaning the ends of pipes inserting the rubber gaskets inside the groove of sockets and making the joint water tight without causing any damages to the rubber gasket, including cost of all labours, hire charges for winch and other appliances etc.complete but excluding cost of rubber gasket(TC3 AI)
Nos 575
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-130
Jointing of 150 mm CI/DI Tyton pipes as per specifications of KWA already laid in trenches using rubber gaskets after cleaning the ends of pipes inserting the rubber gaskets inside the groove of sockets and making the joint water tight without causing any damages to the rubber gasket, including cost of all labours, hire charges for winch and other appliances etc.complete but excluding cost of rubber gasket
Nos 490
112-131
Jointing of 200 mm CI/DI Tyton pipes as per specifications of KWA already laid in trenches using rubber gaskets after cleaning the ends of pipes inserting the rubber gaskets inside the groove of sockets and making the joint water tight without causing any damages to the rubber gasket, including cost of all labours, hire charges for winch and other appliances etc.complete but excluding cost of rubber gasket
Nos 790
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-132
Jointing of 250 mm CI/DI Tyton pipes as per specifications of KWA already laid in trenches using rubber gaskets after cleaning the ends of pipes inserting the rubber gaskets inside the groove of sockets and making the joint water tight without causing any damages to the rubber gasket, including cost of all labours, hire charges for winch and other appliances etc.complete but excluding cost of rubber gasket(TC3 AI)
Nos 345
112-133
Jointing of 80 mm dia C.IFlanged pipes as per specifications of KWA laid in trenches to lines and levels, inserting compressed fibre or I. R sheet cut ti suit the size of pipe and bolt holes, bolting with 8 nos. of 16 mm dia x 75 mm
Nos 40
long or nearest size bolts, nuts and washers, including conveying the jointing materials within initial lead etc. complete to make water tight joints capable of withstanding required pressure. - Each joint(Phed.620).
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-134
Jointing of 100 mm dia C.I Flanged pipes as per specifications of KWA laid in trenches to lines and levels, inserting compressed fibre or I. R sheet cut to suit the size of pipe and bolt holes, bolting with 8 nos. of 16 mm dia x 75 mm long or nearest size bolts, nuts and washers, including conveying the jointing materials within initial
Nos 60
lead etc. complete to make water tight joints capable of withstanding required pressure. - Each joint(Phed.620).
112-135
Jointing of 150 mm dia Flanged pipes as per specifications of KWA laid in trenches to lines and levels, inserting compressed fibre or I. R sheet cut ti suit the size of pipe and bolt holes, bolting with 8 nos. of 16 mm dia x 75 mm long or nearest size bolts, nuts and washers, including conveying the jointing materials within initial lead etc. complete to make water tight joints capable of withstanding required pressure. - Each joint(Phed.620).
Nos 490
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
112-136
Jointing of 200 mm dia C.I Flanged pipes as per specifications of KWA laid in trenches to lines and levels, inserting compressed fibre or I. R sheet cut ti suit the size of pipe and bolt holes, bolting with 8 nos. of 16 mm dia x 75 mm long or nearest size bolts, nuts and washers, including conveying the jointing materials within initial lead etc. complete to make water tight joints capable of withstanding required pressure. - Each joint(Phed.620).
Nos 790
112-137
Jointing of 250 mm dia C.IFlanged pipes as per specifications of KWA laid in trenches to lines and levels, inserting compressed fibre or I. R sheet cut ti suit the size of pipe and bolt holes, bolting with 8 nos. of 16 mm dia x 75 mm long or nearest size bolts, nuts and washers, including conveying the jointing materials within initial lead etc. complete to make water tight joints capable of withstanding required pressure. - Each joint(Phed.620).
Nos 345
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-138
Conveying and fixing 20 mm dia CI air valve including cost and conveyance of all materials.lncluding all charges etc complete
Nos 40
112-139
Testing 80mm dia pipe line as per specifications of KWA with water to the required test pressure, including all cost and conveyance of water and labour charges and hire for tools and equipments etc. complete.- 80 m test length. (Phed.1016)
Nos 1,100
112-140 Cl IDI PIPE- 80 MM CL LA m 3,240 112-141
Testing I00mm dia pipe line as per specifications of KWA with water to the required test pressure, including all cost and
m 2,460
conveyance of water und labour charges and hire for tools and equipments etc.complete.- 150 m test length. (Phed. I016)
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-142
Testing 200mm dia pipe line as per specifications of KWA with water to the required test pressure, including all cost and conveyance of water and labour charges and hire for tools and equipments etc. complete.- 200 m test length. (Phed.1016)
m 4,000
112-143 Cl IDI PIPE- 100 MM CL LA m 1,750 112-144
Testing 250mm dia pipe line as per specifications of KWA with water to the required test pressure, including all cost and conveyance of water and labour
Nos 5
charges and hire for tools and equipments etc. complete.- 150 m test length. (Phed.1016)
112-145 Cl IDI PIPE- 250 MM CL LA Nos 13 112-146
Conveying from stack with ion initial lead 250 mm Cl P/E non- raising sluice valve,250 m CI P/E valve
Nos 12
112-147
Conveying from stack with ion initial lead 200 mm Cl P/E non- raising sluice valve,200 m CI P/E valve
Nos 15
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-148
Conveying from stack with ion initial lead 80 mm Cl P/E non- raising sluice valve,80 m CI P/E valve
Nos 15
112-149
Conveying and fixing 50 mm GM valve in line including,50 m GM
Nos 30
valve 112-150
R .C.C. I :2:4 using 20mm nominal size broken stone including all form work concrete identification board to the pipe line and for anchor block at bend portion
cum 46
112-151
Reinforcement for R.C.C work bend, tied and placed in position (plain grills requiring bending cold) include cost and conveyance of all materials, labour charges etc up to height 5.00 m from GL
Qtl 60
112-152
Plastering with cm 1:3. 12 mm thick one coat floated hard and trowelled smooth including all cost of materials and labour charges etc complete
Sqm 800
Construction of value
chamber
112-153
Earth work excavation in hard soil and depositing on bank with initial lead up to 50 m and lift up to 1.5 m including ,breaking clods, watering, ramming, sectioning of spoil bank, etc complete
cum 131
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward 112-154
Cement concrete I :4:8 using 40 mm nominal size broken stones including cost of materials, conveyance and labour charges ,watering, curing etc
cum 12
112-155
Reinforced Cement concrete M 20 grade using 20mm( nominal size) broken stones including cost and conveyance of materials , labour charges,watering ,curing etc complete but excluding the cost of reinforcement for valve chamber
dm3 61,500
112-156
Reinforcement for R.C.C work bend, tied and placed in position (plain grills requiring bending cold ) include cost and conveyance o f all materials, labour charges etc up to height 5.00 m from GL
Qtl 72
112-157
Plastering with cm 1:3, 12 mm thick one coat floated hard and trowelled smooth including all cost of materials and labour charges etc complete
Sqm 480
Carried Forward
BILL OF QUANTITIES
BILL NO. 13 : WATER UTILITY SHIFTING
CONTRACT NO. : KSTP/PMT/UG-III
PAY ITEM NO. SPEC. DESCRIPTION UNIT ESTIMATED QUANTITY
UNIT RATE
IN FIGURE (RS.)
UNIT RATE
IN WORDS (RS.)
AMOUNT
Brought Forward
FOR REINSTATING HOUSE SERVICE CONNECTION
112-158
Supplying conveying and fixing all house service connection materials including all labour charges etc complete
Nos 500
112-159
Supplying conveying and fixing all public tap connection materials including all labour charges etc complete
Nos 150
Total Bill No. 13 carried to
Summary
Top Related